Home / Browse projects / Mumbai Suburban, Maharashtra / WESTWOOD
WESTWOOD
By DIMPLE REALTORS PRIVATE LIMITED
RG-MH-61507 · RERA P51800034338 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
- Rs 90.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED, Aditya Birla Housing Finance Ltd
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WESTWOOD is a Residential / Group Housing project by DIMPLE REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034338 on 4 Apr 2022. Possession is promised by 31 Dec 2027. 126 of the 305 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameWESTWOOD
- TypeResidential / Group Housing
- Location
- Off Link Road
- Kandivali West
- Borivali
- Mumbai Suburban
- 400067
- Pincode400067
- RERA no.P51800034338
- ReraGenie IDRG-MH-61507
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Apr 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed152 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Westwood Wing A B C D | NA | 24 | 23 | 293 | 12 | 305 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 35%.
Westwood Wing A B C D: 59% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 18% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 38% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | Yes | 5% |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed131
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| SAI AZAD CO-OPERATIVE HOUSING SOCIETY (PROPOSED) | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Westwood Wing A B C D | NA | Rs 70.00 cr | Rs 68.31 cr |
| - | NA | Rs 6.45 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Skytech Consultants |
| Engineer | JAYESH RAWAL |
| Chartered Accountant | MANISH PATEL |
| Chartered Accountant | Surana Jain and Co |
| Chartered Accountant | Chirag Surana |
| Chartered Accountant | MANISH PATEL COMPANY |
| Partner | Role in project |
|---|---|
| - | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500248 | DIMPLE REALTORS PRIVATE LIMITED | Jayesh Kishore Bhatia | 24/01/2025 |
| CC12500250 | DIMPLE REALTORS PRIVATE LIMITED | Jaymanav Singh | 24/01/2025 |
| CC12500251 | DIMPLE REALTORS PRIVATE LIMITED | Kalpana Balasaheb Sonawane | 24/01/2025 |
| CC12500252 | DIMPLE REALTORS PRIVATE LIMITED | Premal Mahendra Shah | 24/01/2025 |
| CC12500253 | DIMPLE REALTORS PRIVATE LIMITED | Siddhesh Ravindra Kodere | 24/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed152
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Westwood Form 1 Architect certificate Qtr March 26.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Westwood Form 2 Engineer Certificate Qtr Mar 26.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Westwood Form 3 CA certificate Qtr March 2026.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Westwood Form 1 Architect certificate Qtr Dec 25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Westwood Form 2A Engineer certificate for Quality Assurance Dec 25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Westwood Form 3 CA certificate Qtr Dec 25.pdf | 21 Jan 2026 |
| Form 2A (FY 2024-2025)File: Westwood Form 2A Engineer certificate for Quality Assurance Mar 25.pdf | 27 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5- Annual Report FY 24-25 Westwood.pdf | 27 Nov 2025 |
| Form 2A (FY 2023-2024)File: Westwood_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 11 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5- Annual Report FY 23-24 Westwood.pdf | 11 Nov 2025 |
| Form 5 (FY 2022-2023)File: Form 5- Annual Report FY 22-23 Westwood.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: Westwood Form 1 Architect certificate Qtr Sep 25.pdf | 10 Nov 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr Sept 25.pdf | 10 Nov 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr Sept 2025.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: Westwood Form 1 Architect certificate Qtr Sep 25.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Westwood Form 1 Architect certificate Qtr Sep 25.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr Sept 25.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr Sept 25.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr Sept 2025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr Sept 2025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Westwood_Form 1_Architect certificate Qtr June 25.pdf | 6 Oct 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr June 25.pdf | 6 Oct 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr June 2025.pdf | 6 Oct 2025 |
| Withdrawal Update Form 1File: Westwood_Form 1_Architect certificate Qtr June 25.pdf | 25 Sep 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr June 25.pdf | 25 Sep 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr June 2025.pdf | 25 Sep 2025 |
| Withdrawal Update Form 1File: Westwood_Form 1_Architect certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 1File: Westwood_Form 1_Architect certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr June 2025.pdf | 20 Sep 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr June 2025.pdf | 20 Sep 2025 |
| Withdrawal Update Form 1File: Westwood_Form 1_Architect certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 2File: Westwood_Form 2_Engineer Certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: Westwood_Form 3 Ca Certificate Qtr June 2025.pdf | 18 Sep 2025 |
| Form 1File: Westwood Form 1 Architect certificate Qtr Mar 25.pdf | 12 Aug 2025 |
| Form 2File: Westwood Form 2 Engineer Certificate Qtr Mar 25.pdf | 12 Aug 2025 |
| Form 3File: Westwood Form 3 Ca Certificate Qtr Mar 25.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory as of Mar 2025.pdf | 12 Aug 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 Pg1.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg2.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg3.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg4.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg5.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg6.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg7.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg8.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg9.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg10.pdf | 9 Jul 2025 |
| Building plan approvalFile: Westwood IOA 9 Aug 2024 pg11.pdf | 9 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood Form 3Qtr Mar 2025.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Westwood Form 2 Qtr Mar 25.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec24.pdf | 18 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 24.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Details.pdf | 17 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Sale 2 Re Endorsed Further CC.pdf | 19 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Sale Blg 2 Further CC for internal work brick work.pdf | 19 Feb 2025 |
| Proforma of Agreement for saleFile: Sale Agreement.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood Form 3.pdf | 30 Jan 2025 |
| Details of encumbrancesFile: Encumbrance certificate.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Westwood Form 1.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Westwood Form 2.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Westwood_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Westwood_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Annual Report FY 23-24 Westwood.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Westwood Form 1 Qtr Sep 24.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood Form 3 Qtr Sep 24.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Westwood Form 2 Qtr Sep 24.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood Form 3 CA Certificate.pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Westwood_Form 1Qtr June 24.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Westwood Form 2 Qtr June 24.pdf | 24 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood_Form 3.pdf | 8 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Westwood Form 1.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Westwood Form 2.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood Form 3.pdf | 7 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Annual Report FY 22-23 Westwood.pdf | 13 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Westwood Form 1.pdf | 12 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Westwood Form 2.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Westwood Form 3.pdf | 12 Feb 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Aspire | Village Kandivali Taluka Borivali MSD | 44 | Completed | Jun 2017 | Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 152 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WESTWOOD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kandivali West6,700+ in Mumbai Suburban
Ruparel Optima Ph I
Ruparel Infra & Realty Pvt Ltd
"SALE BLDG NO. 6 (A & B) WING KNOWN AS NORTHER
N.ROSE DEVELOPERS PVT LTD
JP Commerz
Metallica Industries Limited
Ruparel Skygreens I
Shree Siddhivinayak Infrastructure & Realt
ShreejiAikyam
Rushabh Developers
Shiv Vardaan
NAVKARMIK HOMES LLP, URVI CONSTRUCTION
See every Mumbai Suburban project, with the district possession charts
Builder: DIMPLE REALTORS PRIVATE LIMITED
DIMPLE REALTORS PRIVATE LIMITED has 5 registrations on MahaRERA, including 73 East and 19 North. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if WESTWOOD is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WESTWOOD?
The registered promoter entity is DIMPLE REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WESTWOOD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WESTWOOD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WESTWOOD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WESTWOOD?
The professionals named in the filing: Architect: Skytech Consultants; Engineer: JAYESH RAWAL; Chartered Accountant: MANISH PATEL; Chartered Accountant: Surana Jain and Co; Chartered Accountant: Chirag Surana; Chartered Accountant: MANISH PATEL COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WESTWOOD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback