Home / Browse projects / Raigarh, Maharashtra / Wellwisher Town
Wellwisher Town
RG-MH-01685 · RERA P52000000721 · Last updated on MahaRERA portal: 6 Jul 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wellwisher Town is a Residential / Group Housing project by Wellwisher Properties in Raigarh, Maharashtra, registered with MahaRERA as P52000000721 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2025.
At a glance
Project
- NameWellwisher Town
- TypeResidential / Group Housing
- Location
- khopoli
- khopoli muncipal council
- Khalapur
- Raigarh
- 410203
- Pincode410203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000000721
- ReraGenie IDRG-MH-01685
Builder
- NameWellwisher Properties
- Entity typePartnership
- PartnerHimgiri Dealcom LLP Himgiri Dealcom LLP
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings13 building records
- Documents filed122 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| building no 1 | NA | 10 | 0 | 0 | 0 | 0 |
| Building no 2 | NA | 10 | 0 | 0 | 0 | 0 |
| Building No 3 | NA | 10 | 0 | 0 | 0 | 0 |
| Building No 4 | NA | 10 | 0 | 0 | 0 | 0 |
| building no 5 | NA | 10 | 0 | 0 | 0 | 0 |
| Building no 6 | NA | 10 | 0 | 0 | 0 | 0 |
| Building no 7 | NA | 10 | 0 | 0 | 0 | 0 |
| Building no 8 | NA | 10 | 0 | 0 | 0 | 0 |
| Building no 9 | NA | 16 | 0 | 0 | 0 | 0 |
| building no 10 | NA | 16 | 0 | 0 | 0 | 0 |
| building no 11 | NA | 0 | 0 | 0 | 0 | 0 |
| club house | NA | 3 | 0 | 0 | 0 | 0 |
| Municipal office | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building13
As on 6 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
109 of 143 construction stages are filed complete across 13 buildings. The stage furthest along is Podiums (if any), at 0%.
building no 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
building no 591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
building no 1045%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
building no 110%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
club house36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Municipal office91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 48% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 30% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 30% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed774
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| building no 1 | 50 | 45 | 95 |
| Building no 2 | 0 | 20 | 20 |
| Building No 3 | 86 | 27 | 113 |
| Building No 4 | 30 | 68 | 98 |
| building no 5 | 0 | 20 | 20 |
| Building no 6 | 35 | 59 | 94 |
| Building no 7 | 92 | 66 | 158 |
| Building no 8 | 92 | 46 | 138 |
| Municipal office | 38 | 0 | 38 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s. DESTINATION ARCHITECTURE INTERIOR DESIGNS |
| Engineer | Adarshila Consultants |
| Partner | Role in project |
|---|---|
| Wellwisher Properties | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jul 2024
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building no-10 OC Verified.pdf | 6 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 F Y 2022-23-WP.pdf | 1 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building No 9 occupancy.pdf | 13 Jan 2024 |
| Proforma of Agreement for saleFile: rera DEED -.pdf | 22 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3-WP_Signed.pdf | 15 May 2023 |
| Certificates of CA (Form 3)File: CA-Certifcate -WP-Dec 2022_Signed.pdf | 22 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-WP-F Y 2021-22.pdf | 19 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC BUILDING NO 3 5 6 7 8.pdf | 18 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate BUILDING NO 4.pdf | 18 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building No 9 occupancy (2).pdf | 18 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-WP-F Y 2020-21.pdf | 10 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 53-FORM 2.pdf | 14 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 TILL NOV 31 R2.pdf | 29 Dec 2022 |
| Certificates of CA (Form 3)File: FORM 3-JUNE 2022 WP.pdf | 16 Dec 2022 |
| Certificates of CA (Form 3)File: FORM 3-SEPT 2022 WP.pdf | 16 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New doc Jul 15, 2022-Dec 2021_compressed-compressed.pdf | 18 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New doc Jul 15, 2022 -March 2022 (1).pdf | 18 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New doc Jul 15, 2022 -June 2022 (1).pdf | 18 Jul 2022 |
| Certificates of CA (Form 3)File: ilovepdf_merged.pdf | 21 Apr 2022 |
| Certificates of CA (Form 3)File: ilovepdf_merged.pdf | 21 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 WP 30092021.pdf | 21 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 WP 31122021.pdf | 21 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 1st -1,2,4.pdf | 13 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 38_fORM 1.pdf | 22 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 52-FORM 2.pdf | 22 Mar 2021 |
| Certificates of CA (Form 3)File: Form 3-Dec 2020.pdf | 20 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Annual F Y 2019-20-WP.pdf | 19 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 37 Sept 2020.pdf | 7 Dec 2020 |
