Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
18 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 90%
1Complaints at MahaRERAon this registration
Jump to the 208 documents Report an error

VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY is a Residential / Group Housing project by JASAMRIT ESTATES PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000031788 on 12 Nov 2021. Possession is promised by 5 Sep 2028. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY
  • TypeResidential / Group Housing
  • Location
    • VINAY UNIQUE RESIDENCY
    • GOKUL TOWNSHIP
    • NEAR MULJIBHAI MEHTA SCHOOL
    • BOLINJ
    • VUIRAR WEST
    • VIRAR WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000031788
  • ReraGenie IDRG-MH-73415

Builder

  • NameJASAMRIT ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201MH2007PTC169204
  • GSTIN27AABCJ8297J1ZY
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsPIYUSH ASHOK MEHTA, ANUP ASHOK MEHTA, MEET SHAILESH DOSHI
  • Managing DirectorJAYESHKUMAR VINAYCHAND DOSHI
  • Other registrations3 more →
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2021PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Nov 2021
  • Promised completion5 Sep 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed208 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINAY UNIQUE RESIDENCY BLDG NO 10 D WINGNA290000
VINAY UNIQUE RESIDENCY BLDG NO 10 E WINGNA290000
VINAY UNIQUE RESIDENCY BLDG NO 10 F WINGNA290000
VINAY UNIQUE RESIDENCY BLDG NO 10 G WINGNA290000
VINAY UNIQUE RESIDENCY BLDG NO 10 H WINGNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 3 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 90%.

VINAY UNIQUE RESIDENCY BLDG NO 10 D WING41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor90%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VINAY UNIQUE RESIDENCY BLDG NO 10 E WING44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor80%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VINAY UNIQUE RESIDENCY BLDG NO 10 F WING53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VINAY UNIQUE RESIDENCY BLDG NO 10 G WING50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VINAY UNIQUE RESIDENCY BLDG NO 10 H WING51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1147

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,147
Closed/Covered249
Open Space898
BuildingClosed/CoveredOpen SpaceTotal
VINAY UNIQUE RESIDENCY BLDG NO 10 D WING93338431
VINAY UNIQUE RESIDENCY BLDG NO 10 E WING44165209
VINAY UNIQUE RESIDENCY BLDG NO 10 F WING37130167
VINAY UNIQUE RESIDENCY BLDG NO 10 G WING37130167
VINAY UNIQUE RESIDENCY BLDG NO 10 H WING38135173

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,727 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI46984.48
Proposed, not sanctioned41,750 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLOOR, SURVEY NO 265, MHATRE WADI, NEAR VIRAR RAILWAY STATION, VIRAR WEST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON MR SANJAY NARANG
EngineerJ W CONSULTANTS LLP MR UMESH JOSHI
EngineerENCON MR SANJAY NARANG
Chartered AccountantHIMANSHU SHARWAN JAIN
PartnerRole in project
JASAMRIT ESTATES PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502567PANKAJ TUKARAM DHURIJASAMRIT ESTATES PRIVATE LIMITED26/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Sep 2028

Documents filed208

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 208 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 31032024.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 30062024.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 30092024.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLDG NO 10 DEFGH FORM 3 30032024.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLDG NO 10 DEFGH FORM 3 30062024.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLDG NO 10 DEFGH FORM 3 30092024.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 31032024.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 30062024.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 30092024.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: BLDG NO 10 DEFGH SOLD UNSOLD 31032024.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: BLDG NO 10 DEFGH SOLD UNSOLD 30062024.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: BLDG NO 10 DEFGH SOLD UNSOLD 30092024.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A QUALITY CERTIFICATE 2023-2024.pdf3 Feb 2025
Details of encumbrancesFile: RERA Encumbrance Format -SKY.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 30062023.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 30092023.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Bldg 10 D to H 30122023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 30062023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 30092023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E Bldg 10 wing D to H 3012203.pdf7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GetUserDocumentFileContent (22).pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: 10DEFGH SOLD UNSOLD LIST 30062023.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: 10DEFGH SOLD UNSOLD LIST 30092023.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: sold inventory 31122023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 10defgh 31122023.pdf7 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FROM 01042022 TO 31032023.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate 29102021 compressed.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10DEFGH FORM 1 03012022_compressed.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 31032022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 30062022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30092022.pdf5 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Bldg 10 D to H 30122022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 29102021 compressed.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10DEFGH FORM 1 03012022_compressed.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 31032022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10DEFGH FORM 2 03012022_compressed.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 30062022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 30092022.pdf5 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E Bldg 10 wing D to H 30122022.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A QUALITY CERTIFICATE oct 2021.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Wing 10DEFGH DEC 2021.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 31032022.pdf5 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 30062022.pdf5 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 03112021 compressed.pdf5 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 5 Project Information_compressed.pdf4 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate 29102021 compressed.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10DEFGH FORM 1 03012022_compressed.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 31032022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 30062022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30092022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Bldg 10 D to H 30122022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 29102021 compressed.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10DEFGH FORM 2 03012022_compressed.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 31032022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 30062022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 30092022.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E Bldg 10 wing D to H 30122022.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FROM 01042022 TO 25092022.pdf3 Nov 2023
Layout approvalFile: LAYOUT PLAN - Copy.pdf5 Oct 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - Copy.pdf5 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Development Permission VVCMC-TP-RDP-VP0607-631-2022 23 dated 31-03-2023 - Copy.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch RERA BLDG 10 D2H 31032023 compressed.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg RERA BLDG D2H 31032023 compressed.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 31032023.pdf5 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations jayesh bhai.pdf29 Aug 2023
Layout approvalFile: LAYOUT PLAN.pdf13 Aug 2023
Building plan approvalFile: BLDG 10 12TH 16TH 14TH FLOOR.pdf13 Aug 2023
Building plan approvalFile: BLDG 10 A B 8 14 20 3TO7 9TO13 15TO19 21TO23 2NDFLOOR.pdf13 Aug 2023
Building plan approvalFile: BLDG 10 A B BASE GR 1ST FLOOR.pdf13 Aug 2023
Building plan approvalFile: BLDG 10 BASEMENT GR FLOOR.pdf13 Aug 2023
Building plan approvalFile: 5 BLDG 10 C 2 8 14 20TH 3TO7 9TO13 15TO19 21TO23RD.pdf13 Aug 2023
Building plan approvalFile: 6 BLDG 10 D E 1ST 2ND FLOOR.pdf13 Aug 2023
Building plan approvalFile: 7 BLDG 10 D E 8 14TH 3TO7 9TO10 12 13 15 19 21TO23RD FLOOR.pdf13 Aug 2023
Building plan approvalFile: 8 BLDG 10 D E 11 16 17 18 21ST 20TH FLOOR.pdf13 Aug 2023
Building plan approvalFile: 9 BLDG 10 D E BASE GRD FLOOR.pdf13 Aug 2023
Building plan approvalFile: 10 BLDG 10 F G 8 14 20TH.pdf13 Aug 2023
Building plan approvalFile: 11 BLDG 10 F G BA GR 1ST 2TO7 9TO10 12 13 15TO19 21TO23 FLOOR.pdf13 Aug 2023
Building plan approvalFile: 12 BLDG 10 GR BASE 1ST FLOOR.pdf13 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VINAY UNIQUE GARDENSVIRAR WEST696CompletedDec 2019Jul 2019

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS S on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR WEST3,200+ in Palghar

2 kmVINAY UNIQUE RESIDENCY BCompleted 59Lapsed / revoked 33Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 186 registered projects within 2 km.

Builder: JASAMRIT ESTATES PRIVATE LIMITED

JASAMRIT ESTATES PRIVATE LIMITED has 4 registrations on MahaRERA, including VINAY UNIQUE RESIDENCY BLDG NO 7 and VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY is delayed beyond 5 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY?

The registered promoter entity is JASAMRIT ESTATES PRIVATE LIMITED, a company as per the filing. Its CIN U45201MH2007PTC169204 and GSTIN 27AABCJ8297J1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY?

The professionals named in the filing: Architect: ENCON MR SANJAY NARANG; Engineer: J W CONSULTANTS LLP MR UMESH JOSHI; Engineer: ENCON MR SANJAY NARANG; Chartered Accountant: HIMANSHU SHARWAN JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS SKY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINAY UNIQUE RESIDENCY BLDG NO 10 KNOWN AS S to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.