Home / Browse projects / Mumbai Suburban, Maharashtra / WEST AVENUE

Registration lapsed Litigation declared Residential / Group Housing project

WEST AVENUE

By M/s Dhabalia Enterprises

RG-MH-05173 · RERA P51800051576 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
10 of 11Construction stages donefurthest along: Basement (if any), 0%
11 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

WEST AVENUE is a Residential / Group Housing project by M/s Dhabalia Enterprises in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051576 on 27 Jun 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 10 of the 21 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameWEST AVENUE
  • TypeResidential / Group Housing
  • Location
    • 57th Road
    • TPS - 3
    • Borivali (West)
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051576
  • ReraGenie IDRG-MH-05173

Builder

  • NameM/s Dhabalia Enterprises
  • Entity typePartnership
  • PartnersMehul Jagdish Dhabalia, Vishal Jagdish Dhabalia

Key dates

7 months past promisethis monthRegisteredJun 2023PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

48%10 of 21 units booked
100.0%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WEST AVENUENA191517421

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

WEST AVENUE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area882 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2857.1
Proposed, not sanctioned2,857 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKastur Park,Borivali-West
Estimated costRs 28.32 cr
Cost incurredRs 28.32 cr
Work done100.0%
BuildingWingEstimatedIncurred
WEST AVENUENARs 26.05 crRs 26.05 cr
-NARs 2.27 crRs 2.27 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDivyesh Parekh
EngineerK. C. SHAH CONSULTANTS
EngineerN. D. Rathod & Associates
Chartered AccountantAnita A Yadav & Associates
Chartered AccountantH.P Jadeja & Associates
PartnerRole in project
M/s Dhabalia Enterprises-

Litigation declared1

CaseCourtStatus
9425/2023Bombay HighcourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jan 2024

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Q4 25-26 West Avenue.pdf29 May 2026
Withdrawal Update Form 2File: Form 2 Q4 25-26 West Avenue sign.pdf29 May 2026
Withdrawal Update Form 3File: Form 3 Q4 25-26 West Avenue sign.pdf29 May 2026
Commencement certificateFile: Full CC upto 15th Floor.pdf1 May 2026
Form 5 (FY 2024-2025)File: Form-5 FY-24-25 Dhabalia Enterprises.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 Q3 25-26.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Q3-25-26 FINAL (2).pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3-Dhabalia-Q3- FY 2025-26 FINAL.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 Q2 25-26.pdf27 Feb 2026
Withdrawal Update Form 2File: Form 2 Q2-25-26 FINAL(1).pdf27 Feb 2026
Withdrawal Update Form 3File: Form 3-Q2 25 -26.pdf27 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25 FINAL1.pdf27 Feb 2026
Withdrawal Update Form 1File: Form 1 Q1 25-26.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 Q1 25-26.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 Q1 25-26 FINAL.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 Q4 24-25.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 Q1 25-26.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 Q1 25-26.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 Q4 24-25.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 Q4 24-25.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 Q1 25-26.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Q4 FY-24-25 With UDIN .pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Q4 FY-24-25 With UDIN .pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Q4 FY-24-25 With UDIN .pdf21 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q3 FY-2024-25-WE.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q3 FY-2024-25-WE.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: 5 Disclosure of sold_ booked inventory (4).pdf20 Mar 2025
CERSAI detailsFile: 1 CERSAI details (1) (2)-1.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q3-FY-24-25-WE.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 Q4-FY-2023-24 FINAL.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 Q1-FY-2024-25 FINAL.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 Q2-FY-2024-25 FINAL.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-FY-2023-24.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5-FY-2023-24.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Q22425.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Q42324.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Q12425.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 -Q2 Architect Cert WE.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Q2-23-24-Sold Booked Inventory.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Q3-23-24-Sold Booked Inventory.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Q4-23-24-Sold Booked Inventory.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Q1-24-25-Sold Booked Inventory.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Q2-24-25-Sold Booked Inventory.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Q42324.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Q12425.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q1-2324.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q2-2324.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q3-2324.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Q1-2324.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Q2-2324.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Q3-2324.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch Jul 23.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch Oct 23.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Arch Jan24.pdf20 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OCC Apporved 29 11 2023.pdf27 Jan 2024
Building plan approvalFile: A Plan IOD Approval 180923.pdf24 Jan 2024
Layout approvalFile: A Plan Approval 180923-3.pdf24 Jan 2024
Layout approvalFile: A Plan Approval 180923-4.pdf24 Jan 2024
Layout approvalFile: A Plan Approval 180923-5.pdf24 Jan 2024
Copy of Layout Approval (in case of layout)File: A Plan Approval 180923-3.pdf24 Jan 2024
Copy of Layout Approval (in case of layout)File: A Plan Approval 180923-4.pdf24 Jan 2024
Copy of Layout Approval (in case of layout)File: A Plan Approval 180923-5.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: A Plan IOD Approval 180923.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: FCC approval 091023.pdf24 Jan 2024
Layout approvalFile: Plan Amended FINAL.pdf2 Dec 2023
Copy of Layout Approval (in case of layout)File: Plan Amended FINAL.pdf2 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: FCC approval 091023.pdf2 Dec 2023
Layout approvalFile: 2-FP 172 IOD Amanded Plan Jul22.pdf14 Jun 2023
Layout approvalFile: 3-FP 172 IOD Amanded Plan Jul22.pdf14 Jun 2023
Copy of Layout Approval (in case of layout)File: 2-FP 172 IOD Amanded Plan Jul22.pdf14 Jun 2023
Copy of Layout Approval (in case of layout)File: 3-FP 172 IOD Amanded Plan Jul22.pdf14 Jun 2023
Copy of the legal title reportFile: Title Certificate-FINAL.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FINAL.pdf31 May 2023
Building plan approvalFile: IOD Amneded PLAN upto 7 floors Jul 22 FINAL.pdf19 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf19 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf19 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf19 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf19 May 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Amneded PLAN upto 7 floors Jul 22 FINAL.pdf19 May 2023
Commencement Certificates / NA Order for plotted developmentFile: FP 172 - CC upto 7 floors.pdf19 May 2023

How this compares with Mumbai Suburban

48%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WEST AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali (West)6,700+ in Mumbai Suburban

2 kmWEST AVENUECompleted 120Lapsed / revoked 69Other 172Dot size: filed unitsN

Filed coordinates, straight-line distance. 361 registered projects within 2 km.

Builder: M/s Dhabalia Enterprises

M/s Dhabalia Enterprises has 1 registration on MahaRERA, including WEST AVENUE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that WEST AVENUE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if WEST AVENUE is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WEST AVENUE?

The registered promoter entity is M/s Dhabalia Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WEST AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WEST AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WEST AVENUE?

The professionals named in the filing: Architect: Divyesh Parekh; Engineer: K. C. SHAH CONSULTANTS; Engineer: N. D. Rathod & Associates; Chartered Accountant: Anita A Yadav & Associates; Chartered Accountant: H.P Jadeja & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WEST AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WEST AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WEST AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.