| Certificates of CA (Form 3)File: Form 3 Sept 2020.pdf | 7 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC.pdf | 4 Dec 2020 |
| Certificates of CA (Form 3)File: Form 3- Dec2019.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3-March 2020.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3- June 2020.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA Annual Report-F Y 2018-19-WP.pdf | 9 Mar 2020 |
| OtherFile: RERA LETTER_compressed (1).pdf | 3 Mar 2020 |
| Certificates of CA (Form 5)File: RERA Annual Report-F Y 2018-19-WP.pdf | 28 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate_compressed.pdf | 9 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 9 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate_compressed.pdf | 9 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_compressed.pdf | 9 Nov 2019 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 9 Nov 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 9 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 1-4.pdf | 28 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 5-8.pdf | 28 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate 1-5.pdf | 28 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate 6-9.pdf | 28 May 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 28 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-1-4.pdf | 29 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-5-8.pdf | 29 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-1-5.pdf | 29 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-6-9.pdf | 29 Jan 2019 |
| Certificates of CA (Form 3)File: CA Certificate final.pdf | 29 Jan 2019 |
| Certificates of CA (Form 5)File: form 5.pdf | 29 Dec 2018 |
| Certificates of CA (Form 3)File: CA certificate final.pdf | 27 Nov 2018 |
| Certificates of CA (Form 3)File: CA certificate final.pdf | 27 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate-1-4.pdf | 20 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate-5-8.pdf | 20 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-1-5.pdf | 20 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-6-9.pdf | 20 Nov 2018 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 11 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 1-4.pdf | 5 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 5-8.pdf | 5 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate 1-5.pdf | 5 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate 6-9.pdf | 5 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-1-3.pdf | 27 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-4-6.pdf | 27 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-7-8.pdf | 27 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-1-5.pdf | 27 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate--6-9.pdf | 27 Mar 2018 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 27 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-1-4.pdf | 18 Nov 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-5-7.pdf | 18 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-1-5.pdf | 18 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-6-9.pdf | 18 Nov 2017 |
| Certificates of CA (Form 3)File: Ca certificate -1-7.pdf | 18 Nov 2017 |
| Certificates of CA (Form 3)File: Ca certificate -8-13.pdf | 18 Nov 2017 |
| Certificates of CA (Form 3)File: Ca certificate -14-19.pdf | 18 Nov 2017 |
| Certificates of CA (Form 3)File: Ca certificate -20-26.pdf | 18 Nov 2017 |
| Details of encumbrancesFile: encumbrance certificate-1-1.pdf | 15 Nov 2017 |
| Proforma of Allotment letterFile: rera deed regular.pdf | 15 Nov 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
Keep Wellwisher Town on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near khopoli muncipal council5,900+ in Raigarh
Filed coordinates, straight-line distance. 65 registered projects within 2 km.
Godrej Hillview Estate
Godrej Projects Development Limited
Haware My First Home Shil Phata Phase 2 Bldg 1
Haware Properties LLP
UNIMONT IMPERIA
RSM DESIGNERS
Haware My First Home Shil Phata Phase 1 Bldg 1
Haware Properties LLP
AeroEstate
HOABL Landmark Realty Private Limited
Haware My First Home Shil Phata Phase 2 Bldg 2
Haware Properties LLP
See every Raigarh project, with the district possession charts
Builder: Wellwisher Properties
Wellwisher Properties has 1 registration on MahaRERA, including Wellwisher Town. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Wellwisher Town is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wellwisher Town?
The registered promoter entity is Wellwisher Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wellwisher Town?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Wellwisher Town?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wellwisher Town?
The professionals named in the filing: Architect: M/s. DESTINATION ARCHITECTURE INTERIOR DESIGNS; Engineer: Adarshila Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wellwisher Town?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback