VITTHAL NAGARI
By VENKATESHWARA BUILDERS & DEVELOPERS
RG-MH-76491 · RERA P51500030173 · Last updated on MahaRERA portal: 10 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VITTHAL NAGARI is a Residential / Group Housing project by VENKATESHWARA BUILDERS & DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500030173 on 5 Aug 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date.
At a glance
Project
- NameVITTHAL NAGARI
- TypeResidential / Group Housing
- Location
- MAUJE AAPATGON
- Aurangabad (M Corp.)
- Aurangabad
- 431007
- Pincode431007
- RERA no.P51500030173
- ReraGenie IDRG-MH-76491
Builder
- NameVENKATESHWARA BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnersSANJAY RAMBHAU GHADMODE, MITHILESH RAMRAO HAKE PATIL, SUDHIR UTTAMRAO DIKKAR, RAJESH PRABHAKARAO VIBHUTE, PANKAJ BALKRUSHNA KENDE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Aug 2021
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings95 building records
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE NO 1 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 2 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 3 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 4 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 5 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 6 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 7 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 8 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 9 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 10 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 11 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 12 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 13 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 14 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 15 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 16 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 17 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 18 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 19 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 20 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 21 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 22 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 23 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 24 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 25 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 26 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 27 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 28 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 29 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 30 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 31 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 32 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 33 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 34 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 35 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 36 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 37 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 38 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 39 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 40 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 41 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 42 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 43 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 44 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 45 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 46 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 47 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 48 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 49 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 50 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 51 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 52 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 53 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 54 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 55 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 56 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 57 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 58 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 59 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 60 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 61 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 62 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 63 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 64 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 65 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 66 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 67 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 68 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 69 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 70 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 71 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 72 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 73 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 74 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 75 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 76 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 77 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 78 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 79 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 80 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 81 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 82 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 83 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 84 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 85 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 86 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 87 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 88 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 89 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 90 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 91 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 92 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 93 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 94 | NA | 1 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 95 | NA | 1 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 10 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 95 buildings; the table lists the first 20.
0 of 1045 construction stages are filed complete across 95 buildings. The stage furthest along is Excavation, at 0%.
ROW HOUSE NO 10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 80%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 90%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 100%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 110%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 120%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 130%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 140%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 150%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 160%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 170%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 180%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 190%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 200%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed106
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ROW HOUSE NO 1 | 0 | 1 | 1 |
| ROW HOUSE NO 2 | 0 | 1 | 1 |
| ROW HOUSE NO 3 | 0 | 1 | 1 |
| ROW HOUSE NO 4 | 0 | 1 | 1 |
| ROW HOUSE NO 5 | 0 | 1 | 1 |
| ROW HOUSE NO 6 | 0 | 1 | 1 |
| ROW HOUSE NO 7 | 0 | 1 | 1 |
| ROW HOUSE NO 8 | 0 | 1 | 1 |
| ROW HOUSE NO 9 | 0 | 1 | 1 |
| ROW HOUSE NO 10 | 0 | 1 | 1 |
| ROW HOUSE NO 11 | 0 | 1 | 1 |
| ROW HOUSE NO 12 | 0 | 1 | 1 |
| ROW HOUSE NO 13 | 0 | 1 | 1 |
| ROW HOUSE NO 14 | 0 | 1 | 1 |
| ROW HOUSE NO 15 | 0 | 1 | 1 |
| ROW HOUSE NO 16 | 0 | 1 | 1 |
| ROW HOUSE NO 17 | 0 | 1 | 1 |
| ROW HOUSE NO 18 | 0 | 1 | 1 |
| ROW HOUSE NO 19 | 0 | 1 | 1 |
| ROW HOUSE NO 20 | 0 | 1 | 1 |
| ROW HOUSE NO 21 | 0 | 1 | 1 |
| ROW HOUSE NO 22 | 0 | 1 | 1 |
| ROW HOUSE NO 23 | 0 | 1 | 1 |
| ROW HOUSE NO 24 | 0 | 1 | 1 |
| ROW HOUSE NO 25 | 0 | 1 | 1 |
| ROW HOUSE NO 26 | 0 | 1 | 1 |
| ROW HOUSE NO 27 | 0 | 1 | 1 |
| ROW HOUSE NO 28 | 0 | 1 | 1 |
| ROW HOUSE NO 29 | 0 | 1 | 1 |
| ROW HOUSE NO 30 | 0 | 1 | 1 |
| ROW HOUSE NO 31 | 0 | 1 | 1 |
| ROW HOUSE NO 32 | 0 | 1 | 1 |
| ROW HOUSE NO 33 | 0 | 1 | 1 |
| ROW HOUSE NO 34 | 0 | 1 | 1 |
| ROW HOUSE NO 35 | 0 | 1 | 1 |
| ROW HOUSE NO 36 | 0 | 1 | 1 |
| ROW HOUSE NO 37 | 0 | 1 | 1 |
| ROW HOUSE NO 38 | 0 | 1 | 1 |
| ROW HOUSE NO 39 | 0 | 1 | 1 |
| ROW HOUSE NO 40 | 0 | 1 | 1 |
| ROW HOUSE NO 41 | 0 | 1 | 1 |
| ROW HOUSE NO 42 | 0 | 1 | 1 |
| ROW HOUSE NO 43 | 0 | 1 | 1 |
| ROW HOUSE NO 44 | 0 | 1 | 1 |
| ROW HOUSE NO 45 | 0 | 11 | 11 |
| ROW HOUSE NO 46 | 0 | 1 | 1 |
| ROW HOUSE NO 47 | 0 | 1 | 1 |
| ROW HOUSE NO 48 | 0 | 1 | 1 |
| ROW HOUSE NO 49 | 0 | 1 | 1 |
| ROW HOUSE NO 50 | 0 | 1 | 1 |
| ROW HOUSE NO 51 | 0 | 1 | 1 |
| ROW HOUSE NO 52 | 0 | 1 | 1 |
| ROW HOUSE NO 53 | 0 | 1 | 1 |
| ROW HOUSE NO 54 | 0 | 1 | 1 |
| ROW HOUSE NO 55 | 0 | 1 | 1 |
| ROW HOUSE NO 56 | 0 | 1 | 1 |
| ROW HOUSE NO 57 | 0 | 1 | 1 |
| ROW HOUSE NO 58 | 0 | 1 | 1 |
| ROW HOUSE NO 59 | 0 | 1 | 1 |
| ROW HOUSE NO 60 | 0 | 1 | 1 |
| ROW HOUSE NO 61 | 0 | 1 | 1 |
| ROW HOUSE NO 62 | 0 | 1 | 1 |
| ROW HOUSE NO 63 | 0 | 1 | 1 |
| ROW HOUSE NO 64 | 0 | 1 | 1 |
| ROW HOUSE NO 65 | 0 | 1 | 1 |
| ROW HOUSE NO 66 | 0 | 1 | 1 |
| ROW HOUSE NO 67 | 0 | 1 | 1 |
| ROW HOUSE NO 68 | 0 | 1 | 1 |
| ROW HOUSE NO 69 | 0 | 1 | 1 |
| ROW HOUSE NO 70 | 0 | 1 | 1 |
| ROW HOUSE NO 71 | 0 | 1 | 1 |
| ROW HOUSE NO 72 | 1 | 1 | 2 |
| ROW HOUSE NO 73 | 0 | 1 | 1 |
| ROW HOUSE NO 74 | 0 | 1 | 1 |
| ROW HOUSE NO 75 | 0 | 1 | 1 |
| ROW HOUSE NO 76 | 0 | 1 | 1 |
| ROW HOUSE NO 77 | 0 | 1 | 1 |
| ROW HOUSE NO 78 | 0 | 1 | 1 |
| ROW HOUSE NO 79 | 0 | 1 | 1 |
| ROW HOUSE NO 80 | 0 | 1 | 1 |
| ROW HOUSE NO 81 | 0 | 1 | 1 |
| ROW HOUSE NO 82 | 0 | 1 | 1 |
| ROW HOUSE NO 83 | 0 | 1 | 1 |
| ROW HOUSE NO 84 | 0 | 1 | 1 |
| ROW HOUSE NO 85 | 0 | 1 | 1 |
| ROW HOUSE NO 86 | 0 | 1 | 1 |
| ROW HOUSE NO 87 | 0 | 1 | 1 |
| ROW HOUSE NO 88 | 0 | 1 | 1 |
| ROW HOUSE NO 89 | 0 | 1 | 1 |
| ROW HOUSE NO 90 | 0 | 1 | 1 |
| ROW HOUSE NO 91 | 0 | 1 | 1 |
| ROW HOUSE NO 92 | 0 | 1 | 1 |
| ROW HOUSE NO 93 | 0 | 1 | 1 |
| ROW HOUSE NO 94 | 0 | 1 | 1 |
| ROW HOUSE NO 95 | 0 | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANJAY RAMBHAU GHADMODE | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUDHIR DIKKAR |
| Engineer | SUDHIR DIKKAR |
| Chartered Accountant | CHETAN NOGAJA |
| Partner | Role in project |
|---|---|
| VENKATESHWARA BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1.pdf | 10 Apr 2026 |
| Form 2File: FORM 2.pdf | 10 Apr 2026 |
| Form 3File: FORM 3.pdf | 10 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 10 Apr 2026 |
| Form 1File: 1.pdf | 25 Mar 2026 |
| Form 2File: 1 130326 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 1.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 1.pdf | 25 Mar 2026 |
| Form 1File: 2.pdf | 25 Mar 2026 |
| Form 2File: 2 311221 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 2.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2.pdf | 25 Mar 2026 |
| Form 1File: 3.pdf | 25 Mar 2026 |
| Form 2File: 3 310322 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 3.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 3.pdf | 25 Mar 2026 |
| Form 1File: 4.pdf | 25 Mar 2026 |
| Form 2File: 4 300622 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 4.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 4.pdf | 25 Mar 2026 |
| Form 1File: 5.pdf | 25 Mar 2026 |
| Form 2File: 5 300922 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 5.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 5.pdf | 25 Mar 2026 |
| Form 1File: 6.pdf | 25 Mar 2026 |
| Form 2File: 6 311222 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 6.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 6.pdf | 25 Mar 2026 |
| Form 1File: 7.pdf | 25 Mar 2026 |
| Form 2File: 7 310323 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 7.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 7.pdf | 25 Mar 2026 |
| Form 1File: 8.pdf | 25 Mar 2026 |
| Form 2File: 8 300623 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 8.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 8.pdf | 25 Mar 2026 |
| Form 1File: 9.pdf | 25 Mar 2026 |
| Form 2File: 9 300923 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 9.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 9.pdf | 25 Mar 2026 |
| Form 1File: 10.pdf | 25 Mar 2026 |
| Form 2File: 10 311223 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 10.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 10.pdf | 25 Mar 2026 |
| Form 1File: 11.pdf | 25 Mar 2026 |
| Form 2File: 11.pdf | 25 Mar 2026 |
| Form 3File: 11.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 11.pdf | 25 Mar 2026 |
| Form 1File: 12.pdf | 25 Mar 2026 |
| Form 2File: 12 300624 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 12.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 12.pdf | 25 Mar 2026 |
| Form 1File: 13.pdf | 25 Mar 2026 |
| Form 2File: 13 300924 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 13.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 13.pdf | 25 Mar 2026 |
| Form 1File: 14.pdf | 25 Mar 2026 |
| Form 2File: 14 311224 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 14.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 14.pdf | 25 Mar 2026 |
| Form 1File: 15.pdf | 25 Mar 2026 |
| Form 2File: 15 310325 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 15.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 15.pdf | 25 Mar 2026 |
| Form 1File: 16.pdf | 25 Mar 2026 |
| Form 2File: 16 300625 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 16.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 16.pdf | 25 Mar 2026 |
| Form 1File: 17.pdf | 25 Mar 2026 |
| Form 2File: 17 300925 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 17.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 17.pdf | 25 Mar 2026 |
| Form 1File: 18.pdf | 25 Mar 2026 |
| Form 2File: 18 311225 Engineer Certificate.pdf | 25 Mar 2026 |
| Form 3File: 18.pdf | 25 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 18.pdf | 25 Mar 2026 |
| Copy of the legal title reportFile: VENKATESHWARA BUILDER LEGAL TITLE REPORT.pdf | 2 Aug 2021 |
| Declaration in FORM BFile: VENKATESHWARA BUILDER - FORM B.pdf | 2 Aug 2021 |
| Declaration about Commencement CertificateFile: Venkateshwara Builder form D (1).PDF | 15 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate NA Order.PDF | 14 Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VITTHAL NAGARI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAUJE AAPATGON1,400+ in Aurangabad
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: VENKATESHWARA BUILDERS & DEVELOPERS
VENKATESHWARA BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including VITTHAL NAGARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that VITTHAL NAGARI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VITTHAL NAGARI is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VITTHAL NAGARI?
The registered promoter entity is VENKATESHWARA BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VITTHAL NAGARI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VITTHAL NAGARI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VITTHAL NAGARI?
The professionals named in the filing: Architect: SUDHIR DIKKAR; Engineer: SUDHIR DIKKAR; Chartered Accountant: CHETAN NOGAJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VITTHAL NAGARI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback