VITTHAL LANDMARK
RG-MH-16998 · RERA P52100027650 · Last updated on MahaRERA portal: 26 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VITTHAL LANDMARK is a Others project by A V CORPORATION in Pune, Maharashtra, registered with MahaRERA as P52100027650 on 25 Dec 2020. Possession is promised by 30 Jun 2028.
At a glance
Project
- NameVITTHAL LANDMARK
- TypeOthers
- Location
- VITTHAL LANDMARK
- GAT NUMBER 701 PART (OLD 704)
- PUNE - NASHIK ROAD
- ALANDI PHATA
- OPPOSITE NAGESHWAR MANDIR
- MOSHI
- PUNE
- MOSHI PUNE
- Pimpri Chinchawad (M...
- Pincode411035
- RERA no.P52100027650
- ReraGenie IDRG-MH-16998
Builder
- NameA V CORPORATION
- Entity typePartnership
- PartnersBABANRAO VITTHAL MARNE, SANDEEP RAM PAWALE
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Dec 2020
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VITTHAL LANDMARK | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 20%.
VITTHAL LANDMARK: 38% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed94
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BALASAHEB NIVRUTI SASTE | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR UMESH NAMDE |
| Engineer | SHRIKANT J SONAWANE |
| Engineer | DEVIDAS GOVINDRAO NAIDU |
| Chartered Accountant | Ankita Subhash Bora |
| Chartered Accountant | CA GAUTAM SHARMA |
| Partner | Role in project |
|---|---|
| A V CORPORATION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 24-25 VL (1).pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 24-25 VL (1).pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 24-25 VL (1).pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 24-25 VL (1).pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24 VL.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Qtr 1 Form 3_.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Qtr 2 Form 3_.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Qtr 3 Form 3_.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Qtr 4 form 3_.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate 3rd 4 th qtr.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf | 15 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VITTHAL LlANDMARK FORM 5.pdf | 10 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar-2023_.pdf | 9 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June -2023_.pdf | 9 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept -2023_.pdf | 9 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec -2023_.pdf | 9 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5 Mar21.pdf | 8 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 Mar22.pdf | 8 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2021_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun 21_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep 21_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-21_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar-22_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun-22_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep-22_Sign.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-22_Sign.pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 20.pdf | 17 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 21.pdf | 17 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 22.pdf | 17 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosure.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Legal encumbrances.pdf | 16 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal encumbrances.pdf | 16 Feb 2023 |
| Declaration about Commencement CertificateFile: Commencement certificate.pdf | 16 Feb 2023 |
| CERSAI detailsFile: CERSAI.pdf | 16 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf | 16 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank declaration.pdf | 16 Feb 2023 |
| Other - LegalFile: Self declaration.pdf | 16 Feb 2023 |
| Layout approvalFile: MYSCAN_20220125_0005[1].PDF | 30 Jan 2022 |
| Layout approvalFile: 2MYSCAN_20220125.PDF | 30 Jan 2022 |
| Building plan approvalFile: 3 MYSCAN_20220125.PDF | 30 Jan 2022 |
| Building plan approvalFile: 4 MYSCAN_20220125.PDF | 30 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20220125_0005[1].PDF | 30 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: 2MYSCAN_20220125.PDF | 30 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 MYSCAN_20220125.PDF | 30 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 MYSCAN_20220125.PDF | 30 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 5 MYSCAN_20220125.PDF | 30 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 30 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-1-4_organized.pdf | 16 Dec 2020 |
| Declaration in FORM BFile: Form B -Promoter Affe_compressed.pdf | 16 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A.pdf | 16 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure A.pdf | 16 Dec 2020 |
| Proforma of Allotment letterFile: AGREEMENT DRAFT.pdf | 16 Dec 2020 |
| Layout approvalFile: IOD.pdf | 15 Dec 2020 |
| Building plan approvalFile: 701 NA_1.pdf | 15 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: IOD.pdf | 15 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 701 NA_1.pdf | 15 Dec 2020 |
| Building plan approvalFile: MYSCAN_20201106_0004.PDF | 5 Dec 2020 |
| Building plan approvalFile: LAYOUT 2.PDF | 5 Dec 2020 |
| Building plan approvalFile: LAY OUT 1.PDF | 5 Dec 2020 |
| Building plan approvalFile: PARKING LAYOUT.PDF | 5 Dec 2020 |
| PAN CardFile: FIRM PAN CARD.pdf | 5 Dec 2020 |
| Copy of the legal title reportFile: Search Report.pdf | 5 Dec 2020 |
| Details of encumbrancesFile: No Encubrance Certificate 1.pdf | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20201106_0004.PDF | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT 2.PDF | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: LAY OUT 1.PDF | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PARKING LAYOUT.PDF | 5 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf | 5 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rera Engineers Certificate_compressed.pdf | 5 Dec 2020 |
| Proforma of Allotment letterFile: PROVISINAL ALLOTMENT LETTER NEW Final.pdf | 5 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep VITTHAL LANDMARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOSHI PUNE13,700+ in Pune
YOO PRISTINE
M/S MEGAPILLAR REALTY LLP
ENVOGUE2
Zenethist Realty LLP
ONE PLATINUM
MATRIX DEVELOPERS
VITTHAL CAPITAL
M/S A. V. CORPORATION
Vasant Estella
SHRIKRISHNA WONDER PROPERTIES
MY HOME AKURDI
RAVET LAND DEVELOPERS LLP
Builder: A V CORPORATION
A V CORPORATION has 2 registrations on MahaRERA, including sundaram plaza and VITTHAL LANDMARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VITTHAL LANDMARK is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VITTHAL LANDMARK?
The registered promoter entity is A V CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VITTHAL LANDMARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VITTHAL LANDMARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VITTHAL LANDMARK?
The professionals named in the filing: Architect: AR UMESH NAMDE; Engineer: SHRIKANT J SONAWANE; Engineer: DEVIDAS GOVINDRAO NAIDU; Chartered Accountant: Ankita Subhash Bora; Chartered Accountant: CA GAUTAM SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VITTHAL LANDMARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback