Home / Browse projects / Palghar, Maharashtra / VINAY UNIQUE RESIDENCY BLDG NO 7 A WING

Registered No litigation declared Residential / Group Housing project

VINAY UNIQUE RESIDENCY BLDG NO 7 A WING

By JASAMRIT ESTATES PRIVATE LIMITED

RG-MH-74269 · RERA P99000045609 · Last updated on MahaRERA portal: 28 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 95%
19 of 83Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

VINAY UNIQUE RESIDENCY BLDG NO 7 A WING is a Residential / Group Housing project by JASAMRIT ESTATES PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000045609 on 26 May 2022. Possession is promised by 31 Dec 2026. 64 of the 83 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVINAY UNIQUE RESIDENCY BLDG NO 7 A WING
  • TypeResidential / Group Housing
  • Location
    • VINAY UNIQUE RESIDENCY
    • GOKUL TOWNSHIP
    • BOLINJ
    • VIRAR
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000045609
  • ReraGenie IDRG-MH-74269

Builder

  • NameJASAMRIT ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201MH2007PTC169204
  • GSTIN27AABCJ8297J1ZY
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsPIYUSH ASHOK MEHTA, ANUP ASHOK MEHTA, MEET SHAILESH DOSHI
  • Managing DirectorJAYESHKUMAR VINAYCHAND DOSHI
  • Other registrations3 more →
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 May 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed139 files

Current status

77%64 of 83 units booked
100.0%Work done, per cost certificate

Figures as on 28 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINAY UNIQUE RESIDENCY BUILDING NO 7 A WINGNA191983083

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

VINAY UNIQUE RESIDENCY BUILDING NO 7 A WING: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 28 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area976 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI5541.06
Proposed, not sanctioned5,541 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPATEL ESTATE, BAZARPETH ROAD, NEAR GANDHI CHOWK, KALYAN, 421301
Estimated costRs 19.70 cr
Cost incurredRs 19.70 cr
Work done99.95%
BuildingWingEstimatedIncurred
VINAY UNIQUE RESIDENCY BUILDING NO 7 A WINGNARs 18.00 crRs 18.00 cr
-NARs 1.71 crRs 1.70 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR SANJAY NARANG
EngineerMR SANJAY NARANG
Chartered AccountantMR HIMANSHU JAIN
PartnerRole in project
JASAMRIT ESTATES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 7A FORM 1 31032025.pdf28 Jul 2025
Withdrawal Update Form 2File: E 7 A 29032024.pdf28 Jul 2025
Withdrawal Update Form 3File: 7A FORM 2 31032025.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 31122024.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 7A 31122024.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 31122024.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: 7A SOLD UNSOLD INVENTORY 31122024.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 7 A 29062024.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 30092024.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 7A 30062024.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 7A 30092024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E 7 A 29062024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30092024.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 7A SOLD UNSOLD INVENTORY 30062024.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 7A SOLD UNSOLD INVENTORY 30092024.pdf27 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A 31032024.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 7 A 30122023.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 7 A 29032024.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E 7 A 30122023.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E 7 A 29032024.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: 7A SOLD UNSOLD INVENTORY 31122023.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: 7A SOLD UNSOLD INVENTORY 31032024.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 7a 31122023.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 7A 31032024.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 30062023.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 30092023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30062023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30062023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30062023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30092023.pdf14 Dec 2023
Disclosure of sold/ booked inventoryFile: 7A 30062023 SOLD UNSOLD.pdf14 Dec 2023
Disclosure of sold/ booked inventoryFile: 7A 30092023 SOLD UNSOLD.pdf14 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 7A 30062023.pdf14 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 7A 30092023.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CA 7A 31032023.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 03012022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 31032022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 30062022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A Form1 30092022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 7 A 30122022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 31032023.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 03012022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 31032022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30062022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A Form2 30092022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E 7 A 30122022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 31032023.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Wing 7A DEC 2021.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 31032022.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form2A 30062022.pdf5 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 7a 31032023.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 03012022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 31032022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 30062022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A Form1 30092022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 7 A 30122022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 7 A 30122022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 03012022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 31032022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 30062022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A Form2 30092022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E 7 A 30122022.pdf3 Nov 2023
Layout approvalFile: LAYOUT PLAN - Copy.pdf5 Oct 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - Copy.pdf5 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Development Permission VVCMC-TP-RDP-VP0607-631-2022 23 dated 31-03-2023 - Copy.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7A FORM 1 31032023_compressed.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7A FORM 2 31032023.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31032023.pdf5 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations jayesh bhai.pdf29 Aug 2023
Copy of the legal title reportFile: TITLE AND FLOW CHART DATED 28072023.pdf29 Jul 2023
Building plan approvalFile: BLDG 7 STILT 1ST TO 7TH, 9TH TO 11TH, 13TH TO 17.pdf28 Jul 2023
Layout approvalFile: LAYOUT PLAN.pdf28 Jul 2023
Building plan approvalFile: BLDG 7 REFUSE 8TH 12TH.pdf28 Jul 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf28 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: BLDG 7 REFUSE 8TH 12TH.pdf28 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: BLDG 7 STILT 1ST TO 7TH, 9TH TO 11TH, 13TH TO 17.pdf28 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Assessment Order VVCMCTPRDPVP060763020222023 Dated 31032023.pdf28 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: BLDG 7 STILT 1ST TO 7TH, 9TH TO 11TH, 13TH TO 17.pdf28 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Development Permission VVCMC-TP-RDP-VP0607-631-2022 23 dated 31-03-2023.pdf28 Jul 2023
Declaration about Commencement CertificateFile: declaration about CC format D.pdf28 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VINAY UNIQUE GARDENSVIRAR WEST696CompletedDec 2019Jul 2019

How this compares with Palghar

77%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINAY UNIQUE RESIDENCY BLDG NO 7 A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR3,200+ in Palghar

2 kmVINAY UNIQUE RESIDENCY BCompleted 41Lapsed / revoked 24Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: JASAMRIT ESTATES PRIVATE LIMITED

JASAMRIT ESTATES PRIVATE LIMITED has 4 registrations on MahaRERA, including VINAY UNIQUE RESIDENCY BLDG NO 7 and VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VINAY UNIQUE RESIDENCY BLDG NO 7 A WING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINAY UNIQUE RESIDENCY BLDG NO 7 A WING?

The registered promoter entity is JASAMRIT ESTATES PRIVATE LIMITED, a company as per the filing. Its CIN U45201MH2007PTC169204 and GSTIN 27AABCJ8297J1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINAY UNIQUE RESIDENCY BLDG NO 7 A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VINAY UNIQUE RESIDENCY BLDG NO 7 A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINAY UNIQUE RESIDENCY BLDG NO 7 A WING?

The professionals named in the filing: Architect: MR SANJAY NARANG; Engineer: MR SANJAY NARANG; Chartered Accountant: MR HIMANSHU JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINAY UNIQUE RESIDENCY BLDG NO 7 A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINAY UNIQUE RESIDENCY BLDG NO 7 A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINAY UNIQUE RESIDENCY BLDG NO 7 A WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.