ViR ENCLAVE

By JKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED

RG-MH-33628 · RERA P51800049641 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 5%
0 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

ViR ENCLAVE is a Residential / Group Housing project by JKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049641 on 22 Feb 2023. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 17 of the 17 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameViR ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • TPS - III BORIVALI
    • KASTUR PARK SHIMPOLI
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049641
  • ReraGenie IDRG-MH-33628

Builder

  • NameJKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorVEERABHAI BECHARBHAI PRAJAPATI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredFeb 2023PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Feb 2023
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

100%17 of 17 units booked

Figures as on 3 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ViR EnclaveNA171710717

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 5%.

ViR Enclave: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed13

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots13
Closed/Covered13

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
BORIVALI ASIM CO-OP HOUSING SOCIETY LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1615.29
Proposed, not sanctioned1,615 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 MONICA ARCADE SUBHASH LANE OFF DAFTARY ROAD MALAD EAST, MUMBAI 400097

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG RAYANI
EngineerABHIJIT PHATARPERKAR AVP STRUCTURAL CONSULTANTS
Chartered AccountantJ C GATHANI & CO
PartnerRole in project
JKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VIR ENCLAVE 2A 31 3 25.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Asim Form 5 - 24-25.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASIM CHSL VIR ENCLAVE RERA FORM I MARCH 2025.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 ASIM 31-3-25 SIGNED UPLOADED.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure -ASIM PROJECT-31-3-25 -signed uploaded.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 asim vir enclave as on 30 09 2024.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: 30-9-24 - disclosure Asim.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: 30-9-24 - disclosure Asim (1).pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Asim - 2A- 30-9-2024.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Asim - 2A- 31-12-2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-9-24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: combinepdf.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: disclosure asim bvli-31-12-24-sold and invetory.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: june 24 sold booked inventory (1).pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: dec 23 booked inventory.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASIM CHSL VIR ENCLAVE RERA FORM I_250204_195442.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASIM CHSL VIR ENCLAVE RERA FORM I DEC 2024_250201_142110.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASIM CHSL VIR ENCLAVE RERA FORM I DEC 2024_250201_142110.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CN22GAC01K_025446.pdf10 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_240810_193152.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf9 Aug 2024
Declaration about Commencement CertificateFile: ASIM DISCLOSURE 30 6 24 RERA.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 asim 30 6 24.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASIM FORM 3 UPTO 30 6 24 UPLOADED ARUN.pdf6 Aug 2024
Home Buyer /Allottee Grievance Redressal CellFile: Board.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 ASIM.pdf24 Jun 2024
Declaration about Commencement CertificateFile: fULL cc dECLARATION.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: dISCLOSURE 31 3 24.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 31 3 24.pdf19 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC Asim.pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASIM CHSL VIR ENCLAVE RERA UPTO 31 03 2024.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: fORM 2a 31 3 24.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Scan03042024225659.pdf8 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEERS CERTIFICATE.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 asim borivali upto 31-12-23-signed uploaded.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASIM CHSL VIR ENCLAVE RERA UPTO 31 12 2023.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 31 12 2023.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CN22GAC01K_019493 (1).pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASIM-FORM 2 A-30-9-23.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASIM CHSL VIR ENCLAVE RERA UPTO 30 09 23.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: CN22GAC01K_017212.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: asim form3-upto30-9-23 uploaded.pdf30 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASIM-ANNECURE-B-FORM-2-WITHDRAWAL OF MONEY- CERT BY ENGINEER-31-3-23-SUB.pdf14 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASIM-ANNECURE-B-FORM-2-WITHDRAWAL OF MONEY- CERT BY ENGINEER-30-6-23-SUB (1).pdf14 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASIM-ANNECURE-C-FORM-2A-QUALITU ASSURANCE CERT BY ENGINEER-31-3-23-SUB.pdf14 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASIM-ANNECURE-C-FORM-2A-QUALITU ASSURANCE CERT BY ENGINEER-30-6-23-SUB (1).pdf14 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED INVENTORY AS ON 30-6-23 SUB.pdf14 Sep 2023
Disclosure of sold/ booked inventoryFile: asim-disclosure of sold-booked inventory-31-3-2023.pdf14 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: completion of work 31032023.pdf13 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: completion of work 30062023.pdf13 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Asim-form-3 upto30-6-23 finally uploaded.pdf12 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ASIM-FORM-5-31-3-23-FINAL UPLOADED-final.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jkd asim form-3 upto31-3-23 finally uploaded-29-6-23 (1).pdf5 Sep 2023
Declaration about Commencement CertificateFile: Declaration of commencement - Vir Enclave 3rd Floor.pdf29 Mar 2023
Copy of the legal title reportFile: title Certificate Marked - with markings.pdf27 Jan 2023
Copy of the legal title reportFile: Asim Title Ownership by Developer.pdf27 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other project - 27-1-2023.pdf27 Jan 2023
Details of encumbrances concerned to FinanceFile: encumb merged - nOTE (1).pdf23 Jan 2023
Details of encumbrances concerned to LegalFile: encumb merged - nOTE (1).pdf23 Jan 2023
CERSAI detailsFile: cersai with note.pdf23 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format -A 18-1-2023.pdf23 Jan 2023
Details of encumbrances concerned to FinanceFile: no financial encumb.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: no financial encumb.pdf18 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER TO MARK NO DEVIATION (1).pdf18 Jan 2023
Layout approvalFile: Asim Concession -with marking-1 (2).pdf17 Jan 2023
Layout approvalFile: Asim Concession -with marking-2.pdf17 Jan 2023
Layout approvalFile: Asim Concession -with marking-3.pdf17 Jan 2023
Layout approvalFile: Asim Concession -with marking-4.pdf17 Jan 2023
Layout approvalFile: Asim Concession -with marking-5.pdf17 Jan 2023
Layout approvalFile: Asim Concession -with marking-6.pdf17 Jan 2023
Layout approvalFile: parking explanation to RERA.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Asim Concession -with marking-1 (2).pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Asim Concession -with marking-2.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Asim Concession -with marking-3.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Asim Concession -with marking-4.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Asim Concession -with marking-5.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Asim Concession -with marking-6.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: parking explanation to RERA.pdf17 Jan 2023

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ViR ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASTUR PARK SHIMPOLI6,700+ in Mumbai Suburban

2 kmViR ENCLAVECompleted 135Lapsed / revoked 75Other 211Dot size: filed unitsN

Filed coordinates, straight-line distance. 421 registered projects within 2 km.

Builder: JKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED

JKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED has 3 registrations on MahaRERA, including KRISHNA KOYNA and ViR ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ViR ENCLAVE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ViR ENCLAVE is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ViR ENCLAVE?

The registered promoter entity is JKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ViR ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ViR ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ViR ENCLAVE?

The professionals named in the filing: Architect: CHIRAG RAYANI; Engineer: ABHIJIT PHATARPERKAR AVP STRUCTURAL CONSULTANTS; Chartered Accountant: J C GATHANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ViR ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ViR ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ViR ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.