ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Woods Platina Wing D - Oak Tower

Registered Litigation declared Residential / Group Housing project

Woods Platina Wing D - Oak Tower

By Sukoon Developers Pvt Ltd

RG-MH-46205 · RERA P51800049102 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 85%
54 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

Woods Platina Wing D - Oak Tower is a Residential / Group Housing project by Sukoon Developers Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049102 on 30 Jan 2023. Possession is promised by 31 Dec 2026. 28 of the 82 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameWoods Platina Wing D - Oak Tower
  • TypeResidential / Group Housing
  • Location
    • Capt Samant Road
    • Jogeshwari West
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049102
  • ReraGenie IDRG-MH-46205

Builder

  • NameSukoon Developers Pvt Ltd
  • Entity typeCompany
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed142 files

Current status

34%28 of 82 units booked
85.5%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing D - Oak TowerNA222182082

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

Wing D - Oak Tower: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area480 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5764.89
Proposed, not sanctioned5,665 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR AYESHA TOWER SV ROAD JOGESHWARI WEST MUMBAI 400102
Estimated costRs 31.86 cr
Cost incurredRs 27.24 cr
Work done85.5%
BuildingWingEstimatedIncurred
Wing D - Oak TowerNARs 31.86 crRs 27.24 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectReza Kabul
ArchitectUmesh Bhatt Architects
EngineerDwijen Bhatt
EngineerAbdul Lateef Qureshi
Chartered AccountantMIM BORA
Chartered AccountantK M THAKER & Associates
Chartered AccountantVinod Panchamia & Associates
PartnerRole in project
Sukoon Developers Pvt Ltd-

