VISHWAKARMA ARVIND

By VISHWAKARMA BUILD-CON LLP

RG-MH-65544 · RERA P53000054810 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
31 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

VISHWAKARMA ARVIND is a Residential / Group Housing project by VISHWAKARMA BUILD-CON LLP in Kolhapur, Maharashtra, registered with MahaRERA as P53000054810 on 12 Feb 2024. Possession is promised by 31 Dec 2027. 11 of the 42 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameVISHWAKARMA ARVIND
  • TypeResidential / Group Housing
  • Location
    • E WARD TARABAI PARK
    • NEAR KRUPLANI HOSPITAL
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000054810
  • ReraGenie IDRG-MH-65544

Builder

  • NameVISHWAKARMA BUILD-CON LLP
  • Entity typeOthers
  • Named personsSHANKAR MARUTI GAVADE, NIKHIL SHANKAR GAVADE, SUDHAKAR CHANDRAKANT SURVASE, MADHUKAR CHANDRAKANT SURVASE

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

26%11 of 42 units booked
105.9%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VISHWAKARMA ARVINDNA8642042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VISHWAKARMA ARVIND: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered93

Land and ownership24

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,015 sq m
Land owned byThe promoter, with other names on the file
Named landowners24
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
SUCHETA RAJIV SHAHAndheriMumbai Suburban
SANJIV ARVIND SHAHAndheriMumbai Suburban
MILIND NARAYAN APATEPune (M Corp.)Pune
SHASHIKANT NARAYAN APATEKolhapur (M Corp.)Kolhapur
SURESH MUKUND JADHAVKolhapur (M Corp.)Kolhapur
RAMESH ARJUNDAS BASARANIKolhapur (M Corp.)Kolhapur
MAYA RAMESHLAL NARSINGHANIKolhapur (M Corp.)Kolhapur
PAMMIDEVI MOHANLAL NARSINGHANIKolhapur (M Corp.)Kolhapur
RAJ PRAKASH BASARANIKolhapur (M Corp.)Kolhapur
SUNIL ARJUNDAS BASARANIKolhapur (M Corp.)Kolhapur
ASHISH JANARDAN THORATKolhapur (M Corp.)Kolhapur
MANOHAR MEVALDAS GIDWANIKolhapur (M Corp.)Kolhapur
AKIL NIJAM TAKILDARKolhapur (M Corp.)Kolhapur
KAMAL ALIS KAMLESH AMRUTLAL DAVEKolhapur (M Corp.)Kolhapur
PRATAPRAO SATAPPA KAMATKolhapur (M Corp.)Kolhapur
HEMANT PRATAPRAO KAMATKolhapur (M Corp.)Kolhapur
ABHIJIT PRATAPRAO KAMATKolhapur (M Corp.)Kolhapur
PRASAD PRATAPRAO KAMATKolhapur (M Corp.)Kolhapur
SARJERAO KESHAVRAO BHOSALEKapashiKolhapur
MAYA SARJERAO BHOSALEKapashiKolhapur
NAMRATA NITIN KAMBALEChikhaliKolhapur
NITIN NANA KAMBALEChikhaliKolhapur
VISHWAS LAXMAN RUKADIKARKolhapur (M Corp.)Kolhapur
ABIGEL VISHWAS RUKADIKARKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKOLHAPUR MUNICIPAL CORPORATION
Permissible FSI3247.47
Proposed, not sanctioned3,247 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC S NO 2073, GROUND FLOOR, SUBHADRA MARUTI ENCLAVE, RAJARAMPURI 13TH LANE E WARD KOLHAPUR 416003
Estimated costRs 10.00 cr
Cost incurredRs 10.59 cr
Work done105.89%
BuildingWingEstimatedIncurred
VISHWAKARMA ARVINDNARs 9.00 crRs 9.64 cr
-NARs 1.00 crRs 95.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHLAND THROUGH SAMBHAJI PATIL
EngineerASHISH JANARDAN GAIKWAD
Chartered AccountantSDAS AND CO THROUGHANIRUDDHA DESHPANDE
Chartered AccountantAmit Shah and Co
PartnerRole in project
VISHWAKARMA BUILD-CON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - 2024-2025 Vishwakarma Buildcon.pdf5 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf5 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf5 Aug 2025
Withdrawal Update Form 3File: CA 1.pdf5 Aug 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory (2).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold_compressed.pdf4 Mar 2025
Building plan approvalFile: Plan 1_11zon (1).pdf5 Dec 2024
Building plan approvalFile: Plan 2_11zon (1).pdf5 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1_11zon (1).pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_11zon (1).pdf5 Dec 2024
Declaration about Commencement CertificateFile: Format D_0001.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf8 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vishwakarma Arvind Form 5.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 1.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EN 1.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold .pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 1.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (7).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate NEW.pdf3 Feb 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf25 Jan 2024
Layout approvalFile: Orginal Layout.pdf20 Jan 2024
Building plan approvalFile: Sanction PLan 1.pdf20 Jan 2024
Building plan approvalFile: Sanction Plan 2.pdf20 Jan 2024
Building plan approvalFile: Sanction Plan 3.pdf20 Jan 2024
PAN CardFile: PAN Card.pdf20 Jan 2024
Copy of the legal title reportFile: Legal Title and Search Report.pdf20 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Finance.pdf20 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Legal.pdf20 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Finance.pdf20 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Legal.pdf20 Jan 2024
Copy of Layout Approval (in case of layout)File: Orginal Layout.pdf20 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction PLan 1.pdf20 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf20 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Jan 2024
Declaration in FORM BFile: Form B Declaration - Promoter.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf20 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf20 Jan 2024
Proforma of Allotment letterFile: Allottment Letter - New.pdf20 Jan 2024
Proforma of Agreement for saleFile: Agreement to Sell for rera submiteed (1).pdf20 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf20 Jan 2024
Deviation Report with respect to Allotment letterFile: No Deviation - Allotment Letter.pdf20 Jan 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement to Sell.pdf20 Jan 2024

How this compares with Kolhapur

26%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep VISHWAKARMA ARVIND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KRUPLANI HOSPITAL880+ in Kolhapur

2 kmVISHWAKARMA ARVINDCompleted 59Lapsed / revoked 31Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 156 registered projects within 2 km.

Builder: VISHWAKARMA BUILD-CON LLP

VISHWAKARMA BUILD-CON LLP has 1 registration on MahaRERA, including VISHWAKARMA ARVIND. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if VISHWAKARMA ARVIND is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWAKARMA ARVIND?

The registered promoter entity is VISHWAKARMA BUILD-CON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWAKARMA ARVIND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWAKARMA ARVIND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWAKARMA ARVIND?

The professionals named in the filing: Architect: ARCHLAND THROUGH SAMBHAJI PATIL; Engineer: ASHISH JANARDAN GAIKWAD; Chartered Accountant: SDAS AND CO THROUGHANIRUDDHA DESHPANDE; Chartered Accountant: Amit Shah and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWAKARMA ARVIND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWAKARMA ARVIND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWAKARMA ARVIND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.