Home / Browse projects / Pune, Maharashtra / WELLINGTON- A-B
WELLINGTON- A-B
RG-MH-22281 · RERA P52100031008 · Last updated on MahaRERA portal: 16 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WELLINGTON- A-B is a Residential / Group Housing project by PRIDE BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100031008 on 29 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameWELLINGTON- A-B
- TypeResidential / Group Housing
- Location
- D Y PATIL ROAD
- CHARHOLI PCMC
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100031008
- ReraGenie IDRG-MH-22281
Builder
- NamePRIDE BUILDERS LLP
- Entity typeOthers
- GSTIN27AAPFP0869F1ZV
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Authorised SignatorySURYKANTH DHANAWADE DHANAWADE
- PartnerPRIDE BUILDERS LLP LLP
- Other registrations12 more →
- Completed3 of 13
- No longer live3 lapsed, de-registered or revoked
- Past their filed date2
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Sep 2021
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed64 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WELLINGTON- A | NA | 27 | 0 | 0 | 0 | 0 |
| WELLINGTON- B | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
WELLINGTON- A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WELLINGTON- B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed284
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WELLINGTON- A | 137 | 5 | 142 |
| WELLINGTON- B | 137 | 5 | 142 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MAHAVEER CO-OPERATIVE HOUSING SOCIETY LTD | CHARHOLI | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| PRIDE BUILDERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: RERA 31008 OC mail.pdf | 16 Jul 2025 |
| Occupational CertificateFile: FORM 4 ARCHITECT CERT WELLINGTON A B.pdf | 20 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pride Wellington AB.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON A B 31032025.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON AB 31032025.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON AB 31032025.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT WELLINGTON AB 14012025.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WELLINGTON A B.pdf | 10 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Wellington A B.pdf | 10 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT WELLINGTON A B.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Wellington AB.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT FORM 3 WELLINGTON A B 30092024.pdf | 17 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER ERT WELLINGTON AB 30092024.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON AB 30092024.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Wellington A B.pdf | 30 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON A B 30062024.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON A B 30062024.pdf | 26 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT WELLINGTON A B 30062024.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT WELLINGTON A B 15042024.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON A B 31032024.pdf | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WELLINGTON A B 31032024.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTY ASSURANCE CERT WELLINGTON A B 31032024.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wellington AB.pdf | 17 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate WellingtonAB bldg.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WELLINGTON AB ENGINEER CERTIFICATE DEC 2023.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: WELLINGTON A B.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A CERT WELLINGTON A B 01112023.pdf | 10 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate Wellington A B bldg.pdf | 10 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTY ASSURANCE CERT WELLINGTON A B 30062023.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: wellingtion A B QUALITY.pdf | 12 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT WELLINGTON A B 07012023.pdf | 2 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT WELLINGTON AB 31122022.pdf | 10 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT WELLINGTON A B 31122022.pdf | 10 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT WELLINGTON A B 31122022.pdf | 10 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 WELLINGTON A B 21112022.pdf | 24 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Wellington Aand B bldg.pdf | 14 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: wellington A B qulity.pdf | 20 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QTY ASSURANCE CERT WELLINGTON A B 31032022.pdf | 12 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QTY ASSURANCE CERT WELLINGTON A B 31122021.pdf | 6 Jan 2022 |
| CERSAI detailsFile: Pride Builders LLP.pdf | 6 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: WELLINGTON C C 13 12 2021.pdf | 13 Dec 2021 |
| Building plan approvalFile: Annexure Bldg B Typical Floor.pdf | 13 Nov 2021 |
| Building plan approvalFile: Annexure Bldg B Refuge Floor.pdf | 13 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Annexure Bldg B Typical Floor.pdf | 13 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Annexure Bldg B Refuge Floor.pdf | 13 Nov 2021 |
| Declaration in FORM BFile: WELLINGTON AFF CUM DECLARATION FORM B 01112021.pdf | 1 Nov 2021 |
| Proforma of Allotment letterFile: Wellington Agreement for A AND B Final.pdf | 1 Nov 2021 |
| Details of encumbrancesFile: SELF DECLARATION WELLINGTON LETTER HEAD.pdf | 9 Sep 2021 |
| Layout approvalFile: Wellington Layout.pdf | 1 Sep 2021 |
| Building plan approvalFile: Even Floor plan.pdf | 1 Sep 2021 |
| Building plan approvalFile: Odd Floor Plan.pdf | 1 Sep 2021 |
| PAN CardFile: PAN PBLLP.pdf | 1 Sep 2021 |
| Copy of the legal title reportFile: TITLE REPORT WELLINGTON 01092021_compressed.pdf | 1 Sep 2021 |
| Copy of the legal title reportFile: LEGAL TITLE FOR RERA 01092021.pdf | 1 Sep 2021 |
| Details of encumbrancesFile: SELF DECLARATION WELLINGTON 01092021.pdf | 1 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: Wellington Layout.pdf | 1 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Even Floor plan.pdf | 1 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Odd Floor Plan.pdf | 1 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement willington.pdf | 1 Sep 2021 |
| Declaration about Commencement CertificateFile: C C DECLARATION WELLINGTON 01092021.pdf | 1 Sep 2021 |
| Declaration in FORM BFile: AFFIDAVIT WELLINGTON 01092021.pdf | 1 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed Wellington.pdf | 1 Sep 2021 |
| Proforma of Allotment letterFile: Agreement to sale draft Wonder Land.pdf | 1 Sep 2021 |
| Proforma of Allotment letterFile: LOI Wonder land.pdf | 1 Sep 2021 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| MANHATTANP52100026529 | CHARHOLI BK, Pune | - | Sep 2020 | Ongoing | Oct 2024 | Not delivered |
| MANHATTANP52100026529 | CHARHOLI BK, Pune | - | Sep 2020 | Ongoing | Oct 2024 | Not delivered |
| MANHATTANP52100026529 | CHARHOLI BK, Pune | - | Sep 2020 | Ongoing | Oct 2024 | Not delivered |
| MANHATTANP52100026529 | CHARHOLI BK, Pune | - | Sep 2020 | Ongoing | Oct 2024 | Not delivered |
| BROOKLYN | S NO 129 CHARHOLI NEAR DY PATIL COLLEGE PUNE | 550 | - | Completed | Dec 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 12 other registrations, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
Keep WELLINGTON- A-B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARHOLI PCMC13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: PRIDE BUILDERS LLP
PRIDE BUILDERS LLP has 13 registrations on MahaRERA, including MANHATTAN and ATLANTIC. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if WELLINGTON- A-B is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WELLINGTON- A-B?
The registered promoter entity is PRIDE BUILDERS LLP, an others as per the filing. Its GSTIN 27AAPFP0869F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WELLINGTON- A-B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for WELLINGTON- A-B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in WELLINGTON- A-B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback