Home / Browse projects / Mumbai Suburban, Maharashtra / The Westpark Phase-1

Registered Litigation declared Residential / Group Housing project

The Westpark Phase-1

By WESTPARK DEVELOPERS PRIVATE LIMITED

RG-MH-32128 · RERA PR1181012500079 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 27 cases
  • Rs 1,350.00 crore secured on the land, in favour of Kotak Mahindra Investments Limited, TATA Capital Housing Finance Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2032Possession promisedno revision filed
8 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 60%
7 of 416Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

The Westpark Phase-1 is a Residential / Group Housing project by WESTPARK DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1181012500079 on 16 Jun 2025. Possession is promised by 30 Jun 2032. 409 of the 416 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.

At a glance

Project

  • NameThe Westpark Phase-1
  • TypeResidential / Group Housing
  • Location
    • New Shakti Nagar Road
    • Oshiwara-Jogeshwari West
    • Oshiwara
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1181012500079
  • ReraGenie IDRG-MH-32128

Builder

  • NameWESTPARK DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200HR2006PTC100894
  • DirectorVilas Shivputra Nidsoshi

Key dates

this monthRegisteredJun 2025PromisedJun 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion30 Jun 2032
  • Revised completionNone
  • Buildings4 building records
  • Documents filed49 files

Current status

98%409 of 416 units booked
12.1%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 2NA443767067
Tower 3NA44371390139
Tower 4NA44371030103
Tower 5NA44371070107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 60%.

Tower 214%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 315%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 427%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 527%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed844

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots844
Basement844
BuildingBasementTotal
Tower 2140140
Tower 3281281
Tower 4212212
Tower 5211211

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area40,609 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofKotak Mahindra Investments Limited, TATA Capital Housing Finance Limited
Secured amountRs 1,350.00 crore
CERSAI search filedYes
Declared on25 May 2026
LandownerVillageDistrict
Sahyog Homes LimitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI57510.37
Proposed, not sanctioned57,510 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 723.91 cr
Cost incurredRs 87.86 cr
Work done12.14%
BuildingWingEstimatedIncurred
Tower 2NARs 164.04 crRs 21.97 cr
Tower 3NARs 164.04 crRs 21.97 cr
Tower 4NARs 164.04 crRs 21.97 cr
Tower 5NARs 164.04 crRs 21.97 cr
-NARs 67.74 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Madhav Shikre
ArchitectEllora Project Consultants Pvt Ltd
ArchitectAR. SAGAR GOGRI
EngineerShekhar Chakravarti Ghate
EngineerMohan A Khot
EngineerBhushan Nalawade
Chartered AccountantA K P J & ASSOCIATES
PartnerRole in project
WESTPARK DEVELOPERS PRIVATE LIMITED-

Litigation declared27

CaseCourtStatus
S/965/2014/2014High Court (Original)Closed
WP/6437/2015/2015High Court (Appellate Side)Closed
293/2024/2024High CourtT (Original)Ongoing
WP/899/2020/2020High CourtT (Original)Ongoing
1151/2015/2015City Civil Court DindoshiOngoing
2619/8026/Prakaran 11/2019Revenue & Textile Minister, Government of MaharashtraOngoing
Revision No. 2619/8027/Prakaran 12/2019Revenue & Textile Minister, Government of MaharashtraOngoing
Revision No. 2619/8028/Prakaran 13/2019Revenue & Textile Minister, Government of MaharashtraOngoing
Long Cause Suit No. 3104/2014/2014City Civil Court DindoshiOngoing
S.C.Suit No.2882/2015/2015City Civil Court DindoshiOngoing
S C Suit No 1842/2022 NM/3770/2022 by Plaintiff/2022City Civil Court DindoshiOngoing
L. C. Suit No. 2283/2022/2022City Civil Court DindoshiOngoing
Appeal No. 8/2021/2021Grievance Redressal CommitteeClosed
Appeal No. 32/2023/2023Additional Collector (E&R)Closed
Appeal No. 01/2025/2025Grievance Redressal CommitteeClosed
IAST/40767/2025/2025HIGH COURT (Appellate Side)Ongoing
Counter_Claim (L) No.39555/2025/2025HIGH COURT (Original)Ongoing
CARBP/146/2026/2026HIGH COURT (Original)Ongoing
Arbitration CARAPL/5494/2026/2026HIGH COURT (Original)Ongoing
WP(ST)/25651/2025/2025HIGH COURT (Original)Ongoing
Appeal No. 1029/2024/2024Additional Collector (E&R)Ongoing
Appeal No. 872/2025/2025Additional Collector (E&R)Ongoing
Appeal No. 1510/2025/2025Additional Collector (E&R)Ongoing
Appeal No. 2329/2025/2025Additional Collector (E&R)Ongoing
Appeal No. 241/2026/2026Additional Collector (E&R)Ongoing
Appeal No. 126/2026/2026Additional Collector (E&R)Ongoing
2025High Court (Original)Closed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2032

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: The West Park Form 2A FY 25-26.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1- Signed.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2- Signed.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3_.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 - The West Park Phase 1 as on Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 - The West Park Phase 1 as on Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 - The West Park Phase 1 as on Dec 2025 (signed).pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1 - The Westpark Phase 1 as on Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 - The Westpark Phase 1 as on Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 - The Westpark Phase - 1 as on Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 1File: The Westpark Phase 1 - Form 1 - 30-06-2025.pdf19 Jul 2025
Withdrawal Update Form 1File: The Westpark Phase 1 - Form 1 - 30-06-2025.pdf19 Jul 2025
Withdrawal Update Form 2File: The Westpark Phase 1 - Form 2 - 30-06-2025.pdf19 Jul 2025
Withdrawal Update Form 2File: The Westpark Phase 1 - Form 2 - 30-06-2025.pdf19 Jul 2025
Withdrawal Update Form 3File: CA Certificate Revised.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 - The Westpark Phase-1 as on June 2025.pdf19 Jul 2025
Building plan approvalFile: Layout Plans - Highlighted.pdf5 Jun 2025
Layout approvalFile: Layout Approval-.pdf28 May 2025
Building plan approvalFile: 01-.pdf28 May 2025
Building plan approvalFile: 03.pdf28 May 2025
Building plan approvalFile: 04.pdf28 May 2025
Building plan approvalFile: 05.pdf28 May 2025
Building plan approvalFile: 06.pdf28 May 2025
Building plan approvalFile: 07.pdf28 May 2025
Building plan approvalFile: 08.pdf28 May 2025
Building plan approvalFile: 09-T2.pdf28 May 2025
Building plan approvalFile: 10- T2.pdf28 May 2025
Building plan approvalFile: 11- T2.pdf28 May 2025
Building plan approvalFile: 12- T2.pdf28 May 2025
Building plan approvalFile: 13- T2.pdf28 May 2025
Building plan approvalFile: 14- T3.pdf28 May 2025
Building plan approvalFile: 15- T3.pdf28 May 2025
Building plan approvalFile: 16- T3.pdf28 May 2025
Building plan approvalFile: 17- T3.pdf28 May 2025
Building plan approvalFile: 18- T3.pdf28 May 2025
Building plan approvalFile: 19- T3.pdf28 May 2025
Building plan approvalFile: 20- T4.pdf28 May 2025
Building plan approvalFile: 21- T4.pdf28 May 2025
Building plan approvalFile: 22- T4.pdf28 May 2025
Building plan approvalFile: 23- T4.pdf28 May 2025
Building plan approvalFile: 24- T4.pdf28 May 2025
Building plan approvalFile: 25- T4.pdf28 May 2025
Building plan approvalFile: 26- T5.pdf28 May 2025
Building plan approvalFile: 27- T5.pdf28 May 2025
Building plan approvalFile: 28- T5.pdf28 May 2025
Building plan approvalFile: 29- T5.pdf28 May 2025
Building plan approvalFile: 30- T5.pdf28 May 2025
Building plan approvalFile: 31- T5.pdf28 May 2025
Declaration and undertaking (Annexure A)File: Annexure A- Order No-50.pdf28 May 2025

How this compares with Mumbai Suburban

98%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Westpark Phase-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Oshiwara-Jogeshwari West6,700+ in Mumbai Suburban

2 kmThe Westpark Phase-1Completed 83Lapsed / revoked 47Abeyance 1Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 255 registered projects within 2 km.

Builder: WESTPARK DEVELOPERS PRIVATE LIMITED

WESTPARK DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including The Westpark Phase-1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if The Westpark Phase-1 is delayed beyond 30 Jun 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Westpark Phase-1?

The registered promoter entity is WESTPARK DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45200HR2006PTC100894 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Westpark Phase-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Westpark Phase-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Westpark Phase-1?

The professionals named in the filing: Architect: Sandeep Madhav Shikre; Architect: Ellora Project Consultants Pvt Ltd; Architect: AR. SAGAR GOGRI; Engineer: Shekhar Chakravarti Ghate; Engineer: Mohan A Khot; Engineer: Bhushan Nalawade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Westpark Phase-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Westpark Phase-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Westpark Phase-1 to a free account