Home / Browse projects / Satara, Maharashtra / VRUNDAVAN CITY PHASE-2A

Completed No litigation declared Residential / Group Housing project

VRUNDAVAN CITY PHASE-2A

By Kalyani Associates

RG-MH-57910 · RERA P52700054596 · Last updated on MahaRERA portal: 5 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

VRUNDAVAN CITY PHASE-2A is a Residential / Group Housing project by Kalyani Associates in Satara, Maharashtra, registered with MahaRERA as P52700054596 on 31 Jan 2024. The registration is recorded completed; possession was promised by 1 May 2026.

At a glance

Project

  • NameVRUNDAVAN CITY PHASE-2A
  • TypeResidential / Group Housing
  • Location
    • KARAD DHEBEWADI ROAD
    • AGASHIVNAGAR
    • Malkapur (NP)
    • Karad
    • Satara
    • 415539
  • Pincode415539
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700054596
  • ReraGenie IDRG-MH-57910

Builder

  • NameKalyani Associates
  • Entity typePartnership
  • GSTIN27AAWFK4891M1Z8
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersPoonam Sandip Patil, Shekhar Sampatrao Shinde, Sampatrao Dnyanu Shinde
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2024PromisedMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jan 2024
  • Promised completion1 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABOLINA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

ABOLI: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,746 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
SHEKHAR SAMAPTRAO SHINDEThane (M Corp.)Thane
SIMA MARUTI CHAVANMalkapur (NP)Satara
PRATIK MARUTI CHAVANMalkapur (NP)Satara
PRANIT MARUTI CHAVANMalkapur (NP)Satara

Approvals and building plan

Permissible FSI3960.54
Proposed, not sanctioned3,961 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYESHWANT HSG STY PLOT NO 7 PUNE BANGLORE ROAD MALKAPUR PHATA MALKAPUR TAL KARAD DIST SATARA 415539

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTejal v Suryawanshi
EngineerMr Partap Mohite
EngineerEr Rohan pavaskar
Chartered AccountantAnand Chandak
PartnerRole in project
Kalyani Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Mar 2025

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH 2A - AR CERTIFICATE 15-4-25.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE2A CA CERTIFICATE FORM 3 15-4-25.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH 2A ER CERTIFICATE.pdf5 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PHASE -2A FINAL OCCUPANCY CERTIFICATE-.pdf23 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1) 15-10-24.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE-2A - CA CERTIFICATES-16-10-2024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KA- PHASE-2A - ENGINEER CERTIFICATE -15-10-2024 (1).pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ENGINEER CERTIFICATE FORM 2 APRIL 2024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 - CA CERTIFICATES-20-7-2024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 CA CERTIFICATE APRIL 2024.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 APRIL 2024.pdf2 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2 APRIL 2024.pdf2 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM -5.pdf2 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Accounts for real estate projects.pdf2 Jul 2024
Other - FinanceFile: ANNEXURE A.pdf2 Jul 2024
Other - FinanceFile: DECLARATION REGARDING CHANGE OF RERA BANK ACCOUNT DETAILS.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf22 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A- DECLARATION ABOUT SEPERATE BANK ACC FOR REAL ESTATE PROJECT_0001.pdf21 Mar 2024
Other - FinanceFile: NOTARIZED ANNEXURE A-DECLARATION CUM UNDERTAKING_0001.pdf21 Mar 2024
Other - FinanceFile: DECLARATION REGARDING CHANGE OF RERA BANK ACC DETAILS_0001.pdf21 Mar 2024
Other - FinanceFile: KALYANI ASOCIATE VRUNDAVAN CITY P2A MC.pdf21 Mar 2024
Other - FinanceFile: HDFC DECLARATION.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: (Form 3).pdf25 Jan 2024
Other - LegalFile: Declearation Regarding Survey No.pdf8 Jan 2024
Copy of the legal title reportFile: search report - aboli update 04-01-2024.pdf4 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC VERIFICATION - DESIGNATED EMAIL ID.pdf18 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC VERIFICATION - EMAIL MP.pdf18 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o14 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Declaration OF Commencement Certificate.pdf6 Dec 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf22 Nov 2023
CERSAI detailsFile: UNDERTAKING OF NO CERSAI REPORT (1).pdf21 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organizations (2).pdf21 Nov 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (1).pdf21 Nov 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf9 Nov 2023
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal.pdf9 Nov 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf9 Nov 2023
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf9 Nov 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf7 Nov 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf7 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf24 May 2023
Building plan approvalFile: Building Plan Approval -2.pdf22 May 2023
Building plan approvalFile: Building Plan Approval - 3.pdf22 May 2023
Building plan approvalFile: Building Plan Approval -1.pdf22 May 2023
Layout approvalFile: Copy of Layout Approval.pdf22 May 2023
Building plan approvalFile: एकत्रीकरण व रेखांकन - नकाशा_compressed.pdf22 May 2023
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf22 May 2023
Building Plan Approval / NA Order for plotted developmentFile: एकत्रीकरण व रेखांकन - नकाशा_compressed.pdf22 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval -1.pdf22 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval -2.pdf22 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval - 3.pdf22 May 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION.pdf22 May 2023
Declaration in FORM BFile: Declaration in FORM B.pdf22 May 2023
Other - LegalFile: LEGAL.pdf22 May 2023
PAN CardFile: KLAYANI ASSOCIATES, PAN CRAD - Copy.pdf13 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KALYANI BUILDCON- VRUNDAVAN CITY 01KARAD4CompletedMar 2022Late, Mar 2023

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep VRUNDAVAN CITY PHASE-2A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGASHIVNAGAR1,100+ in Satara

2 kmVRUNDAVAN CITY PHASE-2ACompleted 13Lapsed / revoked 14Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: Kalyani Associates

Kalyani Associates has 3 registrations on MahaRERA, including Vrundavan City - 2 and VRUNDAVAN CITY PHASE-2A. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if VRUNDAVAN CITY PHASE-2A is delayed beyond 1 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRUNDAVAN CITY PHASE-2A?

The registered promoter entity is Kalyani Associates, a partnership as per the filing. Its GSTIN 27AAWFK4891M1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRUNDAVAN CITY PHASE-2A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRUNDAVAN CITY PHASE-2A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRUNDAVAN CITY PHASE-2A?

The professionals named in the filing: Architect: Tejal v Suryawanshi; Engineer: Mr Partap Mohite; Engineer: Er Rohan pavaskar; Chartered Accountant: Anand Chandak. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRUNDAVAN CITY PHASE-2A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRUNDAVAN CITY PHASE-2A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRUNDAVAN CITY PHASE-2A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.