ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / VRINDAVAN ESTATE PREMIUM

Registered No litigation declared Residential / Group Housing project

VRINDAVAN ESTATE PREMIUM

By BVN CONSTRO VENTURES LLP

RG-MH-31469 · RERA P50500079804 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 25%
140 of 220Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

VRINDAVAN ESTATE PREMIUM is a Residential / Group Housing project by BVN CONSTRO VENTURES LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500079804 on 26 Mar 2025. Possession is promised by 9 Mar 2030. 80 of the 220 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameVRINDAVAN ESTATE PREMIUM
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 01
    • KHASRA NO 169/1/B
    • 169/3 & 169/4
    • MAUZA PIPLA
    • TEHSIL & DISTRICT NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440034
  • Pincode440034
  • RERA no.P50500079804
  • ReraGenie IDRG-MH-31469

Builder

  • NameBVN CONSTRO VENTURES LLP
  • Entity typePartnership
  • GSTIN27ABBFB1120A1ZH
  • PartnersPARAG ANANTRAO SARAF, BHARAT SWAROOPCHAND CHAWARE, AKASH VITTHALRAO BHEDE, KAMLESH SAMPATRAO BHEDE, SANKET SUNIL BHEDE, ROHAN RAMESHRAO BHEDE
  • Other registrations2 more →

Key dates

this monthRegisteredMar 2025PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Mar 2025
  • Promised completion9 Mar 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Current status

36%80 of 220 units booked
2.8%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA19191100110
WING DNA19191100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 25%.

WING A11%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth25%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D11%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth25%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed439

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots439
Closed/Covered2
Open Space437
BuildingClosed/CoveredOpen SpaceTotal
WING A1218219
WING D1219220

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area18,753 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 May 2025

Approvals and building plan

Sanctioning authorityTown PLanning Department, Nagar Panchaya Besa-Pipla
Permissible FSI30067.79
Proposed, not sanctioned30,068 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEV NAGAR CHOWK
Estimated costRs 61.51 cr
Cost incurredRs 1.69 cr
Work done2.75%
BuildingWingEstimatedIncurred
WING ANARs 30.75 crRs 84.65 lakh
WING DNARs 30.75 crRs 84.65 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARAG KOTWAL EKVEERA ARCHITECTS
EngineerSATISH RAIPURE VIGHNAHARTA CONSULTING ENGINEER
Chartered AccountantRANJEET MISHRA
PartnerRole in project
BVN CONSTRO VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 9 Mar 2030

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate Vrindavan Estate Premium March 2026.pdf21 May 2026
Form 2File: Enggineer Certificate Vrindavan Estate Premium March 2026.pdf21 May 2026
Form 3File: CA Certificate Vrindavan Estate Premium March 2026.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Details of Sold Unsold Inventory Vrindavan Estate Premium March 2026.pdf21 May 2026
Form 1File: Architect Certificate Vrindavan Estate Premium December 2025.pdf25 Apr 2026
Form 3File: C A Certificate Vrindavan Estate Premium December 2025.pdf25 Apr 2026
Form 2File: Engineer Certificate Vrindavan Estate Premium December 2025.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOld Unsold Inventory December 2025.pdf25 Apr 2026
Form 1File: VE P ARCH CERTIFICATE 30SEP25.pdf22 Dec 2025
Form 2File: VE P ENG CERTIFICATE 30SEP25.pdf22 Dec 2025
Form 3File: VE P CA CERTIFICATE 30SEP25.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf22 Dec 2025
Withdrawal Update Form 1File: V E PREMIMUM Architect Certificate June 2025.pdf26 Aug 2025
Withdrawal Update Form 2File: V E PREMIUM Engineer Certificate June 25.pdf26 Aug 2025
Withdrawal Update Form 3File: V E PREMIUM Chartered Accountant Certificate June 2025.pdf26 Aug 2025
Form 1File: Architect Certificate VEP 31 march 2025.pdf19 May 2025
Form 2File: Engineer Certificate VEP 31 March 2025.pdf19 May 2025
Form 3File: CA certificate VEP 31 March 2025.pdf19 May 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory VEP 31 march 2025.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate VEP 31 march 2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate VEP 31 March 2025.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VEP 31 March 2025.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold inventory VEP 31 march 2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate updated.pdf21 Mar 2025
Building plan approvalFile: 01-compressed.pdf19 Mar 2025
Building plan approvalFile: 02.pdf19 Mar 2025
Building plan approvalFile: 03.pdf19 Mar 2025
Building plan approvalFile: 04.pdf19 Mar 2025
Building plan approvalFile: 05.pdf19 Mar 2025
Building plan approvalFile: 06.pdf19 Mar 2025
Building plan approvalFile: 07.pdf19 Mar 2025
Building plan approvalFile: 08.pdf19 Mar 2025
Building plan approvalFile: 09.pdf19 Mar 2025
Building plan approvalFile: 10.pdf19 Mar 2025
Building plan approvalFile: 11.pdf19 Mar 2025
Building plan approvalFile: 12.pdf19 Mar 2025
Building plan approvalFile: 13.pdf19 Mar 2025
Details of encumbrances concerned to FinanceFile: Encumbrance and Litigation.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 09.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 08.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 06.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 05.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 04.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 03.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 02.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 01-compressed.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 07.pdf19 Mar 2025
Other - LegalFile: Mail from Sanctioning Authorities.pdf19 Mar 2025
Other - LegalFile: 7-12 169-1-B.pdf19 Mar 2025
Other - LegalFile: 7-12 169-3.pdf19 Mar 2025
Other - LegalFile: 7-12 169-4.pdf19 Mar 2025
Other - LegalFile: BHEDE SALE DEED MOUZA - PIPLA.pdf19 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrance and Litigation.pdf19 Mar 2025
Other - TechnicalFile: Declaration cum undertaking.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Kamlesh Bhede.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Akash Bhede.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Bharat Chaware.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Parag Saraf.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rohan Bhede.pdf19 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sanket Bhede.pdf19 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form B opening RERA designated bank account.pdf19 Mar 2025
Layout approvalFile: Commencement Certificate.pdf12 Mar 2025
PAN CardFile: PAN Card.pdf12 Mar 2025
Copy of the legal title reportFile: Title Search Report.pdf12 Mar 2025
Details of encumbrances concerned to FinanceFile: Undertaking for Financial Encumbrance.pdf12 Mar 2025
Copy of Layout Approval (in case of layout)File: Commencement Certificate.pdf12 Mar 2025
Proforma of Allotment letterFile: Format of Allotment Letter.pdf12 Mar 2025
Declaration in FORM BFile: Affadavit in Form.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf12 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Mar 2025
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf12 Mar 2025
CERSAI detailsFile: Undertaking CRESAI.pdf12 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A for Bank.pdf12 Mar 2025
Deviation Report with respect to Allotment letterFile: No Deviation Report for Allotment Letter.pdf12 Mar 2025
Details of encumbrances concerned to LegalFile: Undertaking for Financial Encumbrance.pdf12 Mar 2025

How this compares with Nagpur

36%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN ESTATE PREMIUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAUZA PIPLA, TEHSIL & DISTRICT NAGPUR2,800+ in Nagpur

Builder: BVN CONSTRO VENTURES LLP

BVN CONSTRO VENTURES LLP has 3 registrations on MahaRERA, including VRINDAVAN ESTATE and VRINDAVAN ESTATE PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if VRINDAVAN ESTATE PREMIUM is delayed beyond 9 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN ESTATE PREMIUM?

The registered promoter entity is BVN CONSTRO VENTURES LLP, a partnership as per the filing. Its GSTIN 27ABBFB1120A1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN ESTATE PREMIUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN ESTATE PREMIUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN ESTATE PREMIUM?

The professionals named in the filing: Architect: PARAG KOTWAL EKVEERA ARCHITECTS; Engineer: SATISH RAIPURE VIGHNAHARTA CONSULTING ENGINEER; Chartered Accountant: RANJEET MISHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN ESTATE PREMIUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN ESTATE PREMIUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN ESTATE PREMIUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.