Home / Browse projects / Pune, Maharashtra / MANHATTAN
MANHATTAN
RG-MH-16662 · RERA P52100026529 · Last updated on MahaRERA portal: 16 Dec 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MANHATTAN is a Residential / Group Housing project by PRIDE BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100026529 on 30 Sep 2020. The registration is recorded completed; possession was promised by 1 Oct 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameMANHATTAN
- TypeResidential / Group Housing
- Location
- D Y PATIL COLLEGE
- CHARHOLI BK
- CHARHOLI
- Haveli
- Pune
- 412015
- Pincode412015
- RERA no.P52100026529
- ReraGenie IDRG-MH-16662
Builder
- NamePRIDE BUILDERS LLP
- Entity typeOthers
- GSTIN27AAPFP0869F1ZV
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Authorised SignatorySURYKANTH DHANAWADE DHANAWADE
- PartnerPRIDE BUILDERS LLP LLP
- Other registrations12 more →
- Completed3 of 13
- No longer live3 lapsed, de-registered or revoked
- Past their filed date2
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Sep 2020
- Promised completion1 Oct 2024
- Revised completionNone
- Buildings6 building records
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MANHATTAN A | NA | 22 | 0 | 0 | 0 | 0 |
| MANHATTAN B | NA | 22 | 0 | 0 | 0 | 0 |
| MANHATTAN C | NA | 22 | 0 | 0 | 0 | 0 |
| MANHATTAN D | NA | 22 | 0 | 0 | 0 | 0 |
| MANHATTAN F | NA | 22 | 0 | 0 | 0 | 0 |
| MANHATTAN G | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 16 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
59 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.
MANHATTAN A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MANHATTAN B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MANHATTAN C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MANHATTAN D86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MANHATTAN F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MANHATTAN G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed732
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| MANHATTAN A | 122 | 122 |
| MANHATTAN B | 122 | 122 |
| MANHATTAN C | 122 | 122 |
| MANHATTAN D | 122 | 122 |
| MANHATTAN F | 122 | 122 |
| MANHATTAN G | 122 | 122 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AVINASH ANNASAHEB PATIL |
| Engineer | MILIND BHOITE |
| Chartered Accountant | BRIJ MANTRI & COMPANY |
| Chartered Accountant | AMIT SINGHAVI |
| Partner | Role in project |
|---|---|
| PRIDE BUILDERS LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1981/2016 | CIVIL JUDGE JUNIOR DIVISION PUNE | AT EVIDENCE STAGE |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601251 | Manish Chhaparwal | PRIDE BUILDERS LLP | 07/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Jul 2024
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Manhattan.pdf | 16 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RERA FORM 4 COMPLITION CDF MANHATTAN.pdf | 26 Jul 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: RERA FORM 4 COMPLITION CDF MANHATTAN.pdf | 26 Jul 2024 |
| Other - TechnicalFile: RERA FORM 4 COMPLITION CDF MANHATTAN.pdf | 26 Jul 2024 |
| Other - TechnicalFile: PCMC mail of Manhattan.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Manhattan Engineering Certificate.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT MANHATTAN 31032024.pdf | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT MANHATTAN 31032024.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTY ASSURANCE CERT MANHATTAN 31032024.pdf | 11 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MANHATTEN 1.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MANHATTEN ENG.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MANHATTEN.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A CERT MANHATTAN 01112023.pdf | 10 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MANHATTAN QULITY PH1.pdf | 10 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: qulity cluster 3.pdf | 7 Jul 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCH CERT MANHATTAN AND COMPLETION ABG.pdf | 30 Jun 2023 |
| Other - TechnicalFile: ARCH CERT MANHATTAN AND COMPLETION ABG.pdf | 27 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MANHATTAN QUALITY.pdf | 12 Apr 2023 |
