ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Vista Heights

Registered Litigation declared Others project

Vista Heights

By Mahendra Tambaram Patel

RG-MH-86710 · RERA P52000047480 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 14 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 14 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 30%
1Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

Vista Heights is a Others project by Mahendra Tambaram Patel in Raigarh, Maharashtra, registered with MahaRERA as P52000047480 on 2 Nov 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 14 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVista Heights
  • TypeOthers
  • Location
    • Sector 18
    • Ulwe
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000047480
  • ReraGenie IDRG-MH-86710

Builder

  • NameMahendra Tambaram Patel
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2022First promiseOct 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Nov 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Oct 2025)
  • Buildings1 building record
  • Documents filed96 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vista HeightsNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 30%.

Vista Heights: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes2%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered12
Open Space2

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,050 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Kaushik Realtechs LimitedNavi Mumbai (M Corp.)Thane
Shardul Anil KaushikNavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI2598.5
Proposed, not sanctioned1,155 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 62 & 63,PATEL HERITAGE,SEC7,KHARGHAR 410210

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShardul Anil Kaushik
EngineerBS Sukhtankar
Chartered AccountantRutuja Narsingh and Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Mahendra Tambaram Patel-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000028190Oct 2025 → Dec 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work

Litigation declared6

CaseCourtStatus
117/2010Hon'ble Civil Judge Senior Division, PanvelOngoing
20/2021Hon'ble District and Addl Sessions Judge at PanvelClosed
14459/2022Hon'ble Bomhay High CourtOngoing
269/2013Hon'ble Civil Judge Senior Division, PanvelOngoing
12/2021Hon'ble Civil Judge Senior Division, PanvelOngoing
124/2020Hon'ble Civil Judge Senior Division, PanvelOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408463Hitesh Rajaram SawantMahendra Tambaram Patel13/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Sep 2025.pdf4 Jun 2026
Form 2File: Form 2 Sep 25.pdf4 Jun 2026
Form 3File: Form 3 Sep 25_compressed.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 Sep 25.pdf4 Jun 2026
Form 5 (FY 2024-2025)File: Form 5_24_25.pdf4 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 VH.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VH.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VH.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 March 2025.pdf12 May 2025
Other - TechnicalFile: DocScanner 12 May 2025 13-05.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 25.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29 Dec 24.pdf14 Apr 2025
Declaration about Commencement CertificateFile: Format D.pdf14 Apr 2025
Other - TechnicalFile: PERT Vista.pdf14 Apr 2025
Building plan approvalFile: Approved Drawings (3)-1-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-2-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-3-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-4-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-5-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-6-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-7-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-8-compressed.pdf4 Apr 2025
Building plan approvalFile: Approved Drawings (3)-9 (1).pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 2024.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 2024.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept 2024 - 2.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2024 - 2.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept 2023.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 2023.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 23.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 2022.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 23.pdf4 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Certificate .pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-4-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-9 (1).pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-8-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-7-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-6-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-5-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-3-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-2-compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawings (3)-1-compressed.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: DocScanner 4 Apr 2025 15-06 (1).pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: march 23.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2023.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 2023.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 2023.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 2024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 2024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 2022.pdf3 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf3 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 dec 22.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 march 23.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 june 23.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 sept 23.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 dec 23.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 march 24.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 JUNE 24.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 sept 24.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 dec 24.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FOR M 2 A 22-23.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf26 Mar 2025
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.pdf22 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Legal.pdf22 Dec 2023
Declaration in FORM BFile: affidfavit KRL_001.pdf22 Dec 2023
Declaration in FORM BFile: affidfavit mahendra p_001.pdf22 Dec 2023
Other - TechnicalFile: MAHA RERA DOC_001.pdf22 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Scan2022-10-11_171119.pdf11 Oct 2022
Layout approvalFile: PLAN -14A- Surya Constructions_compressed.pdf1 Oct 2022
Building plan approvalFile: PLAN -14A- Surya Constructions_compressed (1)-1.pdf1 Oct 2022
Building plan approvalFile: PLAN -14A- Surya Constructions_compressed (1)-2.pdf1 Oct 2022
Building plan approvalFile: PLAN -14A- Surya Constructions_compressed (1)-3.pdf1 Oct 2022
Copy of the legal title reportFile: Legal Title Report- Surya Construction_compressed (1).pdf1 Oct 2022
Copy of Layout Approval (in case of layout)File: PLAN -14A- Surya Constructions_compressed.pdf1 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN -14A- Surya Constructions_compressed (1)-1.pdf1 Oct 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 14 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vista Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulwe5,900+ in Raigarh

Builder: Mahendra Tambaram Patel

MAHENDRA TAMBARAM PATEL has 4 registrations on MahaRERA, including SURYA RESIDENCY and SURYA MAURYA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Vista Heights is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vista Heights?

The registered promoter entity is Mahendra Tambaram Patel, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vista Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vista Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vista Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vista Heights?

The professionals named in the filing: Architect: Shardul Anil Kaushik; Engineer: BS Sukhtankar; Chartered Accountant: Rutuja Narsingh and Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vista Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vista Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vista Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.