Registered No litigation declared Residential / Group Housing project

VIVA CITY - A3

By VIVA WINNER VENTURE REALTORS LLP

RG-MH-19736 · RERA P99000003245 · Last updated on MahaRERA portal: 1 Aug 2026

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA
  • Completion date moved by 60 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 60 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 96%
40 of 140Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 243 documents Report an error

VIVA CITY - A3 is a Residential / Group Housing project by VIVA WINNER VENTURE REALTORS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000003245 on 5 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 60 months from the original filing. 100 of the 140 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameVIVA CITY - A3
  • TypeResidential / Group Housing
  • Location
    • Station Road
    • Virar West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000003245
  • ReraGenie IDRG-MH-19736

Builder

  • NameVIVA WINNER VENTURE REALTORS LLP
  • Entity typePartnership
  • PartnerROHIL JAYENDRA THAKUR
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJun 2022Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed243 files

Current status

71%100 of 140 units booked
95.2%Work done, per cost certificate

Figures as on 1 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3NA171612812140

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 96%.

A3: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities15

As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed198

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots198
Closed/Covered20
Open Space178

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,409 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
VIVA WINNER VENTURE REALTORS LLPVasai-Virar City (M Corp)Palghar
VIVA HOLDINGSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI5566.83
Proposed, not sanctioned5,567 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch11, VITHAL NAGAR CO-OP HSG SOCIETY, 10th ROAD, JVPD SCHEME, VILE PARLE WEST, MUMBAI, PIN 400 049
Estimated costRs 25.72 cr
Cost incurredRs 24.50 cr
Work done95.25%
BuildingWingEstimatedIncurred
A3NARs 23.14 crRs 22.60 cr
-NARs 2.58 crRs 1.90 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS ENCON
EngineerPARESH UNNARKAR PARESH UNNARKAR
EngineerRAJENDRA RAMBHAU NIRGUDWAR
EngineerSANJAY NARANG
Chartered AccountantI P MEHTA & COMPANY CHARTERED ACCOUNTS
PartnerRole in project
VIVA WINNER VENTURE REALTORS LLP-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012095Jun 2022 → Jun 2023

Reason as filed by the promoter2. I/ We are highly regretful for the delay in handing over the possession of the above mentioned building due to demonization and current market scenario which is totally unfavorable especially for the real estate industry and almost all the developers in the industry have seen downfall in the business over the last few years. In addition, construction activities has severely been affected due to lockdown imposed by concerned authorities, Migration of labor forces and material supply etc. for past 1.5 year.

EXT99000024178Jun 2022 → Jun 2025

Reason as filed by the promoterWe are highly regretful for the delay in handing over the possession of the said project. We are in the final phase of completion of the project. Progress of the work hampered due to the cash flow which was impacted due to current market scenario in the region. Also, we faced material supply issue which also affected the progress of the work causing delay beyond our control.

EXT99000016905Jun 2022 → Jun 2024

Reason as filed by the promoterWe are highly regretful for the delay in handing over the possession of the above mentioned building. Construction progress and related activities were affected highly due to COVID - 19 pandemic in 2020-21, also current unfavorable market scenario for the real estate industry has contributed in delay and majority of the developers in the industry have seen downfall in the business over the last few years

EA25072502193Jun 2022 → Jun 2026

Reason as filed by the promoterWe are highly regretful for the delay in handing over the possession of the above mentioned building due to demonization and current market scenario which is totally unfavorable especially for the real estate industry and almost all the developers in the industry have seen downfall in the business over the last few years. This has caused us significant in issue financially which in turn affected the progress. However, we have addressed these issues and currently the activities are in full flow.

EA28072621913Jun 2022 → Jun 2027

Reason as filed by the promoterWe are highly regretful for the delay in handing over the possession of the abovementioned building due to demonization and current market scenario which is totally unfavorable especially for the real estate industry and almost all the developers in the industry have seen downfall in the business over the last few years. This has caused us significant in issue financially which in turn affected the progress. However, we have addressed these issues and currently the activities are in full flow.

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000078792M/s.Jivdani Realtors LLPVIVA WINNER VENTURE REALTORS LLP16/04/2019
CC006000000198860ABHISHEK BADKULVIVA WINNER VENTURE REALTORS LLP12/11/2021
CC006000000231252Malcolm FernandesViva Winner Venture Realtors LLP21/05/2022
CC006000000282164Amod Suresh RanadiveViva Winner Ventures Realtors LLP06/08/2022
CC006000000303234Hilda Agnes DmelloViva Winner Venture Realtors LLP04/11/2022
CC006000000500429Poonam Pathare and Siddhesh PathareViva Winner Venture Realtors LLP13/05/2024
CC12500359HETAL SUDESH PARDESHIVIVA WINNER VENTURE REALTORS LLP02/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed243

