Home / Browse projects / Nagpur, Maharashtra / VRINDAVAN ESTATE PHASE II

Registered No litigation declared Residential / Group Housing project

VRINDAVAN ESTATE PHASE II

By BVN CONSTRO VENTURES LLP

RG-MH-82525 · RERA P50500053404 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 80%
8 of 176Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

VRINDAVAN ESTATE PHASE II is a Residential / Group Housing project by BVN CONSTRO VENTURES LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500053404 on 31 Oct 2023. Possession is promised by 5 Oct 2028. 168 of the 176 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameVRINDAVAN ESTATE PHASE II
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 01
    • KHASRA NO 168/2
    • P H NO 38
    • MOUZA PIPLA
    • TEHSIL & DISTRICT NAGPUR
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053404
  • ReraGenie IDRG-MH-82525

Builder

  • NameBVN CONSTRO VENTURES LLP
  • Entity typePartnership
  • GSTIN27ABBFB1120A1ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersPARAG ANANTRAO SARAF, BHARAT SWAROOPCHAND CHAWARE, AKASH VITTHALRAO BHEDE, KAMLESH SAMPATRAO BHEDE, SANKET SUNIL BHEDE, ROHAN RAMESHRAO BHEDE
  • Other registrations2 more →

Key dates

this monthRegisteredOct 2023PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2023
  • Promised completion5 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Current status

95%168 of 176 units booked
51.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRINDAVAN ESTATE PHASE IINA12121760176

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 80%.

VRINDAVAN ESTATE PHASE II: 23% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed222

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots222
Open Space222

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,115 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Aug 2025

Approvals and building plan

Sanctioning authorityTown PLanning Department, Nagar Panchaya Besa-Pipla
Permissible FSI13740.62
Proposed, not sanctioned13,741 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEO NAGAR SQUARE, NAGPUR 440 015
Estimated costRs 25.06 cr
Cost incurredRs 12.77 cr
Work done50.97%
BuildingWingEstimatedIncurred
VRINDAVAN ESTATE PHASE IINARs 25.06 crRs 12.77 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEKVEERA ARCHITECTS
EngineerSATISH RAIPURE
Chartered AccountantRANJEET MISHRA & COMPANY
PartnerRole in project
BVN CONSTRO VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Oct 2028

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate March 2026 Vrindavan Phase II.pdf21 May 2026
Form 2File: Enggineer Certificate March 2026 Phase II.pdf21 May 2026
Form 3File: CA Certificate march 2026 Vrindavan Phase II.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Details of Sold Unsold Inventory Vrindavan Phase II.pdf21 May 2026
Form 1File: Architect Certificate Vrindavan Estate Phase II December 2025.pdf6 Apr 2026
Form 2File: Engineer Certificate Vrindavan Estate Phase II December 2025.pdf6 Apr 2026
Form 3File: C A Certificate Vrindavan Estate Phase II December 2025.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: Details of Sold Unsold Inventory December 2025.pdf6 Apr 2026
Form 1File: VE P ARCH CERTIFICATE 30SEP25.pdf22 Dec 2025
Form 2File: VE P ENG CERTIFICATE 30SEP25.pdf22 Dec 2025
Form 3File: VE P CA CERTIFICATE 30SEP25.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf22 Dec 2025
Form 1File: Architect Certificate VE 2 31 March 2025.pdf19 Aug 2025
Form 2File: Engineer Certificate VE 2 31 March 2025.pdf19 Aug 2025
Form 3File: CA Certificate VE 2 31 March 2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory VE 2 31 march 2025.pdf19 Aug 2025
Form 1File: Architect Certificate VE 2 Dec 2024.pdf19 Aug 2025
Form 2File: Engineer Certificate.pdf19 Aug 2025
Form 3File: CA Certificate VE 2 dec 2024.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold book VE 2 dec 2024.pdf19 Aug 2025
Form 1File: Arcitect 30 sept 24.pdf19 Aug 2025
Form 2File: Engineer 30 sept 24.pdf19 Aug 2025
Form 3File: CA 30 sept 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Details About Sold Unsold Inventory September 2024 .pdf19 Aug 2025
Form 1File: Arcitect June 24.pdf19 Aug 2025
Form 2File: Engineer June 24.pdf19 Aug 2025
Form 3File: CA June 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Details About Sold Unsold Inventory June 2024 .pdf19 Aug 2025
Form 1File: Arcitech 31 March 24.pdf19 Aug 2025
Form 2File: Engineer 31 st March 2024.pdf19 Aug 2025
Form 3File: CA 31 March 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Details About Sold Unsold Inventory March 2024 .pdf19 Aug 2025
Form 1File: Arcitech December 2023.pdf19 Aug 2025
Form 2File: Engineer Certificate December 2023.pdf19 Aug 2025
Form 3File: CA December 2023.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Details About Sold Unsold Inventory December 2023.pdf19 Aug 2025
Withdrawal Update Form 1File: V E II Arechitect Certificate June 2025.pdf19 Aug 2025
Withdrawal Update Form 2File: V E II Engineer Certificate June 2025.pdf19 Aug 2025
Withdrawal Update Form 3File: V E II CA CERTIFICATE June 2025.pdf19 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate VE 2 31 March 2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate VE 2 31 March 2025_compressed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VE 2 31 March 2025.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold inventory VE 2 31 march 2025.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate VE 2 Dec 2024.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate VE 2 dec 2024.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold book VE 2 dec 2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitech December 2023.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitech 31 March 24.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitect June 24.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitect 30 sept 24.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA December 2023.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 31 March 24.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA June 24.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 30 sept 24.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate December 2023.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 31 st March 2024.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer June 24.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 30 sept 24.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Details About Sold Unsold Inventory December 2023.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Details About Sold Unsold Inventory March 2024 .pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Details About Sold Unsold Inventory June 2024 .pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Details About Sold Unsold Inventory September 2024 .pdf28 Oct 2024
Other - TechnicalFile: Mahareramail.pdf25 Oct 2023
Proforma of Agreement for saleFile: Updated Format of Agreement to Sale.pdf18 Oct 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation for Model Copy of Agreement to Sale.pdf18 Oct 2023
Declaration about Commencement CertificateFile: Updated Format D.pdf13 Oct 2023
Other - LegalFile: Copy of Purchase Deed Part 1.pdf13 Oct 2023
Other - LegalFile: Copy of Purchase Deed Part 2.pdf13 Oct 2023
Other - LegalFile: Copy of Purchase Deed Part 3.pdf13 Oct 2023
Layout approvalFile: Release letter.pdf6 Oct 2023
Building plan approvalFile: Sancation PlanSheet 1.pdf6 Oct 2023
Building plan approvalFile: Sanction PLan Sheet 2.pdf6 Oct 2023
Building plan approvalFile: Sanction Plan Sheet 3.pdf6 Oct 2023
Building plan approvalFile: Sanction Plan Sheet 4.pdf6 Oct 2023
Building plan approvalFile: Sanction PLan Sheet 5.pdf6 Oct 2023
PAN CardFile: PAN of BVN.pdf6 Oct 2023
Copy of the legal title reportFile: Titel Search.pdf6 Oct 2023
Details of encumbrances concerned to FinanceFile: Declaration about encumbrance and litigation.pdf6 Oct 2023
Details of encumbrances concerned to LegalFile: Declaration about encumbrance and litigation.pdf6 Oct 2023

How this compares with Nagpur

95%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN ESTATE PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA PIPLA, TEHSIL & DISTRICT NAGPUR2,800+ in Nagpur

2 kmVRINDAVAN ESTATE PHASE ICompleted 9Lapsed / revoked 14Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: BVN CONSTRO VENTURES LLP

BVN CONSTRO VENTURES LLP has 3 registrations on MahaRERA, including VRINDAVAN ESTATE and VRINDAVAN ESTATE PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if VRINDAVAN ESTATE PHASE II is delayed beyond 5 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN ESTATE PHASE II?

The registered promoter entity is BVN CONSTRO VENTURES LLP, a partnership as per the filing. Its GSTIN 27ABBFB1120A1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN ESTATE PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN ESTATE PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN ESTATE PHASE II?

The professionals named in the filing: Architect: EKVEERA ARCHITECTS; Engineer: SATISH RAIPURE; Chartered Accountant: RANJEET MISHRA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN ESTATE PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN ESTATE PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN ESTATE PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.