Home / Browse projects / Thane, Maharashtra / Vrindavan City Building C and D

Registered Litigation declared Residential / Group Housing project

Vrindavan City Building C and D

By Mohd Salim Yusuf

RG-MH-06979 · RERA P51700054552 · Last updated on MahaRERA portal: 23 Aug 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
180 of 180Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Vrindavan City Building C and D is a Residential / Group Housing project by Mohd Salim Yusuf in Thane, Maharashtra, registered with MahaRERA as P51700054552 on 31 Jan 2024. Possession is promised by 1 Apr 2029. 0 of the 180 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameVrindavan City Building C and D
  • TypeResidential / Group Housing
  • Location
    • Vrindavan City Road
    • Ambivali W
    • Vadavali Bk.
    • Kalyan
    • Thane
    • 421102
  • Pincode421102
  • RERA no.P51700054552
  • ReraGenie IDRG-MH-06979

Builder

  • NameMohd Salim Yusuf
  • Entity typeIndividual
  • Other registrations1 more →
  • Declared earlier projects20 →

Key dates

this monthRegisteredJan 2024PromisedApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2024
  • Promised completion1 Apr 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

0%0 of 180 units booked
5.3%Work done, per cost certificate

Figures as on 23 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building CNA151598098
Building DNA151582082

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Building C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed359

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots359
Closed/Covered39
Open Space320
BuildingClosed/CoveredOpen SpaceTotal
Building C22176198
Building D17144161

Land and ownership47

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,317 sq m
Land owned byThe promoter, with other names on the file
Named landowners47
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025
LandownerVillageDistrict
Shivram Gangaram TareKalyanThane
Ganpat Gangaram TareKalyanThane
Baliram Gangaram TareKalyanThane
Dashrath Gangaram TareKalyanThane
Ananta Kathod MirkuteKalyanThane
Ganesh Harkya TareKalyanThane
Sunil Tukaram TareKalyanThane
Raghunath H TareKalyanThane
Ashok H TareKalyanThane
Shashikant H TareKalyanThane
Savitribai Ratan PatilKalyanThane
Renuka Shankar PatilKalyanThane
Kiran Krishna MirkuteKalyanThane
Janabai Barku MirkuteKalyanThane
Vasanti Satish SutarKalyanThane
Sushma Vasudev TiwariKalyanThane
Vijay Barku MirkuteKalyanThane
Sanjay Barku MirkuteKalyanThane
Seema Ganesh KonkarKalyanThane
Vilas H TareKalyanThane
Sanjay H TareKalyanThane
Savita N PatilKalyanThane
Yashoda Rajesh TareKalyanThane
Roshan R tareKalyanThane
Vasanti R TareKalyanThane
Sakshi R TareKalyanThane
Sameer R TareKalyanThane
Sugandha Arjun tareKalyanThane
Akshata Arjun tareKalyanThane
Ritik A TareKalyanThane
Subhadra D TareKalyanThane
Dakshata D TareKalyanThane
Uttam D TareKalyanThane
Parvati Rajaram PatilKalyanThane
Bebibai Harkya TareKalyanThane
Kundan Chavhanlal PatilKalyanThane
Sharda Prakash PatilKalyanThane
Laxmi Sham PatilKalyanThane
Chandan Chavhanlal PatilKalyanThane
Urmila Hanuman PatilKalyanThane
Rupika Shekhar PatilKalyanThane
Dropati Datta BhoirKalyanThane
Surekha Raja JadhavKalyanThane
Jayashree Barku MirkuteKalyanThane
Laxmibai Krishna MirkuteKalyanThane
Parvatibai Tukaram TareKalyanThane
Rohini Sambhaji MogareKalyanThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI10735.47
Proposed, not sanctioned10,735 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGURU GOBIND HOUSE OPP PURNIMA THEATRE MURBAD ROAD KALYAN WEST THANE 421301
Estimated costRs 32.38 cr
Cost incurredRs 1.73 cr
Work done5.35%
BuildingWingEstimatedIncurred
Building CNARs 16.19 crRs 86.56 lakh
Building DNARs 16.19 crRs 86.56 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHOBANA DESHPANDE
EngineerAssociated Structural Engineers LLP
Chartered AccountantDILIP BRAMHECHA
PartnerRole in project
Mohd Salim Yusuf-

Litigation declared1

CaseCourtStatus
150/2019Civil Judge S D KalyanClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Apr 2029

