ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / WELLINGTON F-G

Registered No litigation declared Residential / Group Housing project

WELLINGTON F-G

By PRIDE BUILDERS LLP

RG-MH-45618 · RERA P52100054534 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 80%
3 of 270Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

WELLINGTON F-G is a Residential / Group Housing project by PRIDE BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100054534 on 25 Jan 2024. Possession is promised by 31 Dec 2027. 267 of the 270 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameWELLINGTON F-G
  • TypeResidential / Group Housing
  • Location
    • DY PATIL KNOWLEDGE CITY ROAD
    • PCMC
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100054534
  • ReraGenie IDRG-MH-45618

Builder

  • NamePRIDE BUILDERS LLP
  • Entity typeOthers
  • GSTIN27AAPFP0869F1ZV
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Authorised SignatorySURYKANTH DHANAWADE DHANAWADE
  • PartnerPRIDE BUILDERS LLP LLP
  • Other registrations12 more →
  • Completed3 of 13
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

99%267 of 270 units booked
80.9%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WELLINGTON FNA26231350135
WELLINGTON GNA26231350135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.

WELLINGTON F67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WELLINGTON G65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed292

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots292
Closed/Covered270
Open Space22
BuildingClosed/CoveredOpen SpaceTotal
WELLINGTON F13511146
WELLINGTON G13511146

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,410 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI36146.86
Proposed, not sanctioned31,432 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE 411005
Estimated costRs 90.27 cr
Cost incurredRs 73.04 cr
Work done80.91%
BuildingWingEstimatedIncurred
WELLINGTON FNARs 45.14 crRs 41.66 cr
WELLINGTON GNARs 45.14 crRs 31.38 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPATIL & BUGADE ASSOCIATES
ArchitectAVINASH PATIL & ASSOCIATES
EngineerDNYANESHWAR RAJENDRA MANE
EngineerSHRI DEEPAK GHEWADE
EngineerSHANTANU GANJAVE
Chartered AccountantSAC & CO LLP
Chartered AccountantShah Khandelwal Jain & Associates
PartnerRole in project
PRIDE BUILDERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: QTY ASSURANCE CERT FORM 2A WELLINGTON FG.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 Wellington F-G.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2 Wellington F-G.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3 Wellington F-G.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: System Generated Form 5 Wellington FG.pdf2 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf26 Nov 2025
Form 1File: Form 1.pdf16 Oct 2025
Form 2File: Form 2.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf16 Oct 2025
Form 1File: ARCHITECT CERT WELLINGTON FG 30062025.pdf16 Oct 2025
Form 2File: ENGINEER CERT WELLINGTON FG 30062025.pdf16 Oct 2025
Form 3File: Form 3 upload.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf16 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pride Wellington FG.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON F G 31032025.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON FG 31032025.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON FG 31032025.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT WELLINGTON FG 14012025.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT WELLINGTON FG 14012025.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WELLINGTON F G.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wellington F G.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT WELLINGTON F G.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WELLINGTON F G.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wellington F G.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT WELLINGTON F G.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WELLINGTON F G.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wellington F G.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT WELLINGTON F G.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT FORM 3 WELLINGTON F G 30092024.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT FORM 3 WELLINGTON F G 30092024.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT FORM 3 WELLINGTON F G 30092024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON FG 30092024.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON FG 30092024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON FG 30092024.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON FG 30092024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON FG 30092024.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON FG 30092024.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 weelington F G.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON FG 30062024.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON F G 30062024.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON FG 30062024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON F G 31032024.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON F G 31032024.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTY ASSURANCE CERT WELLINGTON F G 31032024.pdf11 Apr 2024
Other - TechnicalFile: MAIL BY PCMC TO MAHARERA ABOUT COMMENCMENT.pdf1 Dec 2023
Declaration in FORM BFile: FORM B AFF CUM DECLARATION WELLINGTON FG 29112023.pdf29 Nov 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER DRAFT.pdf29 Nov 2023
Proforma of Agreement for saleFile: AGREEMENT DRAFT 10012024.pdf29 Nov 2023
Layout approvalFile: LAYOUT.pdf28 Nov 2023
Building plan approvalFile: F building Typical Fl.pdf28 Nov 2023
Building plan approvalFile: F BUILDING Refuge Fl.pdf28 Nov 2023
Building plan approvalFile: G building Refuge Fl.pdf28 Nov 2023
Building plan approvalFile: G buildingTypical Fl.pdf28 Nov 2023
PAN CardFile: PBLLP PAN CARD COPY.pdf28 Nov 2023
Copy of the legal title reportFile: TITLE REPORT WELLINGTON F G 02012024.pdf28 Nov 2023
Copy of the legal title reportFile: TITLE REPORT.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: SELF DECLARATION WELLINGTON FG 29112023.pdf28 Nov 2023
Details of encumbrances concerned to LegalFile: SELF DECLARATION WELLINGTON FG 29112023.pdf28 Nov 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: F building Typical Fl.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: F BUILDING Refuge Fl.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: G building Refuge Fl.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: G buildingTypical Fl.pdf28 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencment.pdf28 Nov 2023
Declaration about Commencement CertificateFile: DECLARATION CC WELLINGTON FG 29112023.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE WELLINGTON - F-G.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wellington FG Bldg Engineer Certificate.pdf28 Nov 2023
CERSAI detailsFile: CERSAI CERT WELLINGTON FG 29112023.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wellington FG CA certificate.pdf28 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest.pdf28 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Disclosure of interest by Partner.pdf28 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DISCLOSURE OF INTEREST.pdf28 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A DECLARATION WELLINGTON FG 29112023.pdf28 Nov 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT WELLINGTON FG 29112023.pdf28 Nov 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise4 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
BROOKLYNS NO 129 CHARHOLI NEAR DY PATIL COLLEGE PUNE550-CompletedDec 2016Oct 2016

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WELLINGTON F-G on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PCMC13,700+ in Pune

Builder: PRIDE BUILDERS LLP

PRIDE BUILDERS LLP has 13 registrations on MahaRERA, including MANHATTAN and ATLANTIC. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WELLINGTON F-G is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WELLINGTON F-G?

The registered promoter entity is PRIDE BUILDERS LLP, an others as per the filing. Its GSTIN 27AAPFP0869F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WELLINGTON F-G?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WELLINGTON F-G?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WELLINGTON F-G?

The professionals named in the filing: Architect: PATIL & BUGADE ASSOCIATES; Architect: AVINASH PATIL & ASSOCIATES; Engineer: DNYANESHWAR RAJENDRA MANE; Engineer: SHRI DEEPAK GHEWADE; Engineer: SHANTANU GANJAVE; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WELLINGTON F-G?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WELLINGTON F-G. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WELLINGTON F-G to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.