Litigation declared3

CaseCourtStatus
5471/2006CITY CIVIL COURT DINDOSHIRECORDING OF EVIDENCE
178/2022National Consumer Dispute Redressal Commissionfor Filing of Written Version
5471/2006CITY CIVIL COURT DINDOSHIOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Oak Tower dt 02-04-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Oak Tower dt 31-3-2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form-3-Oak-Q4-2025-2026-31-03-2026 created RERA upload.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1-Arch Cert-OAK-Q3-2025-2026-31-12-2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form-2-Eng Cert-OAK-Q3-2025-2026-31-12-2025.pdf3 Feb 2026
Withdrawal Update Form 3File: Form-3-OAK-Q3-2025-2026-31-12-2025 created RERA signed.pdf3 Feb 2026
Withdrawal Update Form 1File: Form-1-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form-1-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form-1-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form-1-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form-2-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form-2-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form-2-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form-2-Oak-Q2-2025-2026-30-09-2025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form-3-Oak-Q2-2025-2026-30-09-2025 created RERA signed.pdf27 Oct 2025
Withdrawal Update Form 3File: Form-3-Oak-Q2-2025-2026-30-09-2025 created RERA signed.pdf27 Oct 2025
Withdrawal Update Form 3File: Form-3-Oak-Q2-2025-2026-30-09-2025 created RERA signed.pdf27 Oct 2025
Withdrawal Update Form 3File: Form-3-Oak-Q2-2025-2026-30-09-2025 created RERA signed.pdf27 Oct 2025
Building plan approvalFile: Oak Amended letter 01-12-23.pdf25 Sep 2025
Building plan approvalFile: 1 - Oak Approved Plan 1-12-23 Sheet 1.pdf25 Sep 2025
Building plan approvalFile: 2 - Oak Approved Plan 1-12-23 Sheet 2.pdf25 Sep 2025
Building plan approvalFile: 3 - Oak Approved Plan 1-12-23 Sheet 3.pdf25 Sep 2025
Building plan approvalFile: 4 - Oak Approved Plan 1-12-23 Sheet 4 to 6.pdf25 Sep 2025
Building plan approvalFile: 5 - Oak Approved Plan 1-12-23 Sheet 7 to 8.pdf25 Sep 2025
Building plan approvalFile: 6 - Oak Approved Plan 1-12-23 Sheet 9.pdf25 Sep 2025
Building plan approvalFile: 7 - Oak Approved Plan 1-12-23 Sheet 10.pdf25 Sep 2025
Building plan approvalFile: 8 - Oak Approved Plan 1-12-23 Sheet 11.pdf25 Sep 2025
Commencement certificateFile: 9 - Oak Full CC upto 21st Floor.pdf25 Sep 2025
Withdrawal Update Form 1File: FORM-1-OAK-Q1-2025-2026-30-6-2025.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2-OAK-Q1-2025-2026-30-6-2025.pdf24 Sep 2025
Withdrawal Update Form 3File: Form-3-Oak-Q1-2025-2026-30-06-2025 created RERA signed.pdf24 Sep 2025
Form 1File: OAK-FORM 1-Q4-2022-2023.pdf9 Sep 2025
Form 2File: OAK FORM 2 Q4 22-23.pdf9 Sep 2025
Form 3File: OAK FORM 3 Q4 22-23.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 1-Disclosure of Sold - Booked Inventory Oak as on 31-03-2023.pdf9 Sep 2025
Form 1File: OAK-FORM 1-Q1-2023-2024.pdf9 Sep 2025
Form 2File: OAK FORM 2 Q1 23-24.pdf9 Sep 2025
Form 3File: OAK FORM 3 Q1 23-24.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 2-Disclosure of Sold - Booked Inventory Oak as on 30-06-2023.pdf9 Sep 2025
Form 1File: Form 1 - Arch Cert - Oak - Q2 - 23-24.pdf9 Sep 2025
Form 2File: FORM 2 - Eng Cert - OAK - Q2 - 23-24.pdf9 Sep 2025
Form 3File: FORM 3 - CA Cert - Oak - Q2 - 23-24.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 3-Disclosure of Sold - Booked Inventory Oak as on 30-09-2023.pdf9 Sep 2025
Form 1File: Form 1(Arch Cert Oak Q3 23-24).pdf9 Sep 2025
Form 2File: Form 2(Engineers Cert Oak Q3 23-24).pdf9 Sep 2025
Form 3File: Form 3 Word Format -OAK Q3 2023-2024 PDF.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4-Disclosure of Sold - Booked Inventory Oak as on 31-12-2023.pdf9 Sep 2025
Form 1File: Form 1 (Arch Cert Oak Q4 23-24).pdf9 Sep 2025
Form 2File: Form 2 (Engineers Cert Oak Q4 23-24).pdf9 Sep 2025
Form 3File: Form 3 Word Format -OAK Q4 2023-2024 PDF.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 5-Disclosure of Sold - Booked Inventory Oak as on 31-03-2024.pdf9 Sep 2025
Form 1File: Form 1(Arch Cert Oak Q1 24-25).pdf9 Sep 2025
Form 2File: Form 2(Engineers Cert Oak Q1 24-25).pdf9 Sep 2025
Form 3File: OAK FORM 3 Q1 24-25.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 6-Disclosure of Sold - Booked Inventory Oak as on 30-06-2024.pdf9 Sep 2025
Form 1File: Form 1(Arch Cert Oak Q2 24-25).pdf9 Sep 2025
Form 2File: FORM 2 - Eng Cert - OAK - Q2 - 24-25.pdf9 Sep 2025
Form 3File: FORM 3 - CA Cert - Oak - Q2 - 24-25.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: 7-Disclosure of Sold - Booked Inventory Oak as on 30-09-2024.pdf9 Sep 2025
Form 1File: Form 1(Arch Cert Oak Q3 24-25).pdf9 Sep 2025
Form 2File: FORM 2 - Eng Cert - OAK - Q3 - 24-25.pdf9 Sep 2025
Form 3File: FORM 3 - CA Cert - Oak - Q3 - 24-25.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory list - Oak - Q3 - 2024-2025.pdf9 Sep 2025
Form 1File: FORM-1-Oak-Q4-2024-2025-31-03-2025.pdf9 Sep 2025
Form 2File: FORM-2-Oak-Q4-2024-2025-31-03-2025.pdf9 Sep 2025
Form 3File: FORM- 3-Oak-Q4-2024-2025-31-03-2025.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure-Oak-Q4-2024-2025-31-03-2025.pdf9 Sep 2025
Form 2A (FY 2022-2023)File: OAK FORM 2A 22-23.pdf9 Sep 2025
Form 2A (FY 2023-2024)File: OAK FORM 2A 23-24.pdf9 Sep 2025
Form 2A (FY 2024-2025)File: FORM-2A-Oak-2024-2025-31-03-2025.pdf9 Sep 2025
Form 5 (FY 2022-2023)File: Form 5 - Oak Tower for 2022-2023.pdf9 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 - Oak Tower for 2023-2024.pdf9 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 - Oak Tower for 2024-2025-31-03-2025.pdf9 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Arch Cert Oak Q3 24-25).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA Cert - Oak - Q3 - 24-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Eng Cert - OAK - Q3 - 24-25.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory list - Oak - Q3 - 2024-2025.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Arch Cert Oak Q1 24-25).pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Arch Cert Oak Q2 24-25).pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Arch Cert Oak Q1 24-25).pdf21 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
WOODS PLATINA Wing B- Ebony TowerP51800009546Jogeshwari West, Mumbai SuburbanAug 2017CompletedJul 2024Registered original: Jul 2022Jan 2024

How this compares with Mumbai Suburban

34%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Woods Platina Wing D - Oak Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari West6,700+ in Mumbai Suburban

2 kmWoods Platina Wing D - OCompleted 108Lapsed / revoked 44Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 212 registered projects within 2 km.

Builder: Sukoon Developers Pvt Ltd

Sukoon Developers Pvt Ltd has 3 registrations on MahaRERA, including WOODS PLATINA Wing B- Ebony Tower and Woods Platina Wing C - Walnut Tower. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Woods Platina Wing D - Oak Tower is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Woods Platina Wing D - Oak Tower?

The registered promoter entity is Sukoon Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Woods Platina Wing D - Oak Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Woods Platina Wing D - Oak Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Woods Platina Wing D - Oak Tower?

The professionals named in the filing: Architect: Reza Kabul; Architect: Umesh Bhatt Architects; Engineer: Dwijen Bhatt; Engineer: Abdul Lateef Qureshi; Chartered Accountant: MIM BORA; Chartered Accountant: K M THAKER & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Woods Platina Wing D - Oak Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Woods Platina Wing D - Oak Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Woods Platina Wing D - Oak Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.