Home / Browse projects / Pune, Maharashtra / VRINDAVAN

Registration lapsed No litigation declared Residential / Group Housing project

VRINDAVAN

By PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED

RG-MH-04850 · RERA P52100020791 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
4 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

VRINDAVAN is a Residential / Group Housing project by PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100020791 on 9 May 2019. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameVRINDAVAN
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 36/2B/1
    • CTS NO 1611
    • RAHATANI
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • RERA no.P52100020791
  • ReraGenie IDRG-MH-04850

Builder

  • NamePRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200PN2012PTC143632
  • Managing DirectorsSACHIN BAJIRAO CHINCHWADE, DINESH SOPAN SHEDGE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredMay 2019First promiseDec 2021Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 May 2019
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRINDAVAN B WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

VRINDAVAN B WING: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area720 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
TRUPTI ANIL BHISEPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI720.39
Proposed, not sanctioned720 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI CHINCHWAD PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP DANGE
PartnerRole in project
PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017969Dec 2021 → Jun 2026

Reason as filed by the promoterProposed Extended Date of Completion

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Vrindavan - Qtr 4 2025-26.pdf21 May 2026
Form 2File: form 2.pdf21 May 2026
Form 3File: Vrindavan Form 3.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory Vrindavan.pdf21 May 2026
Form 1File: Form 1 Vrindavan.pdf20 Jan 2026
Form 2File: Form 2 Vrindavan.pdf20 Jan 2026
Form 3File: form 3.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD VRINDAVAN.pdf20 Jan 2026
Form 1File: Form 1 Vrindavan Qtr 2 2025.pdf25 Dec 2025
Form 2File: Form 2 Vrindavan Sep 2025.pdf25 Dec 2025
Form 3File: Sky One Form 3 Qtr 2 2025.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Qtr2-2025 Vrindavan.pdf25 Dec 2025
Form 1File: Form 1 Vrindavan June 2025.pdf22 Jul 2025
Form 2File: Form 2 Vrindavan June 2025.pdf22 Jul 2025
Form 3File: Form 3 Vrindavan June 2025.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Vrindavan Sold Unsold Inventory June 2025.pdf22 Jul 2025
Layout approvalFile: plan 1.pdf11 Aug 2024
Copy of Layout Approval (in case of layout)File: plan 1.pdf11 Aug 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate-Vrindavan.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- 2023-2024 Vrindavan.pdf10 Aug 2024
CERSAI detailsFile: Cersai Declaration- Vrindavan.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dinesh Shedge- Disclosure of Interest in other real estate.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sachin Chinchwade-Disclosure of Interest in other real estate.pdf10 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration About Separate Bank Account-Vrindavan.pdf10 Aug 2024
Other - TechnicalFile: Annexure-A Declaration Cum Undertaking Vrindavan.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vrindavan 30062024.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 30062024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Vrindavan.pdf16 Jul 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan 30062024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Vrindavan (4).pdf5 Jun 2024
Certificates of CA (Form 3)File: Vrindavan Form 3 r1 31032024.pdf5 Jun 2024
Declaration in FORM BFile: Form B vrindavan.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Unsold Inventory -Vrindavan (1)_page-0001_page-0001_page-0001_page-000111 Apr 2024
Certificates of CA (Form 3)File: Revised Vrindavan Form 3-Q3 (1)_page-0001.pdf11 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 31032022.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 31062022.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 31122022.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 31032023.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 31062023.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan 31092023.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)_page-0001.pdf8 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Unsold Inventory -Vrindavan (1).pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vrindavan - Architect certificate form 1.pdf13 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vrindavan.pdf13 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Vrindavan.pdf13 Jan 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan (CA Certificate).pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 Vrindavan.pdf13 Jan 2024
Building plan approvalFile: Building Plan Approval.pdf7 May 2019
Layout approvalFile: Layout.pdf7 May 2019
Building plan approvalFile: Temp00035.pdf7 May 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf7 May 2019
Building Plan Approval (IOD)File: Building Plan Approval.pdf7 May 2019
Building Plan Approval (IOD)File: Temp00035.pdf7 May 2019
Certificates of CA (Form 3)File: CA Certificate_compressed.pdf26 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2__Engineer_s_Certificate_.pdf24 Apr 2019
Copy of the legal title reportFile: Tital Search Report.pdf13 Apr 2019
Details of encumbrancesFile: letter.pdf13 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf13 Apr 2019
Proforma of Allotment letterFile: Draft Agreement Rahatni.pdf13 Apr 2019
Declaration in FORM BFile: form -b Devoloper_compressed.pdf12 Apr 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 54 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAHATANI13,700+ in Pune

Builder: PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED

PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED has 2 registrations on MahaRERA, including PRITHIVI SHOURYA SKY ONE and VRINDAVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that VRINDAVAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VRINDAVAN is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN?

The registered promoter entity is PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED, a company as per the filing. Its CIN U45200PN2012PTC143632 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN?

The professionals named in the filing: Architect: SANDEEP DANGE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.