Home / Browse projects / Kolhapur, Maharashtra / Vrundavan Co-Op Housing Society Ltd.

Registered No litigation declared Residential / Group Housing project

Vrundavan Co-Op Housing Society Ltd.

By Swapnaprabha Realtors LLP

RG-MH-19489 · RERA P53000077780 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 80%
22 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Vrundavan Co-Op Housing Society Ltd. is a Residential / Group Housing project by Swapnaprabha Realtors LLP in Kolhapur, Maharashtra, registered with MahaRERA as P53000077780 on 29 Oct 2024. Possession is promised by 31 Mar 2030. 3 of the 25 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameVrundavan Co-Op Housing Society Ltd.
  • TypeResidential / Group Housing
  • Location
    • GC Chandwani Path
    • Plot No. 30
    • Tarabai Park
    • Kolhapur
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000077780
  • ReraGenie IDRG-MH-19489

Builder

  • NameSwapnaprabha Realtors LLP
  • Entity typePartnership
  • GSTIN27AFCFS2866P1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2024PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Oct 2024
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

12%3 of 25 units booked
65.5%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vrundavan Co-Op Housing SocietyNA9725025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

Vrundavan Co-Op Housing Society: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered92

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,021 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jun 2026
LandownerVillageDistrict
Vrundavan Co-Op Housing SocietyKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI3357.05
Proposed, not sanctioned2,982 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FL OFFICE NO1A FRONT SIDE RS NO 250B27B NEAR RAJHANS PRINTING PRESS NAGALA KOLHAPUR 416003
Estimated costRs 7.08 cr
Cost incurredRs 4.64 cr
Work done65.49%
BuildingWingEstimatedIncurred
Vrundavan Co-Op Housing SocietyNARs 6.50 crRs 4.25 cr
-NARs 58.50 lakhRs 39.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAVIN APPASAHEB PATIL
EngineerSACHIN DHONDO PARANJPE
Chartered AccountantABHAY MADHUKAR GOLWALKAR
PartnerRole in project
Swapnaprabha Realtors LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4 ARCHITECTS CERTIFICATE for upload.PDF29 Jun 2026
Withdrawal Update Form 1File: Q4 ARCHITECTS CERTIFICATE for upload.PDF29 Jun 2026
Withdrawal Update Form 2File: Q4 ENGINEERS CERTIFICATE for upload.PDF29 Jun 2026
Withdrawal Update Form 2File: Q4 ENGINEERS CERTIFICATE for upload.PDF29 Jun 2026
Withdrawal Update Form 3File: Q4 CA CERTIFICATE for upload.PDF29 Jun 2026
Withdrawal Update Form 3File: Q4 CA CERTIFICATE for upload.PDF29 Jun 2026
Withdrawal Update Form 1File: Vrundavan Architects Certifcate 31 Dec 2025.PDF2 Mar 2026
Withdrawal Update Form 2File: Vrundavan Engineers Certificate 31 Dec 2025.PDF2 Mar 2026
Withdrawal Update Form 3File: Vrundavan Revised CAs CERTIFICATE 02 March 2026.PDF2 Mar 2026
Withdrawal Update Form 1File: ARCH JUNE CERTIFICATE VRUNDAVAN 22 DEC 25.PDF15 Jan 2026
Withdrawal Update Form 1File: ARCH SEPT CERTIFICATE VRUNDAVAN 23 DEC 25.PDF15 Jan 2026
Withdrawal Update Form 2File: ENGG JUNEE CERTIFICATE VRUNDAVAN 23 DEC 25.PDF15 Jan 2026
Withdrawal Update Form 2File: ENGG SEPTT CERTIFICATE VRUNDAVAN 22 DEC 25.PDF15 Jan 2026
Withdrawal Update Form 3File: CA JUNE CERTIFICATE VRUNDAVAN 22 DEC 25.PDF15 Jan 2026
Withdrawal Update Form 3File: CA SEPT CERTIFICATE VRUNDAVAN 23 DEC 25.PDF15 Jan 2026
Form 1File: 01 Vrundavan Architect Certificate 31-12-2024.pdf28 Aug 2025
Form 2File: 02 Vrundavan Engineers Certificate 31-12-2024.PDF28 Aug 2025
Form 3File: 03 CA Certificate 31-12-2024.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Vrundavan Sold Unsold Dec 2024.pdf28 Aug 2025
Form 1File: Vrundavan Q4 Arch Cert.pdf28 Aug 2025
Form 2File: Vrundavan Q4 Engg Cert.pdf28 Aug 2025
Form 3File: Vrundavan Q4 CA Cert.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Vrundavan Sold Unsold Q4 Cert.pdf28 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01A Vrundavan Architect Certificate 31-12-2024.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 CA Certificate 31-12-2024.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Vrundavan Engineers Certificate 31-12-2024.PDF11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01A Vrundavan Architect Certificate 31-12-2024.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 CA Certificate 31-12-2024.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Vrundavan Engineers Certificate 31-12-2024.PDF11 Feb 2025
Other - TechnicalFile: CREDAI RERA Membership Certificate.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SKP other interest disclosure.pdf16 Oct 2024
Other - TechnicalFile: Authority Letter RERA New.pdf11 Oct 2024
Other - TechnicalFile: Email from ADTP to Rera.pdf11 Oct 2024
Other - FinanceFile: Letter to bank for opening rera account.pdf10 Oct 2024
Other - FinanceFile: letter to bank in bank format.pdf10 Oct 2024
Other - TechnicalFile: Annexure A Declaration.pdf9 Oct 2024
Other - TechnicalFile: Oct Annexure A No Duplication Declaration.pdf8 Oct 2024
Proforma of Allotment letterFile: 11 Model Allottment Letter Vrundavan.pdf7 Oct 2024
Other - LegalFile: Authority Letter RERA New.pdf7 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Oct Format A Bank Declaration (1).pdf7 Oct 2024
Deviation Report with respect to Allotment letterFile: Oct No Deviation Allottment.pdf7 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Oct No Deviation Agreement to Sale.pdf7 Oct 2024
Proforma of Agreement for saleFile: 18 Model Draft of Agreement to Sale October.pdf7 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Oct New Form B Bank Letter.pdf7 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Loan Declaration.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Vrundavan Commencement single page.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Oct New Revised.pdf7 Jun 2024
Other - LegalFile: Vrundavan Registrar Appointment Order.pdf7 Jun 2024
Other - LegalFile: PRCard.pdf7 Jun 2024
Other - LegalFile: Vrundavan Registrar Appointment Letter.pdf7 Jun 2024
Declaration in FORM BFile: Oct Society Bank Account Declaration.pdf6 Jun 2024
Copy of the legal title reportFile: New Oct Search Report Rera Format.pdf5 Jun 2024
Details of encumbrances concerned to FinanceFile: Oct No Loan Declaration.pdf4 Jun 2024
Declaration in FORM BFile: new form b promoter affidavit.pdf4 Jun 2024
CERSAI detailsFile: CERSAI Asset Based Search.pdf4 Jun 2024
CERSAI detailsFile: Oct Cersai Declaration.pdf4 Jun 2024
Details of encumbrances concerned to LegalFile: Oct No Loan Declaration.pdf4 Jun 2024
Layout approvalFile: Vrundavan Sanction plan without TDR 2024 - 3 mb.pdf3 Jun 2024
Copy of Layout Approval (in case of layout)File: Vrundavan Sanction plan without TDR 2024 - 3 mb.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oct Arch Cert.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Oct Engg Cert.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: Revised Sold Unsold Inventory Oct.pdf3 Jun 2024
Declaration about Commencement CertificateFile: Oct Commencement Declaration.pdf3 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SDP other intrest disclosure.pdf3 Jun 2024
Building plan approvalFile: Vrundavan Sanction plan without TDR 2024 - 3 mb.pdf27 May 2024
PAN CardFile: Swapnaprabha PAN Card.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Vrundavan Sanction plan without TDR 2024 - 3 mb.pdf27 May 2024

How this compares with Kolhapur

12%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Vrundavan Co-Op Housing Society Ltd. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Plot No. 30, Tarabai Park, Kolhapur880+ in Kolhapur

2 kmVrundavan Co-Op Housing Completed 59Lapsed / revoked 31Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 156 registered projects within 2 km.

Builder: Swapnaprabha Realtors LLP

Swapnaprabha Realtors LLP has 2 registrations on MahaRERA, including Vrundavan Co-Op Housing Society Ltd. and Shree Datta Apartment Condominium. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Vrundavan Co-Op Housing Society Ltd. is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vrundavan Co-Op Housing Society Ltd.?

The registered promoter entity is Swapnaprabha Realtors LLP, a partnership as per the filing. Its GSTIN 27AFCFS2866P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vrundavan Co-Op Housing Society Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vrundavan Co-Op Housing Society Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vrundavan Co-Op Housing Society Ltd.?

The professionals named in the filing: Architect: PRAVIN APPASAHEB PATIL; Engineer: SACHIN DHONDO PARANJPE; Chartered Accountant: ABHAY MADHUKAR GOLWALKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vrundavan Co-Op Housing Society Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vrundavan Co-Op Housing Society Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vrundavan Co-Op Housing Society Ltd. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.