Completed No litigation declared Residential / Group Housing project

VIVA CITY - A1

By VIVA WINNER VENTURE RELATORS LLP

RG-MH-19646 · RERA P99000004874 · Last updated on MahaRERA portal: 11 Jun 2022

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
2Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

VIVA CITY - A1 is a Residential / Group Housing project by VIVA WINNER VENTURE RELATORS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000004874 on 9 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2020. The completion date has moved by 18 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameVIVA CITY - A1
  • TypeResidential / Group Housing
  • Location
    • Station Road
    • Virar West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000004874
  • ReraGenie IDRG-MH-19646

Builder

  • NameVIVA WINNER VENTURE RELATORS LLP
  • Entity typePartnership
  • PartnerROHIL JAYENDRA THAKUR
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion29 Dec 2020
  • Revised completionRevised to 29 Dec 2020 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

A1: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 11 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
CLUB HOUSEYes0%

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered8
Open Space63

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,491 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
VIVA WINNER VENTURE REALTORS LLPVasai-Virar City (M Corp)Palghar
VIVA HOLDINGSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI5754.34
Proposed, not sanctioned5,754 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch11, VITHAL NAGAR CO-OP HSG SOCIETY, 10th ROAD, JVPD SCHEME, VILE PARLE WEST, MUMBAI, PIN 400 049

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS ENCON
EngineerPARESH UNNARKAR
PartnerRole in project
VIVA WINNER VENTURE RELATORS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000002421Jun 2019 → Jun 2020

Reason as filed by the promoterDue to current market scenario and financial difficulties which is totally unfavorable for the real estate industry.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000044339MAHENDRA S WADEKARVIVA WINNER VENTURE REALTORS LLP28/04/2018
CC006000000001698Shubha Shrikant govilMsViva winner venture srealtors LLP, Shri Mehul Deepak Thakur ,15/11/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Oct 2021

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Viva City RDP Dated-09-07-2021_11zon.pdf11 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate - VIVA CITY .pdf20 Oct 2021
OtherFile: OC Application - Viva City A1 A2.pdf28 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4-VIVA CITY A1.pdf29 Dec 2020
Building plan approvalFile: Bld A1.pdf6 May 2020
Layout approvalFile: Approved Layout Plan.pdf6 May 2020
Copy of Layout Approval (in case of layout)File: Approved Layout Plan.pdf6 May 2020
Building Plan Approval (IOD)File: Bld A1.pdf6 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1 Architect Certificate .pdf18 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1 Engineer Certificate .pdf18 Sep 2019
Certificates of CA (Form 5)File: VIVA CITY A1 FORM 5 31-03-19.pdf16 Sep 2019
Certificates of CA (Form 5)File: Viva1.pdf9 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1 Engineer Certificate 31-3-18-ilovepdf-compressed.pdf1 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: VIVA CITY CC.pdf5 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1 Architect Certificate.pdf16 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1 Engineer Certificate.pdf16 Jan 2018
Proforma of Allotment letterFile: VIVA CITY A1.pdf12 Dec 2017
Proforma of Allotment letterFile: AGREEMENT A1.pdf4 Dec 2017
Proforma of Allotment letterFile: A1 AGREEMENT DRAFT.pdf25 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Viva City A-1.pdf29 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate viva City- A1.pdf29 Oct 2017
Copy of the legal title reportFile: FINAL TITLE AND SEARCH REPORT.pdf28 Jul 2017
Details of encumbrancesFile: ENCUMBRANCES A1.pdf28 Jul 2017
Declaration in FORM BFile: FORM 'B' A1.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE A1.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE A1.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf28 Jul 2017
Proforma of Allotment letterFile: DECLARATION FOR ALLOTMENT LETTER AND AGREEMENT LETTER A1.pdf28 Jul 2017
OtherFile: DECLERATION BY ARCHITECT A1.pdf28 Jul 2017
OtherFile: SELF DECLERATION A1.pdf28 Jul 2017
Building plan approvalFile: A1.pdf26 Jul 2017
Layout approvalFile: Layout.pdf26 Jul 2017
PAN CardFile: Pan Card VIVA WINNER VENTURE REALTORS LLP.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf26 Jul 2017
Building Plan Approval (IOD)File: A1.pdf26 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 18 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIVA CITY - A1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar West3,200+ in Palghar

2 kmVIVA CITY - A1Completed 36Lapsed / revoked 21Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: VIVA WINNER VENTURE RELATORS LLP

VIVA WINNER VENTURE RELATORS LLP has 6 registrations on MahaRERA, including VIVA CITY - A1 and VIVA CITY - A4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VIVA CITY - A1 is delayed beyond 29 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIVA CITY - A1?

The registered promoter entity is VIVA WINNER VENTURE RELATORS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIVA CITY - A1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VIVA CITY - A1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VIVA CITY - A1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIVA CITY - A1?

The professionals named in the filing: Architect: MS ENCON; Engineer: PARESH UNNARKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIVA CITY - A1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIVA CITY - A1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIVA CITY - A1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.