ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Vrindavan City E Wing

Registered No litigation declared Residential / Group Housing project

Vrindavan City E Wing

By SRA PROJECT DEVELOPERS PRIVATE LIMITED

RG-MH-21780 · RERA P99000024008 · Last updated on MahaRERA portal: 23 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 36 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 75%
1Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Vrindavan City E Wing is a Residential / Group Housing project by SRA PROJECT DEVELOPERS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000024008 on 14 Jan 2020. Possession is promised by 31 Oct 2026. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVrindavan City E Wing
  • TypeResidential / Group Housing
  • Location
    • Kurgaon Tarapur Road
    • Next to Narmada Vihar
    • Kurgaon
    • Palghar
    • 401501
  • Pincode401501
  • RERA no.P99000024008
  • ReraGenie IDRG-MH-21780

Builder

  • NameSRA PROJECT DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2018PTC308697
  • DirectorsVIVEK OMKAR SINGH, DHANANJAY CHANDRAKANT TENDULKAR, PAWAN ABHIMANYU SINGH
  • Other registrations8 more →
  • No longer live7 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2020First promiseOct 2023Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jan 2020
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 30 Oct 2023)
  • Buildings1 building record
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vrindavan City E WingNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Vrindavan City E Wing: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,499 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3573.82
Proposed, not sanctioned3,574 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, OLD UMA VILLA , MAHIM ROAD, THANE 401404

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNishant Patil
EngineerVishvas Shah
Chartered AccountantVinit Dinesh Gada
PartnerRole in project
SRA PROJECT DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000019534Oct 2023 → Oct 2026

Reason as filed by the promoter1. While registering the project with MahaRERA, we had underestimated the project completion time & hence provided only 3 years duration which proved to be less for such a project. 2. Still the project progress was on track but in between due to some issues & disputes with our labour contractor led to few months delay of works. 3. But rest assured, now the works are in full swing & will be completed within the stipulated timelines of this extended date. 4. Also, we are uploading the PERT Chart/work completion schedule of the project. 5. Hence, we request you to consider our request & justifica

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502846Ganesh Yashwant KhambeSRA PROJECT DEVELOPERS PRIVATE LIMITED13/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory (1)_page-0001.pdf23 Oct 2024
Declaration in FORM BFile: Form-B final.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 E Wing_page-0001.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 FY 23-24.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_E Wing_page-0001.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5- FY 2019-20 (E Wing) Signed.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5- FY 2020-21 (E Wing) Signed.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- FY 2021-22 (E Wing) Signed.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5- FY 2022-23 (E Wing) Signed.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5- FY 2023-24 (E Wing) Signed.pdf21 Oct 2024
Declaration in FORM BFile: Form B-E Wing with stamp.pdf27 Jul 2024
Declaration about Commencement CertificateFile: Declaration of Commencement_E Wing.pdf26 Jul 2024
CERSAI detailsFile: Declaration of Cersai_E Wing.pdf26 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Project_Vivek Singh.pdf26 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Project_Dhananjay Tendulkar.pdf26 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Acc_E Wing.pdf26 Jul 2024
Declaration in FORM BFile: Form B-Extension.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 FY 19-20.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_Form 1 FY 20-21.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Form 1 FY 21-22.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1 FY 22-23.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_Form 1 - Q1 of FY 23-24.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6_Form 1 - Q2 of FY 23-24.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7_Form 1 - Q3 of FY 23-24.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8_Form 1 - Q4 of FY 23-24.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 2019-20.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 2020-21.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 2021-22.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 2022-23.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1 - 30-06-2023.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2 - 30-09-2023.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3 - 31-12-2023.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4 - 31-03-2024.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1_Form 2A FY 19-20.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2_Form 2A FY 20-21.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 3_Form 2A FY 21-22.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4_Form 2A FY 22-23.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A FY 23-24.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf26 Jun 2024
Disclosure of sold/ booked inventoryFile: E Wing Sold Unsold.pdf18 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Comencement Cert Phase 2.pdf10 Jan 2020
PAN CardFile: PAN CARD.pdf21 Dec 2019
Building plan approvalFile: Building Plan C2 (Reduce).pdf16 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Building Plan C2 (Reduce).pdf16 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E wing Form 3.pdf16 Dec 2019
Proforma of Allotment letterFile: Allotment Letter and Rera Draft.pdf16 Dec 2019
Layout approvalFile: Layout Phase 2 (Reduce).pdf13 Dec 2019
Copy of the legal title reportFile: Title Clearance and Search Report (Phase-2).pdf13 Dec 2019
Details of encumbrancesFile: Encubrancement Letter - E Wing.pdf13 Dec 2019
Copy of Layout Approval (in case of layout)File: Layout Phase 2 (Reduce).pdf13 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Reply With NOC.pdf13 Dec 2019
Declaration in FORM BFile: Form B.pdf13 Dec 2019

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vrindavan City E Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Next to Narmada Vihar3,200+ in Palghar

Builder: SRA PROJECT DEVELOPERS PRIVATE LIMITED

SRA PROJECT DEVELOPERS PRIVATE LIMITED has 9 registrations on MahaRERA, including SRA 1 and SRA 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Vrindavan City E Wing is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vrindavan City E Wing?

The registered promoter entity is SRA PROJECT DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2018PTC308697 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vrindavan City E Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vrindavan City E Wing?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vrindavan City E Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vrindavan City E Wing?

The professionals named in the filing: Architect: Nishant Patil; Engineer: Vishvas Shah; Chartered Accountant: Vinit Dinesh Gada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vrindavan City E Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vrindavan City E Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vrindavan City E Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.