Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 54 documents Report an error

WESTGATE GARDENS 'BLOCK A' is a Residential/Group Housing project by SMR GROUP in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/181003/002020 on 3 Oct 2018. Possession is promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameWESTGATE GARDENS 'BLOCK A'
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/181003/002020
  • ReraGenie IDRG-KA-52095

Builder

  • NameSMR GROUP
  • Entity typeOther
  • Authorized SignatoryS M RASHEED
  • OthersHASMUKH L PATEL, GOVIND L PATEL, KIRIT L PATEL
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2018First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on3 Oct 2018
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WESTGATE GARDENS BLOCK 'A'---1370137

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 9 Nov 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 9 Nov 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,646 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 34.53 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect2PKM ARCHITECTS
EngineerASHOK M G

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/201125/002020Dec 2018 → Dec 2019

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed54

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/181003/002020 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA certificate with Bank DetailsFile: Fund Utilized certificte with Bank Details.pdf9 Nov 2020
Bank StatementFile: Bank Statement.pdf9 Nov 2020
Reply to the noticeFile: 1-Reply to the notice dt 03-01-2020.pdf19 Oct 2020
Affidavit as per sec 18 of RERA ActFile: 2-Affidavit cum declaration.pdf19 Oct 2020
CA certificate with account detailsFile: 3-project extension letter CA.pdf19 Oct 2020
Initial building planFile: 4-Initial Building License.pdf19 Oct 2020
Revised licenseFile: 5-Revised Licience 19-07-2018.pdf19 Oct 2020
Occupancy CertificateFile: 6-Occupancy Certificate.pdf19 Oct 2020
Sold and unsold unit detailsFile: 7-sold and unsold unit.pdf19 Oct 2020
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE WORK COMPLETE TILL DATE.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER CERTIFICATE WORK COMPLETE TILL DATE.pdf-
CA Certificate for Funds UtilizationFile: CA CERTIFICATE FOR FUND UTILIZATION.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECTURE CERTIFICATE FOR PENDING WORK.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER CERTIFICATE FOR PENDING WORK.pdf-
CA Certificate for Funds required for Project CompletionFile: CA CERTIFICATE FOR FUNDS REQUIRED FOR COMPLETION.pdf-
AffidavitFile: Affidavit cum declaration.pdf-
Latest Encumbrance CertificateFile: EC UPTO DATE.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold and Unsold Details.xlsx-
Document 1File: COMPLETION CERTIFICATE.pdf-
Commencement-
Redused floor plan-
Floor Plan-
Proforma for Sale Deed-
Proforma Agreement to Sale-
Sale Deed and RTC-
Site Plan-
muda development approved-
Proforma Agreement to Sale-
Broucher of Current Project-
Specification-
Encumbrance Certificate-
Khatha-
Joint Development Agreement-
Building Plan New-
CONVERSION ORDER-
Specification-
CONVERSION ORDER-
Balance Sheet 2016 - 2017File: Balance Sheet - 2017.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet -2016.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet - 2015.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit and Loss Account - 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit & Loss Account - 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit & Loss Account - 2015.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow - 2017.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow - 2016.pdf-
Auditor's Report 2016 - 2017File: Audit Report - 2017.pdf-
Auditor's Report 2015 - 2016File: Audit Report - 2016.pdf-
Auditor's Report 2014 - 2015File: Audit Report - 2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income Tax Returns Acknowledgement - 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Returns Acknowledgement - 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Income Tax Returns Acknowledgement - 2015.pdf-
Declaration-
Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_181003_002020.xlsx-
Occupancy CertificateFile: COMPLETION.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep WESTGATE GARDENS 'BLOCK A' on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: SMR GROUP

SMR GROUP has 2 registrations on RERA Karnataka, including WESTGATE ETERNIA and WESTGATE GARDENS 'BLOCK A'. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if WESTGATE GARDENS 'BLOCK A' is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of WESTGATE GARDENS 'BLOCK A'?

The registered promoter entity is SMR GROUP. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in WESTGATE GARDENS 'BLOCK A'?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at WESTGATE GARDENS 'BLOCK A'?

The professionals named in the filing: Architect: 2PKM ARCHITECTS; Engineer: ASHOK M G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WESTGATE GARDENS 'BLOCK A'?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WESTGATE GARDENS 'BLOCK A'. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WESTGATE GARDENS 'BLOCK A' to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.