WAMAN NAGARI
By SACCHIDANAND REALITIES PRIVATE LIMITED
RG-MH-61883 · RERA P50500018406 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 57 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WAMAN NAGARI is a Others project by SACCHIDANAND REALITIES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500018406 on 30 Oct 2018. Possession is promised by 31 Dec 2029. The completion date has moved by 57 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameWAMAN NAGARI
- TypeOthers
- Location
- Besa Pipla Road
- Pipla
- Nagpur (Rural)
- Nagpur
- 440034
- Pincode440034
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500018406
- ReraGenie IDRG-MH-61883
Builder
- NameSACCHIDANAND REALITIES PRIVATE LIMITED
- Entity typeCompany
- CINU45209MH2017PTC300877
- GSTIN27AAZCS3614A1Z9
- DirectorsPankaj Ramrao Thakre, Pravin Wamanrao Bhoyar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Oct 2018
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 30 Mar 2025)
- Buildings4 building records
- Documents filed152 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 14 | 0 | 0 | 0 | 0 |
| WING B | NA | 14 | 0 | 0 | 0 | 0 |
| WING C | NA | 12 | 0 | 0 | 0 | 0 |
| WING D | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
31 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 30%.
WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING D15%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities19
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 65% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 60% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 65% |
| Water conservation /Rain water harvesting | Yes | 65% |
| Energy managemcnt | Yes | 60% |
| Fire protection and fire safety requirements | Yes | 65% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| SPORTS BASKETBALL COURT CRICKET PRACTICE PITCH BATMINTON COURT CYCLING TRACK SNOOKER TABLE TENNIS | Yes | 30% |
| NATURE AND LANDSCAPE LANDSCAPED GARDEN GARDEN WALKWAY TEMPLE | Yes | 30% |
| HEALTH SWIMMING POOL MEDITAION AND YOGA AREA WALKINS AND JOGGING TRACK GYMNASIUM | Yes | 0% |
| ENTERTAINMENT CLUB HOUSE INDOOR GAME ZONE CHILDREN PLAY AREA PARTY LAWN SAND PIT PLAY AREA GUFTGU HU | Yes | 0% |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 0 | 1 | 1 |
| WING B | 0 | 1 | 1 |
| WING C | 1 | 1 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SACCHIDANAD REALITIES PRIVATE LIMITED | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Wave Artifact Design |
| Engineer | Divine projects |
| Chartered Accountant | APJ & Associates |
| Partner | Role in project |
|---|---|
| SACCHIDANAND REALITIES PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs the sanctioning for Tower D was delayed due to the Environment clearance issue.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12400016 | Mrinal Katkar | SACCHIDANAND REALITIES PRIVATE LIMITED | 12/11/2024 |
| SM12500054 | Mrinal Katkar | SACCHIDANAND REALITIES PRIVATE LIMITED | 16/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2018 - Layout approvalNot on the file
The planning authority's approval of how the plots and buildings sit on the land.
- Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Mar 2024
Documents filed152
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2 31-12-25.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Annexure 29 30-09-2025.pdf | 26 Jun 2026 |
| Form 3File: FORM 3 31-12-2025.pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 26 Jun 2026 |
| Form 2File: Form 2 30-3-26.pdf | 26 Jun 2026 |
| Form 3File: FORM 3 31-03-2026.pdf | 26 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Annexure 29 30-09-2025.pdf | 26 Jun 2026 |
| Form 1File: Form 1.pdf | 13 Apr 2026 |
| Form 2File: Form 2.pdf | 13 Apr 2026 |
| Form 3File: Form 3.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: ANNEXURE 29 30-06-2023.pdf | 13 Apr 2026 |
| Form 1File: Form 1 -30-6-23.pdf | 13 Apr 2026 |
| Form 2File: FORM 2 30-6-23.pdf | 13 Apr 2026 |
| Form 3File: 3_Form 3 30-06-23.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: ANNEXURE 29 30-06-2023.pdf | 13 Apr 2026 |
| Form 1File: Form 1 30-09-23.pdf | 13 Apr 2026 |
| Form 2File: FORM 2 30-9-23.pdf | 13 Apr 2026 |
| Form 3File: 3_Form 3 30-9-23.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: ANNEXURE 29 30-09-2023.pdf | 13 Apr 2026 |
| Form 1File: FORM 1 -31-12-23.pdf | 13 Apr 2026 |
| Form 2File: FORM 2 31-12-23.pdf | 13 Apr 2026 |
| Form 3File: 3_Form 3.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: ANNEXURE 29 31-12-2023.pdf | 13 Apr 2026 |
| Form 1File: form 1 31-03-2024.pdf | 13 Apr 2026 |
| Form 2File: 2_FORM 2 31-3-24.pdf | 13 Apr 2026 |
| Form 3File: 3_Form 3 31-3-24.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: ANNEXURE 29 31-03-2024.pdf | 13 Apr 2026 |
