Home / Browse projects / Amravati, Maharashtra / VRUNDAWAN PRIME

Completed No litigation declared Residential / Group Housing project

VRUNDAWAN PRIME

By Vijay Nanakram Talda

RG-MH-01951 · RERA P50300022806 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

VRUNDAWAN PRIME is a Residential / Group Housing project by Vijay Nanakram Talda in Amravati, Maharashtra, registered with MahaRERA as P50300022806 on 30 Oct 2019. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameVRUNDAWAN PRIME
  • TypeResidential / Group Housing
  • Location
    • AMRAVATI NAGPUR NATIONAL HIGHWAY NO 6
    • RAHATGAON
    • Amravati (M Corp.)
    • Amravati
    • 444601
  • Pincode444601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300022806
  • ReraGenie IDRG-MH-01951

Builder

  • NameVijay Nanakram Talda
  • Entity typeIndividual
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2019PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Oct 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRUNDAWAN PRIME WING ANA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

VRUNDAWAN PRIME WING A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Open Space41

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,822 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7623.93
Proposed, not sanctioned7,624 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRASIK PLAZA JAISTAMBH SQUARE AMRAVATI - 444601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLOKESH KADU
EngineerPANKAJ BAJAJ
Chartered AccountantCA DEEPAK ZAMBANI
PartnerRole in project
Vijay Nanakram Talda-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Feb 2023

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_2223_Vrundawan Prime.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Prime Form 2 (1).pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrundwan Prime.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prime Form 3.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Prime RERA 18-04-23.pdf25 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM4.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETIONPRIME.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrundawan Prime 31122022_compressed.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vrundawan Prime-200123.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: VRUNDAWAN PRIME 31122022.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: vrundawan prime(19-01-2022.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2 VRUNDAWAN PRIME.pdf15 Oct 2022
Disclosure of sold/ booked inventoryFile: V Prime Rera 30 09 2022.pdf15 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrundawan Prime.pdf14 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRIME.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Prime.pdf20 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vrundawan Prime.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrundawan Prime.pdf15 Jul 2022
Disclosure of sold/ booked inventoryFile: Vrundawan Prime 300622.pdf15 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vrundawan Prime.pdf15 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vrundawan Prime.pdf30 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrundawan Prime_compressed.pdf29 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrundawan Prime_compressed.pdf29 Apr 2022
Disclosure of sold/ booked inventoryFile: V Prime 31032022.pdf28 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vrundawan Prime.pdf28 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PRIME FORM 1.pdf15 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRIME FORM 2.pdf15 Jan 2022
Disclosure of sold/ booked inventoryFile: Vrundawan Prime.pdf13 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PRIME FORM 3.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf16 Oct 2021
Disclosure of sold/ booked inventoryFile: V Prime 30092021.pdf16 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Govinda.pdf16 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_compressed.pdf15 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Prime.pdf28 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VRUNDAWAN PRIME 30062021.pdf20 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VRUNDAWAN PRIME 30062021.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A VRUNDAWAN PRIME 30062021.pdf20 Aug 2021
Disclosure of sold/ booked inventoryFile: Vrundawan Prime.pdf20 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VRUNDAWAN PRIME.pdf20 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GOVINDAM.pdf15 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GOVINDAM.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A GOVINDAM.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: prime.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: F5 Vrundawan Prime 1920.pdf21 May 2021
Details of encumbrancesFile: V Prime Encumbrance certificate.pdf12 Feb 2021
PAN CardFile: VNT Pan Card.pdf23 Oct 2019
OtherFile: Prime_Flat List Detailed.pdf23 Oct 2019
Proforma of Allotment letterFile: Prime_Allotment Letter.pdf18 Oct 2019
OtherFile: Prime_Flat List Detailed.pdf18 Oct 2019
Layout approvalFile: Prime_Layout Map.pdf10 Oct 2019
Building plan approvalFile: Sept 2019 -010.pdf10 Oct 2019
Building plan approvalFile: Sept 2019 -012.pdf10 Oct 2019
Copy of the legal title reportFile: Prime_Search Report.pdf10 Oct 2019
Details of encumbrancesFile: Prime_EC.pdf10 Oct 2019
Copy of Layout Approval (in case of layout)File: Prime_Layout Map.pdf10 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Sept 2019 -010.pdf10 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Sept 2019 -012.pdf10 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: Prime Commencement Certificate.pdf10 Oct 2019
Declaration in FORM BFile: Prime_Form B.pdf10 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prime_Form 3.pdf10 Oct 2019
Proforma of Allotment letterFile: Prime_ATS.pdf10 Oct 2019
OtherFile: Prime_Flat List.pdf10 Oct 2019
OtherFile: Prime_Declaration.pdf10 Oct 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Govinda Residencymaloo and talda layout26CompletedJun 2016Late, Jul 2016

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is completed

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep VRUNDAWAN PRIME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAHATGAON450+ in Amravati

2 kmVRUNDAWAN PRIMECompleted 12Lapsed / revoked 4Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: Vijay Nanakram Talda

Vijay Nanakram Talda has 7 registrations on MahaRERA, including GOVINDA SKY and Vrundawan by Govinda Group. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if VRUNDAWAN PRIME is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRUNDAWAN PRIME?

The registered promoter entity is Vijay Nanakram Talda, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRUNDAWAN PRIME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRUNDAWAN PRIME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRUNDAWAN PRIME?

The professionals named in the filing: Architect: LOKESH KADU; Engineer: PANKAJ BAJAJ; Chartered Accountant: CA DEEPAK ZAMBANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRUNDAWAN PRIME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRUNDAWAN PRIME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRUNDAWAN PRIME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.