Home / Browse projects / Mumbai Suburban, Maharashtra / VRUNDAVAN SRA CHS LTD LOTUS TOWER

Registration lapsed No litigation declared Residential / Group Housing project

VRUNDAVAN SRA CHS LTD LOTUS TOWER

By SHREE VARADKRUPA TOWERS LLP

RG-MH-72112 · RERA P51800045859 · Last updated on MahaRERA portal: 21 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
4 of 11Construction stages donefurthest along: Stilt Floor, 90%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

VRUNDAVAN SRA CHS LTD LOTUS TOWER is a Residential / Group Housing project by SHREE VARADKRUPA TOWERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045859 on 15 Jun 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameVRUNDAVAN SRA CHS LTD LOTUS TOWER
  • TypeResidential / Group Housing
  • Location
    • RAM JOSHI ROAD
    • GHATKOPAR WEST BHATWADI
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800045859
  • ReraGenie IDRG-MH-72112

Builder

  • NameSHREE VARADKRUPA TOWERS LLP
  • Entity typePartnership
  • GSTIN27AEPFS8821L1Z7
  • PartnersGAURAV CHANDRAKANT THAKKAR, Kasturi Kanti Bhanushali

Key dates

7 months past promisethis monthRegisteredJun 2022First promiseMar 2024Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jun 2022
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2024)
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LOTUS TOWERNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

LOTUS TOWER: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered15
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area650 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI2700.0
Proposed, not sanctioned2,577 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAIKRUPA CHS, GHATKOPAR EAST, MUMBAI 400077

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SHREE VARADKRUPA TOWERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019306Mar 2024 → Mar 2026

Reason as filed by the promoterRequest for Extension of Building Completion date by 2 years to 31-03-2026  After receipt of IOA on 28-06-2021 residential structures were vacated after distributing rent. CC for the SRA project was received on 23-02-2022.  RERA filing was immediately undertaken on 15-06-2022.  Since a 10 storied building was to be constructed completion of the project was anticipated to be 31-03-2024.  For construction material to be taken inside the plot, all commercial occupants were required to accord consent and shift.  Commercial occupants had not consented since all shops could not be planned on th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: SVTLLP Sold unsold invevtory.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SVTLLP Form 2A Engg Certificate 31122024.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 SVTLLP Architect Rera Certificate 31122024.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 SVTLLP reconciled CA certificate.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 SVTLLP CA Certificate as on 311224.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVTLLP Engg certificate 31122024.pdf20 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SVTLLP Form 2A Engg Certificate 31122024.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold inventory for Rera.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGINEER CERTIFICATE FOR QUALITY ASSURANCE.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SVTLLP Architect Certificate 30092024.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SVTLLP CA Certificate 30092024_compressed.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVTLLP Engg Certificate 30092024.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SVTLLP FORM 5 31032024.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SVTLLP Architect Certificate 31032024.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVTLLP Engineer Certificate 31032024.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: SVTLLP Modified Form 29 31122023.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: SVTLLP Modified Form 29 31032024.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SVTLLP CA Certificate 31032024_compressed.pdf30 Apr 2024
Declaration in FORM BFile: SVTLLP FORM B Declaration 16042024.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: SVTLLP Circular 29 Sold Inventory 31032024.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SVTLLP FORM 5 CA Certificate.pdf17 Apr 2024
Details of encumbrances concerned to FinanceFile: SVTLLP No Encumbrances.pdf16 Apr 2024
Details of encumbrances concerned to LegalFile: SVTLLP No Encumbrances.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SVTLLP Engineers Quality Assurance 31122023.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 31122023.pdf16 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SVTLLP Third Party Interest.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 310323_comp.pdf1 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DocScanner 26 Mar 2024 4-12 pm (1).pdf1 Apr 2024
Building plan approvalFile: SVTLLP IOA 12022024.pdf26 Feb 2024
Building plan approvalFile: SVTLLP Plan Page 1 12022024.pdf26 Feb 2024
Building plan approvalFile: SVTLLP Plan Page 2 12022024.pdf26 Feb 2024
Building plan approvalFile: SVTLLP Plan Page 3 12022024.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTLLP IOA 12022024.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTLLP Plan Page 1 12022024.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTLLP Plan Page 2 12022024.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTLLP Plan Page 3 12022024.pdf26 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC of Vrundavan CHS.pdf26 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shree Varadkrupa Towers llp Report - 21-22_compressed.pdf26 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shree Varadkrupa LLP - 22-23_compressed.pdf26 Feb 2024
Building plan approvalFile: Amended IOA Covering Letter of Vrundavan CHS.pdf24 Jan 2024
Building plan approvalFile: SVTPL Page 1 Plan 08072023.pdf24 Jan 2024
Building plan approvalFile: SVTPL Page 2 Plan 08072023.pdf24 Jan 2024
Building plan approvalFile: SVTPL Page 3 Plan 08072023.pdf24 Jan 2024
Copy of the legal title reportFile: SVTPL to SVTLLP SRA Letter 21092023.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Covering Letter of Vrundavan CHS.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTPL Page 1 Plan 08072023.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTPL Page 2 Plan 08072023.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: SVTPL Page 3 Plan 08072023.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC 2nd page Vrundavan CHS.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SVTLLP Arch Certificate 31122023.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVTLLP Engineers Certificate 31122023.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SVTPL Architect certificate 31032023.pdf9 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SVTPL Architect certificate 31032023.pdf9 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVTPL Engg Certificate 31032023.pdf9 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVTPL Engg Certificate 31032023.pdf9 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera certificate -compressed.pdf9 Sep 2023
Copy of the legal title reportFile: Comp SVTLLP Title Report.pdf9 Jun 2022
Copy of the legal title reportFile: ROC extract of Pvt Ltd.pdf9 Jun 2022
Copy of the legal title reportFile: ROC extract of LLP.pdf9 Jun 2022
Declaration in FORM BFile: SVTLLP RERA Notarized Form B.pdf9 Jun 2022
Proforma of Allotment letterFile: SVTLLP RERA Agreement for Sale Draft.pdf9 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate for RERA uploaded RERA.pdf1 Jun 2022
Layout approvalFile: SVTLLP RERA Layout declaration.pdf24 May 2022
Copy of Layout Approval (in case of layout)File: SVTLLP RERA Layout declaration.pdf24 May 2022
Details of encumbrancesFile: SVTLLP RERA Declaration on Encumbrances.pdf23 May 2022
Declaration about Commencement CertificateFile: SVTLLP RERA CC Declaration.pdf23 May 2022
CERSAI detailsFile: SVTLLP RERA CERSAI Declaration.pdf23 May 2022
Building plan approvalFile: SVTPL Plan - Final_compressed Page 1.pdf26 Mar 2022
Building plan approvalFile: SVTPL Plan - Final_compressed Page 2.pdf26 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: SVTPL Plan - Final_compressed Page 1.pdf26 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: SVTPL Plan - Final_compressed Page 2.pdf26 Mar 2022
Building plan approvalFile: RERA IOA SVTPL.pdf10 Mar 2022
PAN CardFile: SVTPL PAN Card.pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: RERA IOA SVTPL.pdf10 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC SVTPL.pdf10 Mar 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRUNDAVAN SRA CHS LTD LOTUS TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR WEST BHATWADI6,700+ in Mumbai Suburban

2 kmVRUNDAVAN SRA CHS LTD LOCompleted 83Lapsed / revoked 55Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 218 registered projects within 2 km.

Builder: SHREE VARADKRUPA TOWERS LLP

SHREE VARADKRUPA TOWERS LLP has 1 registration on MahaRERA, including VRUNDAVAN SRA CHS LTD LOTUS TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that VRUNDAVAN SRA CHS LTD LOTUS TOWER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VRUNDAVAN SRA CHS LTD LOTUS TOWER is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRUNDAVAN SRA CHS LTD LOTUS TOWER?

The registered promoter entity is SHREE VARADKRUPA TOWERS LLP, a partnership as per the filing. Its GSTIN 27AEPFS8821L1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRUNDAVAN SRA CHS LTD LOTUS TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRUNDAVAN SRA CHS LTD LOTUS TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in VRUNDAVAN SRA CHS LTD LOTUS TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRUNDAVAN SRA CHS LTD LOTUS TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRUNDAVAN SRA CHS LTD LOTUS TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.