| Form 2File: Form 2.pdf | 13 Apr 2026 |
| Form 3File: form 3 30-06-2024.pdf | 13 Apr 2026 |
| Form 1File: Architects Certificate.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Annexure 29.pdf | 13 Apr 2026 |
| Form 1File: Form-1 30-09-2024.pdf | 13 Apr 2026 |
| Form 2File: Form-2 30-09-2024.pdf | 13 Apr 2026 |
| Form 3File: Form-3 30-09-2024 Sign.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Annexure-29 30-09-2024.pdf | 13 Apr 2026 |
| Form 1File: Form-1 31-12-2024.pdf | 13 Apr 2026 |
| Form 2File: Form-2 31-12-2024.pdf | 13 Apr 2026 |
| Form 3File: Form-3 31-12-2024 Sign.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Anexxure-29 31-12-2024.pdf | 13 Apr 2026 |
| Form 1File: Form 1.pdf | 13 Apr 2026 |
| Form 2File: form 2- 31-03-25.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-03-25.pdf | 13 Apr 2026 |
| Form 3File: Form 3 31-03-2025.pdf | 13 Apr 2026 |
| Form 1File: Form 1.pdf | 13 Apr 2026 |
| Form 2File: form 2-30-6-25.pdf | 13 Apr 2026 |
| Form 3File: Form 3 30-06-25.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-25.pdf | 13 Apr 2026 |
| Form 1File: Form 1.pdf | 13 Apr 2026 |
| Form 2File: Form 2.pdf | 13 Apr 2026 |
| Form 3File: Form-3 30-09-2025.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Annexure 29 30-09-2025.pdf | 13 Apr 2026 |
| Declaration in FORM BFile: 1C Form B.pdf | 3 Apr 2025 |
| Declaration about Commencement CertificateFile: 1B Declaration About Commencement Certificate.pdf | 3 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Anexxure-29 31-12-2024.pdf | 25 Mar 2025 |
| CERSAI detailsFile: Sacchidanand Declaration for cersai.pdf | 4 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Sacchidananad Format A.pdf | 4 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 30-09-2024.pdf | 8 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 31-12-2024.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Annexure-29 30-09-2024.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form-3 30-09-2024 Sign.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form-3 31-12-2024 Sign.pdf | 8 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 30-09-2024.pdf | 8 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 31-12-2024.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure-29 30-09-2024.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Form-3 31-12-2024 Sign.pdf | 8 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_0001.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Annexure 29.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: form 3 30-06-2024.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: ANNEXURE 29 30-06-2023.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: ANNEXURE 29 30-09-2023.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: ANNEXURE 29 31-12-2023.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: ANNEXURE 29 31-03-2024.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -30-6-23.pdf | 10 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-23.pdf | 10 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -31-12-23.pdf | 10 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 31-03-2024.pdf | 10 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30-6-23.pdf | 10 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 152 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WAMAN NAGARI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pipla2,800+ in Nagpur
Filed coordinates, straight-line distance. 51 registered projects within 2 km.
BHEDE NAGARI -CHARITON
DILIP GANPATRAO BHEDE
Godrej Orchard Estate
Godrej Properties Limited
MELBOURNE CITY
M/S 4 PILLARS REALTY
GARDEN HOMES ATHARVA NAGARI VII
ATHARVA INFRASTRUCTURES
ROYAL EMPIRE
M B INFRA
Ved Vidhi Ventures
Ved Vidhi Ventures
See every Nagpur project, with the district possession charts
Builder: SACCHIDANAND REALITIES PRIVATE LIMITED
SACCHIDANAND REALITIES PRIVATE LIMITED has 1 registration on MahaRERA, including WAMAN NAGARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if WAMAN NAGARI is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WAMAN NAGARI?
The registered promoter entity is SACCHIDANAND REALITIES PRIVATE LIMITED, a company as per the filing. Its CIN U45209MH2017PTC300877 and GSTIN 27AAZCS3614A1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WAMAN NAGARI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WAMAN NAGARI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WAMAN NAGARI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WAMAN NAGARI?
The professionals named in the filing: Architect: Wave Artifact Design; Engineer: Divine projects; Chartered Accountant: APJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WAMAN NAGARI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback