Home / Browse projects / Pune, Maharashtra / VISTARA

Completed No litigation declared Residential / Group Housing project

VISTARA

By Buildstrong Estate Realtors LLP

RG-MH-13196 · RERA P52100022491 · Last updated on MahaRERA portal: 3 Oct 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

VISTARA is a Residential / Group Housing project by Buildstrong Estate Realtors LLP in Pune, Maharashtra, registered with MahaRERA as P52100022491 on 25 Sep 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameVISTARA
  • TypeResidential / Group Housing
  • Location
    • Newale Vasti
    • Chikhali
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022491
  • ReraGenie IDRG-MH-13196

Builder

  • NameBuildstrong Estate Realtors LLP
  • Entity typePartnership
  • PartnersSuresh Panjabi, Ankush Panjabi, Sunil Panjabi, Nanik Panjabi, Vinesh Panjabi

Key dates

this monthRegisteredSep 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Sep 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered36
Open Space31

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4276.11
Proposed, not sanctioned3,930 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaratha Chambers, Plot No 3, Sector 25, Pradhikaran, Bhel Chowk, Nigdi, 411044 Pune MH

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Design Group
EngineerG.A Bhilare consultants
Chartered AccountantL B Laddha & Co
Chartered AccountantCA Madhusudan Jhanwar
PartnerRole in project
Buildstrong Estate Realtors LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012862Dec 2022 → Jun 2023

Reason as filed by the promoterThe municipal authorities initiated the laying of water pipeline, the path of which passes through the road that abuts our project location. Due to this activity, the approach road to the site has been dug up, blocking all kinds of heavy vehicles movement and which in turn blocks material transport to the site of our project "Vistara". This work has been ongoing since 8 Aug 2022 and has delayed our scheduled activities that were otherwise planned to be carried out. Due to unexpected and prolonged run of the rainy season, our schedule for the external paint job, waterproofing, and other allied

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jun 2023

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GE 162_BSR_Form 5_22-23.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 23 24 Q1.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23 24 Q1.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 23 24 Q1.pdf10 Jul 2023
OtherFile: Form 2A FY 23 24 Q1.pdf10 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_Vistara.pdf26 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_LDG Letter.pdf26 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 2223 Q4 FORM 2 EC.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2223 Q4 FORM 3.pdf10 Apr 2023
OtherFile: FY 2223 Q4 FORM 2A QC.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 2223 Q4 FORM 1 AC.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 06-01-2023.pdf6 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259670077_For_Debtor_Based_Search_06_02_2023_19_29_14_393.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 2223 Q3 FORM 1 AC .pdf12 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 2223 Q3 FORM 2 EC.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 21 22 q4.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2223 Q3 FORM 3 CAC .pdf12 Jan 2023
OtherFile: FY 2223 Q3 FORM 2A QAC.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 2223 Q2 FORM 1 AC .pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 2223 Q2 FORM 2 EC .pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2223 Q2 FORM 3 CAC .pdf13 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GE 162_BSR_Form 5_21-22.pdf13 Oct 2022
OtherFile: FY 2223 Q2 FORM 2A QAC.pdf13 Oct 2022
OtherFile: GE 162_BSR_Form 5_21-22.pdf17 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 11-07-2022.pdf14 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 2223 Q1 FORM 1 AC_Revised.pdf11 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FY 2223 Q1 FORM 2 EC.pdf11 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2223 Q1 FORM 3 CAC .pdf11 Jul 2022
OtherFile: FY 2223 Q1 FORM 2A QAC.pdf11 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Declaration for Incorrect CC.pdf3 Jun 2022
OtherFile: Declaration for Incorrect CC.pdf31 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 18-05-2022.pdf18 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Vistara Society Registration Certificate.pdf18 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate dtd 09-09-2020.pdf4 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_08-04-2022.pdf12 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_09-04-2022.pdf12 Apr 2022
OtherFile: Form 2A FY 21 22 q4.pdf11 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_07-04-2022.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_09-12-2019.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_18-06-2020.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_13-03-2020.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_24-03-2021.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_24-09-2020.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_24-12-2020.pdf6 Apr 2022
OtherFile: STP NOC from Drainage dept_1-10-2021.pdf31 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200233263931_For_Debtor_Based_Search_24_03_2022_12_12_00_070.pdf24 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GE 458 Buildstrong Estate Realtors.pdf24 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GE 459 Buildstrong Estate Realtors.pdf24 Mar 2022
Layout approvalFile: Revised Layout 1.pdf23 Mar 2022
Building plan approvalFile: Revised Layout 2 (4 files merged).pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: Revised Layout 1.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Layout 2 (4 files merged).pdf23 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: 20211026164727.pdf23 Mar 2022
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate 1.pdf23 Mar 2022
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate 2.pdf23 Mar 2022
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate 3.pdf23 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-RERA.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_01102020.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_02012021.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_08042021.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_23062021.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_24072021.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_28102021.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_30112021.pdf23 Mar 2022
Disclosure of sold/ booked inventoryFile: Inventory.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_24-07-2021.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_05-10-2020.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_16-01-2021.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_14-04-2021.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_17-03-2020.pdf23 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Q3_Oct 19 to Dec 19.pdf19 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Q4_Jan 20 to March 20.pdf19 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Q1_April 20 to June 20.pdf19 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Q2_July 20 to Sept 20.pdf19 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Q3_Oct 20 to Dec 20.pdf19 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Q4_Jan 21 to March 21.pdf19 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_03-01-2022.pdf5 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_05-01-2022.pdf5 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_13-10-2021.pdf16 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_01-10-2021.pdf16 Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISTARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmVISTARACompleted 55Lapsed / revoked 30Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 119 registered projects within 2 km.

Builder: Buildstrong Estate Realtors LLP

Buildstrong Estate Realtors LLP has 1 registration on MahaRERA, including VISTARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VISTARA is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISTARA?

The registered promoter entity is Buildstrong Estate Realtors LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISTARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISTARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISTARA?

The professionals named in the filing: Architect: Landmark Design Group; Engineer: G.A Bhilare consultants; Chartered Accountant: L B Laddha & Co; Chartered Accountant: CA Madhusudan Jhanwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISTARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISTARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISTARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.