ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / VISHWACON EMPIRE

Registered No litigation declared Residential / Group Housing project

VISHWACON EMPIRE

By VISHWACON ENGINEERS

RG-MH-57886 · RERA P52700052005 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 66 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 66 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 95%
7 of 34Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

VISHWACON EMPIRE is a Residential / Group Housing project by VISHWACON ENGINEERS in Satara, Maharashtra, registered with MahaRERA as P52700052005 on 13 Jul 2023. Possession is promised by 31 Dec 2030. The completion date has moved by 66 months from the original filing. 27 of the 34 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVISHWACON EMPIRE
  • TypeResidential / Group Housing
  • Location
    • KARANJE
    • KARANJE TARF
    • Karanje Tarf Satara (CT)
    • Satara
    • 415001
  • Pincode415001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700052005
  • ReraGenie IDRG-MH-57886

Builder

  • NameVISHWACON ENGINEERS
  • Entity typePartnership
  • PartnerAJIT VISHWAS KADAM
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2023First promiseJun 2025Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed91 files

Current status

79%27 of 34 units booked
104.4%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VISHWACON EMPIRENA7734034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

VISHWACON EMPIRE: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered34
Open Space28

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,374 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jan 2026
LandownerVillageDistrict
AMOL DILIP KIRDATKaranje Tarf Satara (CT)Satara
ASHALATA UDDHAV NIKAMKaranje Peth Satara (CT)Satara
CHETAN RAMAKANT PISALKaranje Peth Satara (CT)Satara
DATTATRAY NAMADEV PISALKaranje Peth Satara (CT)Satara
AMIT KISHOR PISALKaranje Peth Satara (CT)Satara
KAMAL NAMDEV PISALKaranje Peth Satara (CT)Satara
MALAN GUJABA MOREGodoli (CT)Satara
NALANI TATYASAHEB DHANENinamSatara
NIKETAN KISHOR PISALKaranje Peth Satara (CT)Satara
PAVITRA RAMAKANT PISALKaranje Peth Satara (CT)Satara
SEEMA NITIN BHOSALEBhuinjSatara
SHALAN APPASAHEB THORATKalantrewadiSatara
SHALAN DILIP KIRDATKaranje Tarf Satara (CT)Satara
SURAJ DILIP KIRDATKaranje Tarf Satara (CT)Satara
VARSHA KISHOR PISALKaranje Peth Satara (CT)Satara
VATSALA BABANRAO DUBALShahupuri (CT)Satara
VIJAYA SAMPATRAO PAWARShahupuri (CT)Satara
VIJAYA SAMPARTAO PAWARShahupuri (CT)Satara

Approvals and building plan

Permissible FSI3055.4
Proposed, not sanctioned3,055 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSATARA
Estimated costRs 8.00 cr
Cost incurredRs 8.35 cr
Work done104.38%
BuildingWingEstimatedIncurred
VISHWACON EMPIRENARs 7.00 crRs 7.55 cr
-NARs 1.00 crRs 80.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUTUJA D KHARADE
EngineerDIPAK UDDHAVRAO MAHAMULKAR
Chartered AccountantCA JIVAN V JAGTAP
Chartered AccountantHARSHVARDHAN JAIDEEP JADHAV
PartnerRole in project
VISHWACON ENGINEERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15012619459Jun 2025 → Dec 2030

Reason as filed by the promoterWe are proposing to add one more wing in the project. Further Existing Wing in the project is 95% completed for which we are going to apply for Completion soon.

Litigation declared2

CaseCourtStatus
25/2023/2023CIVIL JUDGE SENIOR DIVISION SATARAUNDER HEARING
25/2023/2023CIVIL JUDGE SENIOR DIVISION SATARASETTELED

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000290010Malan Gujaba MoreAjit Vishwas Kadam03/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2 Q4_Final.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2 Q4_Final.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2 Q4_Final.pdf18 Aug 2026
Withdrawal Update Form 3File: Correction form 3.pdf18 Aug 2026
Withdrawal Update Form 3File: Correction form 3.pdf18 Aug 2026
Withdrawal Update Form 3File: Correction form 3.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4_Final.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Q4_Final.pdf15 May 2026
Withdrawal Update Form 3File: Form 3.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf5 May 2026
Withdrawal Update Form 1File: Form 1 Q3 2025-26.pdf5 May 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf5 May 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf5 May 2026
Withdrawal Update Form 3File: FORM 3_Q2.pdf5 May 2026
Withdrawal Update Form 3File: Form 3_Q3.pdf5 May 2026
Form 5 (FY 2024-2025)File: from 5 signed.pdf10 Dec 2025
Form 1File: FORM 1.pdf18 Oct 2025
Form 2File: FORM 2.pdf18 Oct 2025
Form 3File: FORM 3 FINAL_11zon.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q1.pdf18 Oct 2025
Form 1File: FORM 1.pdf1 Aug 2025
Form 2File: FORM 2.pdf1 Aug 2025
Form 3File: FORM 3_0001.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q4.pdf1 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Vishwacon Engineers - form 5.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE-20-10-24.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Nov 2023
Copy of the legal title reportFile: Legal title Report_NEW.pdf28 Jun 2023
Proforma of Agreement for saleFile: PROFORMA OF AGREEMENT OF SALE_.pdf28 Jun 2023
Declaration in FORM BFile: AMIT KISHOR PISAL.pdf19 Jun 2023
Declaration in FORM BFile: AMOL DILIP KIRDAT.pdf19 Jun 2023
Declaration in FORM BFile: ASHALATA UDDHAV NIKAM.pdf19 Jun 2023
Declaration in FORM BFile: CHETAN RAMAKANT PISAL.pdf19 Jun 2023
Declaration in FORM BFile: DATTARYA NAMDEV PISAL.pdf19 Jun 2023
Declaration in FORM BFile: KAMAL NAMDEV PISAL.pdf19 Jun 2023
Declaration in FORM BFile: MALAN GUJABA MORE.pdf19 Jun 2023
Declaration in FORM BFile: NALANI TYTYASAHEB DHANE.pdf19 Jun 2023
Declaration in FORM BFile: NIKETAN KISHOR PISAL.pdf19 Jun 2023
Declaration in FORM BFile: PAVITRA RAMAKANT PISAL.pdf19 Jun 2023
Declaration in FORM BFile: SEEMA NITINN PISAL - BHOSALE.pdf19 Jun 2023
Declaration in FORM BFile: SHALAN APPASAHEB THORAT.pdf19 Jun 2023
Declaration in FORM BFile: SHALAN DILIP KIRDAT.pdf19 Jun 2023
Declaration in FORM BFile: SURAJ DILIP KIRDAT.pdf19 Jun 2023
Declaration in FORM BFile: VARSHA KISHOR PISAL.pdf19 Jun 2023
Declaration in FORM BFile: VATSALA BABANARAO DUBAL.pdf19 Jun 2023
Declaration in FORM BFile: VIJAYA SAMPATRAO PAWAR.pdf19 Jun 2023
Building plan approvalFile: APPROVED PLAN.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN.pdf29 May 2023
Layout approvalFile: APPROVED PLAN.pdf27 May 2023
PAN CardFile: FIRM PAN.pdf27 May 2023
Details of encumbrances concerned to FinanceFile: legal Financial enc.pdf27 May 2023

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MAITRI VISHWAPANTACHA GOT SATARA1CompletedOct 2022Sep 2022
NACHIKET VISHWAKARANJE PETH1CompletedSep 2021Late, Nov 2021
GANESH VISHWAKARANJE TARF SATARA1CompletedMar 2020Feb 2020
MAYAKKA VISHWAPRATAP GANJ PETH1CompletedAug 2019Late, Oct 2019
SAHYADRI BIOTECHAT VILLAGE INDOLI1CompletedAug 2018Jul 2018
VITTHAL VISHWAKARANJE TERF SATARA1CompletedNov 2017Oct 2017
VENKATESH VISHWAAT SOMWAR PETH1CompletedJan 2015Jan 2015

How this compares with Satara

79%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 66 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep VISHWACON EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KARANJE TARF1,100+ in Satara

2 kmVISHWACON EMPIRECompleted 18Lapsed / revoked 11Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: VISHWACON ENGINEERS

VISHWACON ENGINEERS has 1 registration on MahaRERA, including VISHWACON EMPIRE. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if VISHWACON EMPIRE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWACON EMPIRE?

The registered promoter entity is VISHWACON ENGINEERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWACON EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VISHWACON EMPIRE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VISHWACON EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWACON EMPIRE?

The professionals named in the filing: Architect: RUTUJA D KHARADE; Engineer: DIPAK UDDHAVRAO MAHAMULKAR; Chartered Accountant: CA JIVAN V JAGTAP; Chartered Accountant: HARSHVARDHAN JAIDEEP JADHAV. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWACON EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWACON EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWACON EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.