Registered No litigation declared Residential / Group Housing project

VINAYAK AANGAN

By SHRI HARIKRISHNA ENTERRISES

RG-MH-06104 · RERA P52000052175 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Basement (if any), 85%
10 of 189Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

VINAYAK AANGAN is a Residential / Group Housing project by SHRI HARIKRISHNA ENTERRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000052175 on 27 Jul 2023. Possession is promised by 31 Dec 2028. 179 of the 189 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameVINAYAK AANGAN
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 3 SECTOR 5 PUSHPAK NAGAR
    • PUSHPAK NAGAR
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052175
  • ReraGenie IDRG-MH-06104

Builder

  • NameSHRI HARIKRISHNA ENTERRISES
  • Entity typePartnership
  • GSTIN27AEAFS2791C1Z4
  • PartnersKHIMJIBHAI HIRJIBHAI PATEL, SANGITA JITENDRA PATEL, Jitendra ramjibhai patel
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Current status

95%179 of 189 units booked

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINAYAK AANGANNA131316920189

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 85%.

VINAYAK AANGAN: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)100%
Plinth85%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks54%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.41%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,478 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Aug 2026

Approvals and building plan

Sanctioning authorityJitendra ramjibhai patel
Permissible FSI10108.85
Proposed, not sanctioned4,955 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBelapur

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA T U L PATEL ARCHITECTS
EngineerSK Consultants & Engineers
EngineerBalu Kundalik Rathod
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
SHRI HARIKRISHNA ENTERRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf10 Aug 2026
Form 1File: Form 1 - Vinayak Aangan as on June 2026.pdf24 Jul 2026
Form 2File: Form 2 - Vinayak Aangan as on June 2026.pdf24 Jul 2026
Form 3File: Form 3 - Vinayak Aangan as on June 2026.pdf24 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Vinayak Aangan as on June 2026.pdf24 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 - Vinayak Aangan for FY 2024-25.pdf6 Jun 2026
Form 1File: Form 1 -Vinayak Aangan as on March 2026.pdf15 Apr 2026
Form 2File: Form 2 -Vinayak Aangan as on March 2026.pdf15 Apr 2026
Form 3File: Form 3 -Vinayak Aangan as on March 2026.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Vinayak Aangan as on March 2026.pdf15 Apr 2026
Form 1File: Form 1 - Vinayak Aangan as on Dec 2025.pdf16 Jan 2026
Form 2File: Form 2 - Vinayak Aangan as on Dec 2025.pdf16 Jan 2026
Form 3File: Form 3 - Vinayak Aangan as on Dec 2025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Vinayak Aangan as on Dec 2025.pdf16 Jan 2026
Form 1File: Form 1 - Vinayak Aangan as on Sep 2025.pdf20 Oct 2025
Form 2File: Form 2 - Vinayak Aangan as on Sep 2025.pdf20 Oct 2025
Form 3File: Form 3 - Vinayak Aangan as on Sep 2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Vinayak Aangan as on Sep 2025.pdf20 Oct 2025
Form 1File: Form 1 - Vinayak angan as on June 2025.pdf8 Aug 2025
Form 2File: Form 2 - Vinayak Aangan as on June 2025.pdf8 Aug 2025
Form 3File: Form 3 - Vinayak Aangan as on June 2025.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Vinayak Aangan as on June 2025.pdf8 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vinayak Aangan as on March 2025.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on 31-03-2025.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on March 2025.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on 31-03-2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on 31-12-2024 Previously Uploaded.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on 31-12-2024 Previously Uploaded.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vinayak Aangan as on March 2025.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vinayak Aangan as on 31-12-2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on 31-12-2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on 31-12-2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on March 2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on June 2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vinayak Aangan as on Sep 2024.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on March 2024.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on June 2024.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vinayak Aangan as on Sep 2024.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Vinayak Aangan for FY 2023-24.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vinayak Aangan as on Sep 2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VINAYAK AANGAN.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VINAYAK AANGAN CA CERTIFICATE.pdf8 Apr 2024
Other - LegalFile: VINAYAK AANGAN.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2903 NEW.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2903.pdf29 Mar 2024
Building plan approvalFile: NEW CC 3-5 DRW_compressed-1-2.pdf10 Jan 2024
Building plan approvalFile: NEW CC 3-5 DRW_compressed-5-6.pdf10 Jan 2024
Building plan approvalFile: NEW CC 3-5 DRW_compressed-3-4-1.pdf10 Jan 2024
Building plan approvalFile: NEW CC 3-5 DRW_compressed-3-4-2.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NEW CC 3-5 DRW_compressed-1-2.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NEW CC 3-5 DRW_compressed-5-6.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NEW CC 3-5 DRW_compressed-3-4-1.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NEW CC 3-5 DRW_compressed-3-4-2.pdf10 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NEW CC 3-5.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate (1).pdf15 Dec 2023
Proforma of Allotment letterFile: ANNEXTURE A PROJECT.pdf5 Jul 2023
Proforma of Allotment letterFile: Rera Act -Agreement for Sale (2).pdf3 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT UPDATED.pdf3 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA LETTER_NEW.pdf14 Jun 2023
Layout approvalFile: pushpak agreement 1-25.pdf12 Jun 2023
Building plan approvalFile: 1.pdf12 Jun 2023
Building plan approvalFile: 2.pdf12 Jun 2023
Building plan approvalFile: 3.pdf12 Jun 2023
PAN CardFile: shri harikrishna enterprises.pdf12 Jun 2023
Copy of the legal title reportFile: TITLE CERTIFICATE_compressed.pdf12 Jun 2023
Copy of the legal title reportFile: SEARCH CERTIFICATE.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: LEGAL DECLARATION.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: LEGAL DECLARATION.pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: pushpak agreement 1-25.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf12 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 3-5-PUSHPAK-CC.pdf12 Jun 2023
Declaration about Commencement CertificateFile: CC DECLARATION.pdf12 Jun 2023
Declaration in FORM BFile: FORM B DECLARATON.pdf12 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3-5-PUSHPAK RERA.pdf12 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan 09 Jun 2023 (1).pdf12 Jun 2023
CERSAI detailsFile: CERSAI ALL.pdf12 Jun 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VINAYAK AMRUTPLOT NO 6 SECTOR 18 TALOJA NAVI MUMBAI33-OngoingDec 2026Not due yet
VINAYAK AVADHP52000020111KARANJADE, Raigarh108Mar 2019CompletedMar 2025Mar 2024

How this compares with Raigarh

95%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINAYAK AANGAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK NAGAR5,900+ in Raigarh

2 kmVINAYAK AANGANCompleted 11Lapsed / revoked 14Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 135 registered projects within 2 km.

Builder: SHRI HARIKRISHNA ENTERRISES

SHRI HARIKRISHNA ENTERRISES has 1 registration on MahaRERA, including VINAYAK AANGAN. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if VINAYAK AANGAN is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINAYAK AANGAN?

The registered promoter entity is SHRI HARIKRISHNA ENTERRISES, a partnership as per the filing. Its GSTIN 27AEAFS2791C1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINAYAK AANGAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VINAYAK AANGAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINAYAK AANGAN?

The professionals named in the filing: Architect: A T U L PATEL ARCHITECTS; Engineer: SK Consultants & Engineers; Engineer: Balu Kundalik Rathod; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINAYAK AANGAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINAYAK AANGAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINAYAK AANGAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.