Home / Browse projects / Raigarh, Maharashtra / Windsor Solitaire

Registered No litigation declared Residential / Group Housing project

Windsor Solitaire

By Silverkey Ventures LLP

RG-MH-06496 · RERA P52000052887 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
17 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Windsor Solitaire is a Residential / Group Housing project by Silverkey Ventures LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000052887 on 5 Oct 2023. Possession is promised by 31 Dec 2027. 31 of the 48 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameWindsor Solitaire
  • TypeResidential / Group Housing
  • Location
    • Sector 27
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052887
  • ReraGenie IDRG-MH-06496

Builder

  • NameSilverkey Ventures LLP
  • Entity typePartnership
  • PartnersZubin Bhupendra Sanghoi, Biren Bipinchandra Shah, Ankul Bhupendra Sanghoi, Bhavesh Vasanji Shethia, Shobhana Bhavesh Shethia, Ajay Vinod Shah

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

65%31 of 48 units booked
65.3%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Windsor SolitaireNA181648048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Windsor Solitaire: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)75%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered61
Open Space14

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area999 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI4793.08
Proposed, not sanctioned4,793 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch77, Prabha, Ratilal Mehta Marg, Ghatkopar East, Mumbai - 400077
Estimated costRs 14.24 cr
Cost incurredRs 9.30 cr
Work done65.3%
BuildingWingEstimatedIncurred
Windsor SolitaireNARs 13.53 crRs 9.30 cr
-NARs 71.20 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStapl Architects
EngineerSK Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
Chartered AccountantPratiksha Tulshyan & Associates
PartnerRole in project
Silverkey Ventures LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -1 Architect Certificate 2026-06-30.pdf10 Jul 2026
Withdrawal Update Form 2File: Form 2 - Windsor Solitaire as on June 2026.pdf10 Jul 2026
Withdrawal Update Form 3File: Form 3 - Windsor Solitaire as on June 2026.pdf10 Jul 2026
Withdrawal Update Form 1File: Form -1 Architect Certificate 2026-06-30.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 - Windsor Solitaire as on June 2026.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 - Windsor Solitaire as on June 2026.pdf8 Jul 2026
Layout approvalFile: Amended CC Drawing.pdf10 Apr 2026
Building plan approvalFile: Amended CC Drawing.pdf10 Apr 2026
Withdrawal Update Form 1File: Form 1 - Windsor Solitaire as on March 2026.pdf10 Apr 2026
Withdrawal Update Form 1File: Form 1 - Windsor Solitaire as on March 2026.pdf10 Apr 2026
Withdrawal Update Form 2File: Form 2 - Windsor Solitaire as on March 2026.pdf10 Apr 2026
Withdrawal Update Form 2File: Form 2 - Windsor Solitaire as on March 2026.pdf10 Apr 2026
Withdrawal Update Form 3File: Form 3 - Windsor Solitaire as on March 2026.pdf10 Apr 2026
Withdrawal Update Form 3File: Form 3 - Windsor Solitaire as on March 2026.pdf10 Apr 2026
Withdrawal Update Form 1File: Form 1 - Windsor Solitaire as on Dec 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 - Windsor Solitaire as on Dec 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 - Windsor Solitaire as on Dec 2025.pdf19 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Windsor Solitaire-Ms Silverkey Ventures LLP FY 2023-24.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - Windsor Solitaire as on FY 2024-25.pdf24 Dec 2025
Withdrawal Update Form 1File: Form 1 - Windsor Solitaire as on Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: Form 2 - Windsor Solitaire as on Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: Form 3 - Windsor Solitaire as on Sep 2025.pdf10 Oct 2025
Layout approvalFile: Amended CC Drawing.pdf25 Sep 2025
Building plan approvalFile: Amended CC Drawing.pdf25 Sep 2025
Form 1File: Form 1 - Windsor Solitaire as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Windsor Solitaire as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Windsor Solitaire as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Windsor Solitaire as on 30-06-2025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Windsor Solitaire as on March 2025.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on March 2025.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Windsor Solitaire as on March 2025.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Windsor Solitaire as on 31-12-2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on Dec 2024.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf14 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Windsor Solitaire Sep 24.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on Sept 2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Windsor Solitaire as on Sept 2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Windsor Solitaire Sep 24.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Windsor Solitaire as on Sept 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on Sept 2024.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Windsor Solitaire-Ms Silverkey Ventures LLP FY 2023-24.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Windsor Solitaire-Ms Silverkey Ventures LLP FY 2023-24.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Windsor Solitaire Sep 24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Windsor Solitaire Sep 24.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on June 2024.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Windsor Solitaire as on 30-06-2024.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Windsor Solitaire as on June 2024.pdf4 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declaration silverkey.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Windsor Solitaire March 2024.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on March 2024.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Windsor Solitaire as on 31-03-2024.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Windsor Solitaire as on March 2024.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Windsor Solitaire as on Dec 2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Windsor Solitaire as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Windsor Solitaire as on Dec 2023.pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification mail - Windsor Solitaire.pdf8 Sep 2023
Other - TechnicalFile: CC Verification mail - Windsor Solitaire.pdf8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form-3.pdf1 Sep 2023
Proforma of Agreement for saleFile: Final AFS_Silver sky_Windsor solitaire_31082023.pdf1 Sep 2023
Proforma of Allotment letterFile: Final Allotment letter as per RERA _ Silverkey Ventures LLP.pdf1 Sep 2023
Deviation Report with respect to Allotment letterFile: Final Deviation Allotment_31082023.pdf1 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Final Deviation report AFS_Silver sky_Windsor solitaire_31082023.pdf1 Sep 2023
Copy of the legal title reportFile: Windsor Solitaire_Short Title_28082023_11zon.pdf31 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf31 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf31 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf31 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf31 Aug 2023
Declaration about Commencement CertificateFile: Format D.pdf31 Aug 2023
Declaration in FORM BFile: Form B - Promoter.pdf31 Aug 2023
CERSAI detailsFile: Cersai Declaration.pdf31 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf31 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf31 Aug 2023
Layout approvalFile: Layout pg 1.pdf16 Aug 2023
Building plan approvalFile: Layout pg 1.pdf16 Aug 2023
Building plan approvalFile: Layout pg 2-6.pdf16 Aug 2023
PAN CardFile: PAN - Firm.pdf16 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout pg 1.pdf16 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout pg 1.pdf16 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout pg 2-6.pdf16 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Approved CC.pdf16 Aug 2023

How this compares with Raigarh

65%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Windsor Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar5,900+ in Raigarh

2 kmWindsor SolitaireCompleted 36Lapsed / revoked 13Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: Silverkey Ventures LLP

Silverkey Ventures LLP has 1 registration on MahaRERA, including Windsor Solitaire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Windsor Solitaire is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Windsor Solitaire?

The registered promoter entity is Silverkey Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Windsor Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Windsor Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Windsor Solitaire?

The professionals named in the filing: Architect: Stapl Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Windsor Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Windsor Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Windsor Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.