Home / Browse projects / Dakshina Kannada, Karnataka / Vishwas Carlbenz

Registration approved Residential/Group Housing project

Vishwas Carlbenz

By Vishwas Bawa Builders

RG-KA-01962 · RERA PRM/KA/RERA/1257/334/PR/181219/002233

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 43 documents Report an error

Vishwas Carlbenz is a Residential/Group Housing project by Vishwas Bawa Builders in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/181219/002233 on 19 Dec 2018. Possession is promised by 23 Dec 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameVishwas Carlbenz
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/181219/002233
  • ReraGenie IDRG-KA-01962

Builder

  • NameVishwas Bawa Builders
  • Entity typePartnership Firm
  • Authorized SignatoryAbdul Rauf Puthige
  • OthersP S A Basheer
  • Other registrations5 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredDec 2018First promiseDec 2019Revised toDec 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Dec 2018
  • Promised completion23 Dec 2020
  • Revised completionRevised to 23 Dec 2020 (originally 23 Dec 2019)
  • Buildings1 building record
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
vishwas carl benz---45045

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,538 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.97 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK Damodar Shenoy
EngineerK Anand Bhat

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/220620/002233Dec 2019 → Dec 2020

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/181219/002233 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: arc completed works.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: percentage of comoletion_1.pdf-
CA Certificate for Funds UtilizationFile: ca funds utilixed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: arc pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: percentage of pending works.pdf-
CA Certificate for Funds required for Project CompletionFile: ca funds required.pdf-
AffidavitFile: affidavith.pdf-
Latest Encumbrance CertificateFile: ec-min.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Commencement Certificate-
Building Plan-
Building Plan-
Proforma for Sale Deed-
Proforma for Agreement to sale-
Sale Deed-
Building Plan-
Building Plan-
Proforma Allotment-
Broucher and Specifications-
NOC-
Broucher and Specifications-
Encumbrance Certificate-
Khatha-
Joint_Development_Agreement-ilovepdf-compressed-il (1)-
Conversion Order-
Building Plan-
Balance Sheet 2016 - 2017File: Balance Sheet 2017.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2016.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2015.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit and Loss Account 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and Loss 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss Account 2015.pdf-
Cash Flow Statement 2016 - 2017File: Cash flow 2017.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow 2016.pdf-
Auditor's Report 2016 - 2017File: Auditors Report 2017.pdf-
Auditor's Report 2015 - 2016File: Audit Report 2016.pdf-
Auditor's Report 2014 - 2015File: Audit Report 2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income Tax Accknowledgement 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income tax acknowledgement 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Income tax acknowledgement 2015.pdf-
Declaaration-
Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_181219_002233.xlsx-

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Vishwas Sathyam-Completed-No date filed
Vishwas Neha Residency-Completed-No date filed
Vishwas Green View-Completed-No date filed
Vishwas Crystal-Completed-No date filed
Vishwas Anmol-Completed-No date filed

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Vishwas Carlbenz on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Vishwas Bawa Builders

VISHWAS BAWA BUILDERS has 6 registrations on RERA Karnataka, including VISHWAS ALEXANDER ALI HEIGHTS and Vishwas Lalita Residency. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Vishwas Carlbenz is delayed beyond 23 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Vishwas Carlbenz?

The registered promoter entity is Vishwas Bawa Builders, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Vishwas Carlbenz?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Vishwas Carlbenz?

The professionals named in the filing: Architect: K Damodar Shenoy; Engineer: K Anand Bhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vishwas Carlbenz?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vishwas Carlbenz. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vishwas Carlbenz to a free account