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 243 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Viva City A3 - Form 1 -Jun 26.pdf1 Aug 2026
Withdrawal Update Form 2File: Engg Certificate - A3.pdf1 Aug 2026
Withdrawal Update Form 3File: Form 3 - A3 - Jun 26.pdf1 Aug 2026
Withdrawal Update Form 1File: Viva City A3 - Form 1 -Jun 26.pdf28 Jul 2026
Withdrawal Update Form 2File: Engg Certificate - A3.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 - A3 - Jun 26.pdf28 Jul 2026
Withdrawal Update Form 1File: Form 1 A3 Sep-2025.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 A3 Dec-2025.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 A3 Mar-2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 A3 Sep-2025.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 A3 Dec-2025.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 A3 Mar-2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 A3 Sep-2025.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 A3 Dec-2025.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 A3 Mar-2026.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A-A3.pdf20 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 A3.pdf20 Jul 2026
Form 1File: A3-Mar18.pdf17 Sep 2025
Form 2File: A3-Mar18-2.pdf17 Sep 2025
Form 3File: A3 Form 3-2018.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Mar18.pdf17 Sep 2025
Form 1File: A3 Architect Certificate.pdf17 Sep 2025
Form 2File: A3 Engineer Certificate.pdf17 Sep 2025
Form 3File: A3 FORM 3-2019.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Mar19.pdf17 Sep 2025
Form 1File: A3 Architect Certificate 2020.pdf17 Sep 2025
Form 2File: A3 Engineer Certificate 2020.pdf17 Sep 2025
Form 3File: A3 FORM 3-2020.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Mar20.pdf17 Sep 2025
Form 1File: A3 Architect Certificate 2021.pdf17 Sep 2025
Form 2File: A3 Engineer Certificate 2021.pdf17 Sep 2025
Form 3File: A3 FORM 3-2021.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Mar21.pdf17 Sep 2025
Form 1File: A3 Architect Certificate 2022.pdf17 Sep 2025
Form 2File: A3 Engineer Certificate 2022.pdf17 Sep 2025
Form 3File: A3 FORM 3-2022.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3-Mar22-inventory.pdf17 Sep 2025
Form 3File: FORM 3 A3- JUN-2018.pdf16 Sep 2025
Form 1File: Form 1 Jun2018 A3.pdf16 Sep 2025
Form 2File: Form 2 Jun2018 A3.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Jun18.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Sep18.pdf16 Sep 2025
Form 1File: A3-form 1-9-2018.pdf16 Sep 2025
Form 2File: A3-form 2-9-2018.pdf16 Sep 2025
Form 3File: FORM 3 A3- SEP-2018.pdf16 Sep 2025
Form 1File: A3-form 1-12-2018.pdf16 Sep 2025
Form 2File: A3-form 2-12-2018.pdf16 Sep 2025
Form 3File: FORM 3- DEC -2018.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Dec18.pdf16 Sep 2025
Form 1File: A3 Architect Certificate.pdf16 Sep 2025
Form 2File: A3 Engineer Certificate.pdf16 Sep 2025
Form 3File: FORM 3 A3- JUN-19.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Jun19.pdf16 Sep 2025
Form 1File: A3-form 1-12-2023.pdf16 Sep 2025
Form 2File: A3-form 2-12-2023.pdf16 Sep 2025
Form 3File: FORM 3 A3- DEC-2023.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory -Dec23.pdf16 Sep 2025
Form 1File: A3-form 1-9-2023.pdf16 Sep 2025
Form 2File: A3-form 2-9-2023.pdf16 Sep 2025
Form 3File: FORM 3 A3 SEP-2023.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Sep23.pdf16 Sep 2025
Form 1File: A3-form 1-6-2023.pdf16 Sep 2025
Form 2File: A3-form 2-6-2023.pdf16 Sep 2025
Form 3File: FORM 3 A3- JUN-2023.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3-Jun23-inventory.pdf16 Sep 2025
Form 1File: A3-form 1-12-2022.pdf16 Sep 2025
Form 2File: A3-form 2-12-2022.pdf16 Sep 2025
Form 3File: FORM 3 A3 DEC-2022.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Dec22.pdf16 Sep 2025
Form 1File: A3-form 1-9-2022.pdf16 Sep 2025
Form 2File: A3-form 2-9-2022.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 inventory-Sep22.pdf16 Sep 2025
Form 3File: FORM 3 A3 SEP-22.pdf16 Sep 2025
Form 1File: A3-form 1-12-2021.pdf16 Sep 2025
Form 2File: A3-form 2-12-2021.pdf16 Sep 2025
Form 3File: FORM 3 A3- DEC-21.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: A3 Inventory-Dec21.pdf16 Sep 2025
Form 1File: A3-form 1-9-2021.pdf16 Sep 2025
Form 2File: A3-form 2-9-2021.pdf16 Sep 2025
Form 3File: FORM 3 A3 SEP-2021.pdf16 Sep 2025

How this compares with Palghar

71%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 60 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIVA CITY - A3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar West3,200+ in Palghar

2 kmVIVA CITY - A3Completed 19Lapsed / revoked 16Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: VIVA WINNER VENTURE REALTORS LLP

VIVA WINNER VENTURE REALTORS LLP has 3 registrations on MahaRERA, including VIVA CITY - A3 and VIVA CITY -A9. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VIVA CITY - A3 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIVA CITY - A3?

The registered promoter entity is VIVA WINNER VENTURE REALTORS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIVA CITY - A3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VIVA CITY - A3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VIVA CITY - A3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIVA CITY - A3?

The professionals named in the filing: Architect: MS ENCON; Engineer: PARESH UNNARKAR PARESH UNNARKAR; Engineer: RAJENDRA RAMBHAU NIRGUDWAR; Engineer: SANJAY NARANG; Chartered Accountant: I P MEHTA & COMPANY CHARTERED ACCOUNTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIVA CITY - A3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIVA CITY - A3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIVA CITY - A3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.