Home / Browse projects / Satara, Maharashtra / WIND FLOWER
WIND FLOWER
RG-MH-25704 · RERA P52700013169 · Last updated on MahaRERA portal: 2 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 81 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WIND FLOWER is a Plotted project by VIVID BUILDCOM in Satara, Maharashtra, registered with MahaRERA as P52700013169 on 15 Sep 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 81 months from the original filing. 7 of the 77 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.
At a glance
Project
- NameWIND FLOWER
- TypePlotted
- Location
- Kawathe
- Wai
- Satara
- 415516
- Pincode415516
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700013169
- ReraGenie IDRG-MH-25704
Builder
- NameVIVID BUILDCOM
- Entity typePartnership
- PartnersDEEPAK POPATLAL OSWAL, VIPUL MANGILAL JAIN
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Sep 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Mar 2022)
- BuildingsNot stated in filing
- Documents filed75 files
Current status
Figures as on 2 Jun 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 20% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 20% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUNIL D BHAMARE |
| Engineer | SHIRAM KULKARNI |
| Engineer | RAKESH NIBJIYA |
| Chartered Accountant | CA AMIT SHINGVI |
| Chartered Accountant | CA RAKESH N OSWAL |
| Partner | Role in project |
|---|---|
| VIVID BUILDCOM | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere was ligitation in Title which caused delay in project execution, but now the said litigation has been resolved and we are expect to complete the project as early as possible.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022675 | Amod Rairikar | Vivid Buildcon | 15/02/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form-5-FY 24-25.pdf | 2 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 WIND FLOWER Q4 compressed.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Form -2 Vivid buildcom.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 sign_compressed.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 15 Dec 2025 |
| Withdrawal Update Form 1File: Form-1.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: Form -2 Vivid buildcom.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: Form -2 Vivid buildcom.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 sign_compressed.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 sign_compressed.pdf | 15 Dec 2025 |
| Certificates of CA (Form 3)File: Form 3 sign_compressed.pdf | 5 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate 31 Mar 2025.pdf | 30 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 23-24.pdf | 30 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5.pdf | 30 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 Sign.pdf | 28 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM -1.pdf | 18 Jan 2025 |
| Layout approvalFile: KAVATHE, VAI MAP_compressed.pdf | 19 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: KAVATHE, VAI MAP_compressed.pdf | 19 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 19 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser Of Sold.pdf | 18 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - RERA Vivid Buildcom_compressed.pdf | 18 Jan 2024 |
| Declaration in FORM BFile: Notary New.pdf | 8 Jan 2024 |
| Building plan approval or NA orderFile: 1-1.pdf | 4 Nov 2023 |
| Layout approvalFile: 1-2.pdf | 4 Nov 2023 |
| Layout approvalFile: 1-3.pdf | 4 Nov 2023 |
| Layout approvalFile: 1-4.pdf | 4 Nov 2023 |
| Layout approvalFile: 1-5.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance Certificate.pdf | 4 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 1-2.pdf | 4 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 1-3.pdf | 4 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 1-4.pdf | 4 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 1-5.pdf | 4 Nov 2023 |
| Building Plan Approval (IOD)File: 1-1.pdf | 4 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 4 Nov 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 4 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf | 4 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf | 4 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf | 4 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf | 4 Nov 2023 |
| CERSAI detailsFile: Cersai Report.pdf | 4 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture A Deepak P Oswal.pdf | 4 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture A Vipul M Jain.pdf | 4 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Deepak Oswal.pdf | 4 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vijay Nibjiya.pdf | 4 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vipul Jain.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Statutory Audit FY 2017-18.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Statutory Audit FY 2018-19.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Statutory Audit FY 2019-20.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Statutory Audit FY 2020-21.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Statutory Audit FY 2021-22.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Statutory Audit FY 2022-23.pdf | 4 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 4 Nov 2023 |
| Building plan approval or NA orderFile: Plan 1-ilovepdf-compressed.pdf | 31 Aug 2017 |
| Layout approvalFile: Plan 2-ilovepdf-compressed.pdf | 31 Aug 2017 |
| Layout approvalFile: Plan 5 ilovepdf.pdf | 31 Aug 2017 |
| Layout approvalFile: Plan 3-ilovepdf-compressed.pdf | 31 Aug 2017 |
| Layout approvalFile: Plan 4.pdf | 31 Aug 2017 |
| PAN CardFile: Firm Pan card.pdf | 31 Aug 2017 |
| Copy of the legal title reportFile: Agreement31082017.pdf | 31 Aug 2017 |
| Details of encumbrancesFile: Non Encumbrance Letter31082017.pdf | 31 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Plan 2-ilovepdf-compressed.pdf | 31 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Plan 5 ilovepdf.pdf | 31 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Plan 3-ilovepdf-compressed.pdf | 31 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Plan 4.pdf | 31 Aug 2017 |
| Building Plan Approval (IOD)File: Plan 1-ilovepdf-compressed.pdf | 31 Aug 2017 |
| Declaration in FORM BFile: Declaration31082017.pdf | 31 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archtch Cert.pdf | 31 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert.pdf | 31 Aug 2017 |
| Certificates of CA (Form 3)File: C A Cert31082017.pdf | 31 Aug 2017 |
| Proforma of Allotment letterFile: Agreement31082017.pdf | 31 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WIND FLOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kawathe1,100+ in Satara
SWARAJ CITY PHASE I
THE SWARAJ REALTORS
WAI GREENS 1
Shivam Build Dream LLP
WAI GREENS 2
SHREEJI HABITAT LLP
PRADHAN MANTRI AWAS YOJANA SATARA PHASE I
SATARA MUNICIPAL COUNCIL SATARA
LANDMARK TOWERS
KANGRALKAR INFRASTRUCTURE
Dois Hill
Vinay Ashok Chugera
See every Satara project, with the district possession charts
Builder: VIVID BUILDCOM
VIVID BUILDCOM has 1 registration on MahaRERA, including WIND FLOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if WIND FLOWER is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WIND FLOWER?
The registered promoter entity is VIVID BUILDCOM, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WIND FLOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WIND FLOWER?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WIND FLOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WIND FLOWER?
The professionals named in the filing: Architect: SUNIL D BHAMARE; Engineer: SHIRAM KULKARNI; Engineer: RAKESH NIBJIYA; Chartered Accountant: CA AMIT SHINGVI; Chartered Accountant: CA RAKESH N OSWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WIND FLOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback