Home / Browse projects / Thane, Maharashtra / WINDERMERE BUILDING NO 1 TO 6

Registered No litigation declared Residential / Group Housing project

WINDERMERE BUILDING NO 1 TO 6

By A G SUPERSTRUCTURES PVT LTD

RG-MH-76290 · RERA P51700049440 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 245.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED, ICICI Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
30 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 95%
8 of 154Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

WINDERMERE BUILDING NO 1 TO 6 is a Residential / Group Housing project by A G SUPERSTRUCTURES PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700049440 on 14 Feb 2023. Possession is promised by 31 Dec 2027. 146 of the 154 units on this registration are recorded sold or booked, and 30 of 66 construction stages are filed complete.

At a glance

Project

  • NameWINDERMERE BUILDING NO 1 TO 6
  • TypeResidential / Group Housing
  • Location
    • NEAR PLATINA COMPLEX
    • BHAYANDER WEST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401101
  • Pincode401101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049440
  • ReraGenie IDRG-MH-76290

Builder

  • NameA G SUPERSTRUCTURES PVT LTD
  • Entity typeCompany
  • CINU70102MH2010PTC209759
  • GSTIN27AAJCA0663P1Z9
  • Managing DirectorASHISH GIRDHARILAL VAID
  • DirectorSUNIL NARAINDAS LALWANI
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings6 building records
  • Documents filed116 files

Current status

95%146 of 154 units booked
86.2%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WINDERMERE BUILDING NO 1NA8728028
WINDERMERE BUILDING NO 2NA8728028
WINDERMERE BUILDING NO 3NA8728028
WINDERMERE BUILDING NO 4NA8728028
WINDERMERE BUILDING NO 5NA8714014
WINDERMERE BUILDING NO 6NA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 95%.

WINDERMERE BUILDING NO 180%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WINDERMERE BUILDING NO 280%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WINDERMERE BUILDING NO 370%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WINDERMERE BUILDING NO 468%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WINDERMERE BUILDING NO 565%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WINDERMERE BUILDING NO 665%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed154

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots154
Closed/Covered124
Open Space30
BuildingClosed/CoveredOpen SpaceTotal
WINDERMERE BUILDING NO 120828
WINDERMERE BUILDING NO 220828
WINDERMERE BUILDING NO 320828
WINDERMERE BUILDING NO 424428
WINDERMERE BUILDING NO 514014
WINDERMERE BUILDING NO 626228

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,042 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED, ICICI Bank Limited
Secured amountRs 245.00 crore
CERSAI search filedYes
Declared on15 Sep 2025
LandownerVillageDistrict
SPAN DEVELOPERSMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMBMC
Permissible FSI8848.1
Proposed, not sanctioned8,848 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN BHAVAN, NARIMAN POINT, MUMBAI-400021
Estimated costRs 45.13 cr
Cost incurredRs 38.90 cr
Work done86.21%
BuildingWingEstimatedIncurred
WINDERMERE BUILDING NO 1NARs 7.52 crRs 6.48 cr
WINDERMERE BUILDING NO 2NARs 7.52 crRs 6.48 cr
WINDERMERE BUILDING NO 3NARs 7.52 crRs 6.48 cr
WINDERMERE BUILDING NO 4NARs 7.52 crRs 6.48 cr
WINDERMERE BUILDING NO 5NARs 7.52 crRs 6.48 cr
WINDERMERE BUILDING NO 6NARs 7.52 crRs 6.48 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONNECT FOUR DESIGN STUDIO LLP
EngineerSACHIN SHIRKE
Chartered AccountantMANOJ PAL & ASSOCIATES
Chartered AccountantSBP & ASSOCIATES
Chartered AccountantARCHANA RIKESH PARIKH
PartnerRole in project
A G SUPERSTRUCTURES PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_Windermere_Bldg_1-6.pdf25 Jun 2026
Withdrawal Update Form 1File: WM Arch Cert_Bldg 1-6.pdf20 Apr 2026
Withdrawal Update Form 2File: Eng Cert_Bldg 1-6.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate_Building 1-6.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect Certificate_Bldg 1 to 6.pdf14 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate_Bldg 1-6.pdf14 Jan 2026
Withdrawal Update Form 3File: CA Certificate - Bldg 1 to 6.pdf14 Jan 2026
Withdrawal Update Form 1File: Architect Certificate.pdf20 Oct 2025
Withdrawal Update Form 1File: Architect Certificate - Buildings 1 to 6.pdf20 Oct 2025
Withdrawal Update Form 2File: Eng Cert_ Building 1-6.pdf20 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate - Buildings 1 to 6.pdf20 Oct 2025
Withdrawal Update Form 3File: C A Certificate Building 1-6.pdf20 Oct 2025
Withdrawal Update Form 3File: CA Certificate - Buildings 1 to 6.pdf20 Oct 2025
Withdrawal Update Form 1File: Architect Certificate.pdf16 Oct 2025
Withdrawal Update Form 2File: Eng Cert_ Building 1-6.pdf16 Oct 2025
Withdrawal Update Form 3File: C A Certificate Building 1-6.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Bldg 1 to 6 Form 5 FY 2024-25 V1.pdf3 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 March 2024.pdf25 Sep 2025
Form 1File: Architect Cert_Bldg 1_6.pdf19 Jul 2025
Form 2File: Eng Cert_Building 1_6.pdf19 Jul 2025
Form 3File: CA cert_Bldg1-6.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SoldUnsold_Bldg1-6.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bldg 1 to 6_CA_Certificate_V1.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - windermere.pdf6 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrance_Bldg 1-6.pdf23 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance_Bldg 1-6.pdf23 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance_Bldg 1-6.pdf23 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance_Bldg 1-6.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_Building1-6.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert_Bldg.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Building 1 to 6.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Bldg.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg 1 to 6 Architect Certificate_Dec'24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bldg 1 to 6 Engineer Certificate_Dec'24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Building 1_6.pdf20 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: CA cert_Building1_6.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Sep 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert_Building 1-6.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Cert_Form 2A_Bldg 1-6.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 March 2024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_Building 1-6.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ Building 1-6.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Building 1-6_Sold Unsold.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Building 1-6.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_Building 1_6.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold_Building 1_6.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_AGS.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Building 1_6.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Building 1_6.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Building 1_6.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Building 1_6.pdf9 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Letter_Dec 2023.pdf14 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Agreement for sale_Part1.pdf14 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Agreement for sale_part2.pdf14 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale_part3.pdf14 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale_Part4.pdf14 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bldg 1_6 CA Cert.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg 1_6 Arch Cert.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bldg_1-6 Eng Cert.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Bldg 1_6 Inventory.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert.pdf26 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf26 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert.pdf26 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers form 2A 22-23.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 Bldg 1-6 31-03-23.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Bldg 1-6 30.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf26 Sep 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Cert.pdf4 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encunbrance Certificate.pdf4 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Cert.pdf4 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encunbrance Certificate.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Cert.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: No Encunbrance Certificate.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Cert.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: No Encunbrance Certificate.pdf4 Jul 2023
CERSAI detailsFile: CERSAI.pdf4 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SAMRIDDHIINDRALOK LAYOUT BHAYANDER EAST 401105628CompletedDec 2017Late, Jun 2021

How this compares with Thane

95%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WINDERMERE BUILDING NO 1 TO 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDER WEST7,600+ in Thane

2 kmWINDERMERE BUILDING NO 1Completed 25Lapsed / revoked 16Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: A G SUPERSTRUCTURES PVT LTD

A G SUPERSTRUCTURES PVT LTD has 3 registrations on MahaRERA, including SAMRIDDHI and WINDERMERE BUILDING NO 1 TO 6. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if WINDERMERE BUILDING NO 1 TO 6 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WINDERMERE BUILDING NO 1 TO 6?

The registered promoter entity is A G SUPERSTRUCTURES PVT LTD, a company as per the filing. Its CIN U70102MH2010PTC209759 and GSTIN 27AAJCA0663P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WINDERMERE BUILDING NO 1 TO 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WINDERMERE BUILDING NO 1 TO 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WINDERMERE BUILDING NO 1 TO 6?

The professionals named in the filing: Architect: CONNECT FOUR DESIGN STUDIO LLP; Engineer: SACHIN SHIRKE; Chartered Accountant: MANOJ PAL & ASSOCIATES; Chartered Accountant: SBP & ASSOCIATES; Chartered Accountant: ARCHANA RIKESH PARIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WINDERMERE BUILDING NO 1 TO 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WINDERMERE BUILDING NO 1 TO 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WINDERMERE BUILDING NO 1 TO 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.