ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / WOODS PLATINA Wing B- Ebony Tower

Completed No litigation declared Residential / Group Housing project

WOODS PLATINA Wing B- Ebony Tower

By Sukoon Developers Pvt Ltd

RG-MH-38092 · RERA P51800009546 · Last updated on MahaRERA portal: 13 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

WOODS PLATINA Wing B- Ebony Tower is a Residential / Group Housing project by Sukoon Developers Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009546 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2024. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameWOODS PLATINA Wing B- Ebony Tower
  • TypeResidential / Group Housing
  • Location
    • Capt Samant Road
    • Jogeshwari West
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009546
  • ReraGenie IDRG-MH-38092

Builder

  • NameSukoon Developers Pvt Ltd
  • Entity typeCompany
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJul 2022Revised toJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion31 Jul 2024
  • Revised completionRevised to 31 Jul 2024 (originally 31 Jul 2022)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing B-Ebony TowerNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Wing B-Ebony Tower: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 13 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Stack Parkings Multilevel Mechanical Parking System InstallationsYes75%
Note AFS means Agreement for saleYes0%
Landscaped terrace recreation areaYes0%
Car Lift Installation 2 nosYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area480 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6516.0
Proposed, not sanctioned6,516 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAyesha Tower SV Road

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Bhatt Architects
ArchitectReza Kabul
EngineerDwijen Bhatt
PartnerRole in project
Sukoon Developers Pvt Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012351Jul 2022 → Jul 2023

Reason as filed by the promoterThe project u/r has got delayed due to multiple effects of COVID19 Pandemic like unavailability of material because of closing down of many industries and shortage of labours, etc. Therefore, we request this Hon'ble Authority to give an extension of 12 Months.

EXT51800017351Jul 2022 → Jul 2024

Reason as filed by the promoterThe Project interalia comprises of 21 floors and the Construction work of the same is completed and Occupation Certificate till 20th floor is already issued by MCGM on 19/11/2022 and the progress for obtaining Occupation Certificate of 21st floor is under process

Litigation declared2

CaseCourtStatus
1539/2017CITY CIVIL COURT DINDOSHIFOR DIRECTIONS
5471/2006CITY CIVIL COURT DINDOSHIFOR RECORDING OF EVIDENCE

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2024

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate for Ebony uploaded.pdf13 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate for Ebony uploaded.pdf21 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate for Ebony uploaded.pdf4 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate for Ebony.pdf26 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate for OC - for Ebony Tower.pdf23 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate for OC - for Ebony Tower.pdf9 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC CERTIFICATES Ebony Tower.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch Cert - Ebony Q2 - 23-24.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg Cert - Ebony Q2 - 23-24.pdf28 Oct 2023
Certificates of CA (Form 3)File: Form 3 - CA Cert - Ebony Q2 - 23-24.pdf28 Oct 2023
Declaration in FORM BFile: Form B for 2nd Ext Appln.pdf24 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cert Ebony Q4 22-23.pdf24 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch Cert - Ebony Q1 - 23-24.pdf24 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg Cert - Ebony Q4 - 22-23.pdf24 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engg Cert - Ebony Q1 - 23-24.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Engg Cert - Ebony 2022-2023.pdf24 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure-Sold-Unsold Inventory as on 15-8-23.pdf24 Aug 2023
Certificates of CA (Form 3)File: Form 3 - CA Cert - Ebony Q4 - 22-23.pdf24 Aug 2023
Certificates of CA (Form 3)File: Form 3 - CA Cert - Ebony Q1 - 23-24.pdf24 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Arch Cert - Ebony 2021-2022.pdf24 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Arch Cert - Ebony 2022-2023.pdf24 Aug 2023
Proforma of Agreement for saleFile: Ebony Draft Agreement.pdf24 Aug 2023
Declaration about Commencement CertificateFile: Declaration for CC Ebony.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A FY 2019-20.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 2020-21.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: Discolure of Sold Booked Inventory 14-08-2021.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 SDPL 2018-2019.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 SDPL 2019-2020.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 SDPL 2020-2021.pdf15 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Ebony CC 2019.pdf12 Sep 2020
Certificates of CA (Form 5)File: FORM 5 .pdf9 Oct 2019
Certificates of CA (Form 5)File: 05-01-2019.pdf18 Jan 2019
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE- Woods Platina-Wing B-Ebony Tower.pdf15 Jan 2019
Building plan approvalFile: 310318.pdf18 Sep 2018
Building Plan Approval (IOD)File: 310318.pdf18 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: 110518.pdf18 Sep 2018
Building plan approvalFile: IOD.pdf31 Jul 2017
Layout approvalFile: LAYOUT_PLAN_.pdf31 Jul 2017
PAN CardFile: SDPL PAN.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate 31E-2- A.pdf31 Jul 2017
Details of encumbrancesFile: FORM B-SDPL-EBONY.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT_PLAN_.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC EBONY.pdf31 Jul 2017
Declaration in FORM BFile: FORM B-SDPL-EBONY.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert ebony.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - EBONY.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA certificate Ebony.pdf31 Jul 2017
Proforma of Allotment letterFile: Draft Allotment letter ebony.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WOODS PLATINA Wing B- Ebony Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jogeshwari West6,700+ in Mumbai Suburban

2 kmWOODS PLATINA Wing B- EbCompleted 108Lapsed / revoked 69Abeyance 1Other 146Dot size: filed unitsN

Filed coordinates, straight-line distance. 324 registered projects within 2 km.

Builder: Sukoon Developers Pvt Ltd

Sukoon Developers Pvt Ltd has 3 registrations on MahaRERA, including WOODS PLATINA Wing B- Ebony Tower and Woods Platina Wing C - Walnut Tower. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if WOODS PLATINA Wing B- Ebony Tower is delayed beyond 31 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WOODS PLATINA Wing B- Ebony Tower?

The registered promoter entity is Sukoon Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WOODS PLATINA Wing B- Ebony Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WOODS PLATINA Wing B- Ebony Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WOODS PLATINA Wing B- Ebony Tower?

The professionals named in the filing: Architect: Umesh Bhatt Architects; Architect: Reza Kabul; Engineer: Dwijen Bhatt. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WOODS PLATINA Wing B- Ebony Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WOODS PLATINA Wing B- Ebony Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WOODS PLATINA Wing B- Ebony Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.