| Declaration about Commencement CertificateFile: DECLARATION CC MANHATTAN 02022023.pdf | 2 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT MANHATTAN 19012023.pdf | 24 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT MANHATTAN ABCDFG 31122022.pdf | 10 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT MANHATTAN ABCDFG 31122022.pdf | 10 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT MANHATTAN 31122022.pdf | 10 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MANHATTAN 21112022.pdf | 24 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Manhattan.pdf | 14 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QULITY MANHATEN PH 1.pdf | 20 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: manhaten qulity.pdf | 12 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 ALONGWITH ANNEXTURE MANHATTAN.pdf | 6 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Manhattan.pdf | 1 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QTY ASSURANCE CERT MANHATTAN 31122021.pdf | 6 Jan 2022 |
| CERSAI detailsFile: Pride Builders LLP.pdf | 6 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: manhattan.pdf | 9 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Manhattan Signed Form 3.pdf | 6 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QULITY Manhattan.pdf | 17 Jul 2021 |
| Building plan approvalFile: ABCD Even floor plan.pdf | 8 May 2021 |
| Building plan approvalFile: ABCD seventeenth floor plan.pdf | 8 May 2021 |
| Building plan approvalFile: EFG Even floor plan.pdf | 8 May 2021 |
| Building plan approvalFile: EFG ground floor plan.pdf | 8 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: ABCD Even floor plan.pdf | 8 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: ABCD seventeenth floor plan.pdf | 8 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: EFG Even floor plan.pdf | 8 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: EFG ground floor plan.pdf | 8 May 2021 |
| Layout approvalFile: cluster 3 layout copy.pdf | 7 May 2021 |
| Copy of Layout Approval (in case of layout)File: cluster 3 layout copy.pdf | 7 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC SEC 4 DT 16042021.pdf | 7 May 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QEC MANHETA CLUSTER 3.pdf | 7 May 2021 |
| Proforma of Allotment letterFile: Manhattan agreement.pdf | 7 May 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QTY ASSURANCE CERTMANHATTAN 09012021.pdf | 13 Jan 2021 |
| Proforma of Allotment letterFile: Manhattan agreement A-B Building 10-12-2020.pdf | 10 Dec 2020 |
| Layout approvalFile: Layout.pdf | 5 Oct 2020 |
| Building plan approvalFile: Even Floor.pdf | 5 Oct 2020 |
| Building plan approvalFile: Odd Floor.pdf | 5 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 5 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Even Floor.pdf | 5 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Odd Floor.pdf | 5 Oct 2020 |
| Copy of the legal title reportFile: Title Opinion sector 4.pdf | 28 Sep 2020 |
| PAN CardFile: PAN PBLLP.pdf | 26 Sep 2020 |
| Layout approvalFile: cluster 3 layout.pdf | 25 Sep 2020 |
| Building plan approvalFile: First floor plan.pdf | 25 Sep 2020 |
| Details of encumbrancesFile: SELF DECLARATION .pdf | 25 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: cluster 3 layout.pdf | 25 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: First floor plan.pdf | 25 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 25 Sep 2020 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION .pdf | 25 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 25 Sep 2020 |
| Proforma of Allotment letterFile: Manhattan Agreement LOI.pdf | 25 Sep 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BROOKLYN | S NO 129 CHARHOLI NEAR DY PATIL COLLEGE PUNE | 550 | Completed | Dec 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
Keep MANHATTAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARHOLI BK13,700+ in Pune
BOSTON A B C
R P PROPERTIES
SOHO
PRIDE BUILDERS LLP
WELLINGTON C - D
PRIDE BUILDERS LLP
WELLINGTON-L-M
PRIDE BUILDERS LLP
KALAAPI CIRA
SHILP PROPERTIES
MANHATTAN-E BUILDING
PRIDE BUILDERS LLP
Builder: PRIDE BUILDERS LLP
PRIDE BUILDERS LLP has 13 registrations on MahaRERA, including MANHATTAN and ATLANTIC. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MANHATTAN is delayed beyond 1 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MANHATTAN?
The registered promoter entity is PRIDE BUILDERS LLP, an others as per the filing. Its GSTIN 27AAPFP0869F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MANHATTAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MANHATTAN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MANHATTAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MANHATTAN?
The professionals named in the filing: Architect: AVINASH ANNASAHEB PATIL; Engineer: MILIND BHOITE; Chartered Accountant: BRIJ MANTRI & COMPANY; Chartered Accountant: AMIT SINGHAVI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANHATTAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback