ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / VIRGO

Registered No litigation declared Residential / Group Housing project

VIRGO

By VIRGO INFRASPACE PRIVATE LIMITED

RG-MH-98048 · RERA PR1180002502876 · Last updated on MahaRERA portal: 21 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedmoved 4 months from the original
1 of 10Construction stages donefurthest along: Staircases, 70%
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

VIRGO is a Residential / Group Housing project by VIRGO INFRASPACE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002502876 on 17 Mar 2026. Possession is promised by 31 Jul 2029. The completion date has moved by 4 months from the original filing.

At a glance

Project

  • NameVIRGO
  • TypeResidential / Group Housing
  • Location
    • New Link Road
    • KANDIVALI WEST
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002502876
  • ReraGenie IDRG-MH-98048

Builder

  • NameVIRGO INFRASPACE PRIVATE LIMITED
  • Entity typeCompany
  • CINU43299MH2023PTC403894
  • GSTIN27AAJCV4287G1ZV
  • DirectorsJAY ASHOK JOSHI, KRUPA JAY JOSHI

Key dates

this monthRegisteredMar 2026First promiseMar 2029Revised toJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Mar 2026
  • Promised completion31 Jul 2029
  • Revised completionRevised to 31 Jul 2029 (originally 31 Mar 2029)
  • Buildings1 building record
  • Documents filed12 files

Current status

6.7%Work done, per cost certificate

Figures as on 21 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIRGONA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 10 construction stages are filed complete. The stage furthest along is Staircases, at 70%.

VIRGO: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth60%
Stilt Floor60%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area273 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Feb 2026

Approvals and building plan

Sanctioning authorityMCGM
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG1, GROUND FLOOR, VALECHA CHAMBERS, PLOT B6, NEW LINK ROAD,, ANDHERI (WEST), MUMBAI, MAHARASHTRA-400053
Estimated costRs 5.16 cr
Cost incurredRs 34.38 lakh
Work done6.66%
BuildingWingEstimatedIncurred
VIRGONARs 4.88 crRs 34.38 lakh
-NARs 27.89 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKIT SHAH
EngineerKAMLESH SHINDE
Chartered AccountantMAMATA VAIBHAV MEHTA
Chartered AccountantHITESH RAMESH JAIN
PartnerRole in project
VIRGO INFRASPACE PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR1180002502876/WarMar 2029 → Jul 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2029

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A VIRGO JAYATI 2026.pdf21 Sep 2026
Withdrawal Update Form 1File: FORM 1 VIRGO 13072026.pdf29 Jul 2026
Withdrawal Update Form 2File: VIRGO JAYATI FORM 2 15072026.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3 withdrawal update virgo.pdf29 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 signed virgo march2026.pdf6 Jun 2026
Withdrawal Update Form 1File: Q1 VIRGO FORM 1.pdf12 May 2026
Withdrawal Update Form 2File: Q1 VIRGO FORM 2.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 withdrawal update virgo.pdf12 May 2026
Declaration and undertaking (Annexure A)File: ANNEXURE A (1).pdf6 Feb 2026
Building plan approvalFile: APPROVED IOD DRAWING 23092025.pdf5 Feb 2026
Declaration and undertaking (Annexure A)File: ANNEXURE A (1).pdf5 Feb 2026
Building plan approvalFile: APPROVED IOD DRAWING 23092025.pdf10 Dec 2025

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIRGO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

2 kmVIRGOCompleted 154Lapsed / revoked 103Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: VIRGO INFRASPACE PRIVATE LIMITED

VIRGO INFRASPACE PRIVATE LIMITED has 1 registration on MahaRERA, including VIRGO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VIRGO is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIRGO?

The registered promoter entity is VIRGO INFRASPACE PRIVATE LIMITED, a company as per the filing. Its CIN U43299MH2023PTC403894 and GSTIN 27AAJCV4287G1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIRGO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIRGO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIRGO?

The professionals named in the filing: Architect: ANKIT SHAH; Engineer: KAMLESH SHINDE; Chartered Accountant: MAMATA VAIBHAV MEHTA; Chartered Accountant: HITESH RAMESH JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIRGO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIRGO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIRGO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.