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Wing C u0026 D.pdf23 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate Wing C u0026 D.pdf23 Aug 2025
Withdrawal Update Form 3File: Ca Certificate Wing C u0026 D.pdf23 Aug 2025
Withdrawal Update Form 1File: Architect Certificate Wing C u0026 D.pdf13 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate Wing C u0026 D.pdf13 Aug 2025
Withdrawal Update Form 3File: Ca Certificate Wing C u0026 D.pdf13 Aug 2025
Form 1File: Architect Certificate Wing A & B.pdf17 Jul 2025
Form 2File: Engineer Certificate A & B.pdf17 Jul 2025
Form 3File: Ca Certificate Wing A & B.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Unsold & Sold Inventory A & B.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CREATION.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Creation.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer Certificate (2).pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Creations Certificate.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (2).pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CREATION CERTIFICATE.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DILIP BRAMHECHA.pdf18 Apr 2024
Copy of the legal title reportFile: Title Cetificate 220124.pdf25 Jan 2024
Other - LegalFile: Landowners Declaration.pdf25 Jan 2024
Layout approvalFile: Layout_compressed_compressed_compressed (2)_compressed_compressed.pdf26 Dec 2023
Building plan approvalFile: Layout_compressed_compressed_compressed (2)_compressed_compressed.pdf26 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout_compressed_compressed_compressed (2)_compressed_compressed.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout_compressed_compressed_compressed (2)_compressed_compressed.pdf26 Dec 2023
Proforma of Agreement for saleFile: AFS271123.pdf27 Nov 2023
Layout approvalFile: Building C.pdf3 Nov 2023
Layout approvalFile: Building D.pdf3 Nov 2023
Building plan approvalFile: Building C.pdf3 Nov 2023
Building plan approvalFile: Building D.pdf3 Nov 2023
Copy of Layout Approval (in case of layout)File: Building C.pdf3 Nov 2023
Copy of Layout Approval (in case of layout)File: Building D.pdf3 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Building C.pdf3 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Building D.pdf3 Nov 2023
Other - TechnicalFile: Self Declaration for AREA.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrances to finance.pdf2 Nov 2023
Details of encumbrances concerned to FinanceFile: Declaration of No encumbrances to legal.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: Declaration of No Encumbrances to finance.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: Declaration of No encumbrances to legal.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf2 Nov 2023
Proforma of Allotment letterFile: Alloment Letter.pdf2 Nov 2023
Other - TechnicalFile: Explanation about FSI.pdf2 Nov 2023
Other - TechnicalFile: Explanation about parking of the project.pdf2 Nov 2023
PAN CardFile: PAN Card.pdf30 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Oct 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf30 Oct 2023
Declaration in FORM BFile: Form B.pdf30 Oct 2023
CERSAI detailsFile: Declaration for Cersai for Vrindavan City building C and D.pdf30 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate.pdf30 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf30 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation Report for allotment letter.pdf30 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report model agreement.pdf30 Oct 2023
Other - LegalFile: Non negotiable clauses.pdf30 Oct 2023

Promoter's earlier projects20

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

18 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Vrindavan ParkMilind Nagar Road Near Gauripada Talao Kalyan west103CompletedJul 2019Jul 2019
vrindavan palms wing A and Bbehind aarti nagari wayle nagar road kalyan west104CompletedSep 2015Mar 2015
Vrindavan Palms Wing Gbehind aarti nagari wayle nagar kalyan west24CompletedSep 2015Jun 2015
vrindavan shrushtibehind golden oak hotel kolivali kalyan west70CompletedNov 2014Nov 2014
vrindavan palms wing C and Dbehind aarti nagari wayle nagar road kalyan west70CompletedJun 2012Jun 2012
Vrindavan Palms Wing E and Fbehind aarti nagari wayle nagar kalyan west56CompletedJun 2012Jun 2012
Vrindavan Garden C and DNear Vasant Park Behind Agrawal College Village Gandhare Kalyan49CompletedApr 2011Apr 2011
Vrindavan Garden Wing A and BNear Vasant Park Behind Agrawal College Village Gandhare Kalyan56CompletedMar 2011Mar 2011
Vrindavan ValleyOpp Vanashri Complex Near Khadakpada Circle Kalyan West64CompletedMay 2009May 2009
Vrindavan Paradise A B and CNear Vasant Valley Village Gandhare Kalyan119CompletedApr 2009Apr 2009
Vrindavan Residency type BNear Yogidham Village Gauripada Kalyan West45CompletedAug 2008Aug 2008
Vrindavan Residency Type ANear Yogidham Village Gauripada Kalyan West60CompletedSep 2006Late, Sep 2009
Kalpaturu ResidencyForest Housing Soc Birla College Road village chikanghar Kalyan W100CompletedSep 2005Sep 2005
sai vihar apartmentvillage kulgaon badlapur muncipal48CompletedJun 2002Jun 2002
sai dham apartmentvillage gauripada milind nagar kalyan west40CompletedMar 2001Late, Mar 2001
kalpataru apartmentvillage manjarli badlapur munciple19CompletedJun 2000Jun 2000
vrindavan apartmentvillage katemanivali near sahyadri park kalyan east16CompletedDec 1997Dec 1997
lotus apartmentvillage manda titwala west20CompletedOct 1997Oct 1997
choice apartmentvillage katemanivali shankar pawshe road kalyan east16CompletedAug 1997Aug 1997
classic apartmentvillage katemanivali shankar pawshe road kalyn east21CompletedOct 1996Oct 1996

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vrindavan City Building C and D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambivali W7,600+ in Thane

Builder: Mohd Salim Yusuf

Mohd Salim Yusuf has 2 registrations on MahaRERA, including VRINDAVAN CITY and Vrindavan City Building C and D. Its filings disclose 20 earlier MahaRERA projects: declares 18 of 20 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Vrindavan City Building C and D is delayed beyond 1 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vrindavan City Building C and D?

The registered promoter entity is Mohd Salim Yusuf, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vrindavan City Building C and D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vrindavan City Building C and D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vrindavan City Building C and D?

The professionals named in the filing: Architect: SHOBANA DESHPANDE; Engineer: Associated Structural Engineers LLP; Chartered Accountant: DILIP BRAMHECHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vrindavan City Building C and D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vrindavan City Building C and D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vrindavan City Building C and D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.