ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Visions Indradhanu Phase 2

Completed No litigation declared Residential / Group Housing project

Visions Indradhanu Phase 2

By VISION DEVELOPERS

RG-MH-02335 · RERA P52100001900 · Last updated on MahaRERA portal: 20 Dec 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2018Possession promisedregistration recorded completed
39 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

Visions Indradhanu Phase 2 is a Residential / Group Housing project by VISION DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100001900 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2018. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVisions Indradhanu Phase 2
  • TypeResidential / Group Housing
  • Location
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001900
  • ReraGenie IDRG-MH-02335

Builder

  • NameVISION DEVELOPERS
  • Entity typePartnership
  • PartnersMITTAL NITESHKUMAR PATEL, CHETANKUMAR JAYANTIBHAI PATEL, NITESHKUMAR SURESHBHAI PATEL, HITESHKUMAR LADHABHAI PATEL, JIGNESHKUMAR JETHALAL MAKANI, RASMIKA PRAVINBHAI PATEL, KINJALKUMAR NANDLAL PATEL, SHRILEKHABEN VIPULKUMAR BHAVANI
  • Other registrations12 more →
  • Completed5 of 13
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2017PromisedSep 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Sep 2018
  • Revised completionNone
  • Buildings4 building records
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA140000
B BUILDINGNA140000
C BUILDINGNA20000
D BUILDINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes40%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered55
BuildingClosed/CoveredTotal
A BUILDING2525
B BUILDING3030

Land and ownership10

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,305 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
LandownerVillageDistrict
BABUBAI KISAN JAMBHULKARPimpri Chinchawad (M Corp.)Pune
SOPAN SHANKAR JADHAVPimpri Chinchawad (M Corp.)Pune
MADHUKAR SHANKAR JADHAVPimpri Chinchawad (M Corp.)Pune
ASHOK SHANKAR JADHAVPimpri Chinchawad (M Corp.)Pune
KISAN VITHOBA JAMBHULKARPimpri Chinchawad (M Corp.)Pune
MARUTI KISAN JAMBHULKARPimpri Chinchawad (M Corp.)Pune
DNYANOBA KISAN JAMBHULKARPimpri Chinchawad (M Corp.)Pune
RAVINDRA MARUTI JAMBHULKARPimpri Chinchawad (M Corp.)Pune
KIRAN MARUTI JAMBHULKARPimpri Chinchawad (M Corp.)Pune
SANTOSH DNYANESHWAR JAMBHULKARPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI9822.35
Proposed, not sanctioned9,822 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTharmax Chowk, Shambhaji Nagar, Chinchwad, Pune, Maharashtra

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Thakur And Associates
EngineerSARVASIDHDHANT CONSULTANTS
PartnerRole in project
VISION DEVELOPERS-

Litigation declared1

CaseCourtStatus
152/2016/2016JMFC Court Pimpriunready board

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000022653Pratapsinh KaleVision Developers19/02/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Conveyance Deed Vision Indradhanu ph-2 index 2.pdf20 Dec 2021
Certificates of CA (Form 5)File: Form No 05 Vision Developers.pdf3 Oct 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Vision's Indradhanu PH-II- Society Formation Certificate.pdf3 Oct 2018
Certificates of Architect (Form 4)File: A - Wing .pdf13 Jul 2018
Certificates of Architect (Form 4)File: B - Wing.pdf13 Jul 2018
Certificates of Architect (Form 4)File: C- Wing .pdf13 Jul 2018
Certificates of Architect (Form 4)File: D- Wing.pdf13 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 01 Vision Developers 30 03 2018.pdf4 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 02 Vision Developers 30 03 2018.pdf4 Apr 2018
Certificates of CA (Form 3)File: Form No 03 Vision Developers 31 03 2018 Scanned .pdf4 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 01 Dated 30 09 2017(Vision Developers).pdf13 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 02 (Vision Developers).pdf26 Jul 2017
Certificates of CA (Form 3)File: Form No 03 (Vision Developers ) 25 07 2017.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 1 (Vision Developers).pdf24 Jul 2017
Proforma of Allotment letterFile: Vision Indradhanu Phase II_Flat Agreement_RERA_21-07-17 (1).pdf22 Jul 2017
Declaration in FORM BFile: Form No B (Vision Developers).pdf21 Jul 2017
Details of encumbrancesFile: Encumbrances and Litigateion NOC (Vision Developers).pdf20 Jul 2017
Layout approvalFile: Layout Plan Final Phase 2.pdf25 Jun 2017
Building plan approvalFile: IOD layout.pdf25 Jun 2017
PAN CardFile: pancard vision developers.pdf25 Jun 2017
Copy of the legal title reportFile: Title Search Report Vision Developers phase 2(11 02 2016).pdf25 Jun 2017
Copy of Layout Approval (in case of layout)File: Layout Plan Final Phase 2.pdf25 Jun 2017
Building Plan Approval (IOD)File: IOD layout.pdf25 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: C C FINAL 22 12 2016( Visions Indradhanu phase 2) for rera .pdf25 Jun 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Visions Indradhanu Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Chinchawad (M Corp.)13,700+ in Pune

2 kmVisions Indradhanu PhaseCompleted 45Lapsed / revoked 25Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: VISION DEVELOPERS

VISION DEVELOPERS has 13 registrations on MahaRERA, including Visions Indradhanu Phase 2 and VISION ETERNITY. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Visions Indradhanu Phase 2 is delayed beyond 30 Sep 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Visions Indradhanu Phase 2?

The registered promoter entity is VISION DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Visions Indradhanu Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Visions Indradhanu Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Visions Indradhanu Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Visions Indradhanu Phase 2?

The professionals named in the filing: Architect: Mahendra Thakur And Associates; Engineer: SARVASIDHDHANT CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Visions Indradhanu Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Visions Indradhanu Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Visions Indradhanu Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.