Registered No litigation declared Residential / Group Housing project

Vinay Avenue Building No. 16

By AMAR ASSOCIATES

RG-MH-06426 · RERA P99000053933 · Last updated on MahaRERA portal: 3 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
30 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

Vinay Avenue Building No. 16 is a Residential / Group Housing project by AMAR ASSOCIATES in Palghar, Maharashtra, registered with MahaRERA as P99000053933 on 11 Dec 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameVinay Avenue Building No. 16
  • TypeResidential / Group Housing
  • Location
    • 30 W Palghar Boisar Road
    • Yashvant Srushti
    • khairepada
    • Palghar
    • 401501
  • Pincode401501
  • RERA no.P99000053933
  • ReraGenie IDRG-MH-06426

Builder

  • NameAMAR ASSOCIATES
  • Entity typePartnership
  • GSTIN27AAFFA4088F1ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSHAILESH VINAYCHAND DOSHI
  • Other registrations9 more →
  • Completed1 of 10
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vinay Avenue Building No 16 Wing ANA80000
Vinay Avenue Building No 16 Wing BNA80000
Vinay Avenue Building No 16 Wing CNA50000
Vinay Avenue Building No 16 Wing DNA50000
Vinay Avenue Building No 16 Wing ENA50000
Vinay Avenue Building No 16 Wing FNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 3 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 90%.

Vinay Avenue Building No 16 Wing A57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Vinay Avenue Building No 16 Wing B58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Vinay Avenue Building No 16 Wing C74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Vinay Avenue Building No 16 Wing D73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Vinay Avenue Building No 16 Wing E74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Vinay Avenue Building No 16 Wing F65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 3 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
Vinay Avenue Building No 16 Wing A11
Vinay Avenue Building No 16 Wing B11
Vinay Avenue Building No 16 Wing C11
Vinay Avenue Building No 16 Wing D11
Vinay Avenue Building No 16 Wing E11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,368 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Instacroissance LimitedMagathaneMumbai Suburban

Approvals and building plan

Permissible FSI13097.41
Proposed, not sanctioned13,097 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFirst Floor A Wing Shanti Commercial Complex Near Mira Rd Rly Station Mira Road East Thane 401107

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShape Consultants
EngineerDarsh Consult
Chartered AccountantR D Lukad & Co
PartnerRole in project
AMAR ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect's Certificate 30-09-2025 Vinay Avenue Signed.pdf3 Dec 2025
Form 2File: Form-2 Engineer's Certificate 30-09-2025 Vinay Avenue Signed.pdf3 Dec 2025
Form 3File: Form 3 CA's Certificate 30-09-2025 Vinay Avenue Signed.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30-09-2025 Vinay Avenue.pdf3 Dec 2025
Form 1File: Form 1 Architect's Certificate 30-06-2025 Vinay Avenue Signed.pdf20 Nov 2025
Form 2File: Form-2 Engineer's Certificate 30-06-2025 Vinay Avenue Signed.pdf20 Nov 2025
Form 3File: Form 3 CA's Certificate 30-06-2025 Vinay Avenue Signed.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30-06-2025 Vinay Avenue.pdf20 Nov 2025
Form 1File: Form 1 Architect's Certificate 31-03-2025 Dated 28-05-2025 signed.pdf19 Nov 2025
Form 2File: Form 2 Engineer's Certificate 31-03-2025 Dated 30-05-2025.pdf19 Nov 2025
Form 3File: Form 3 CA's Certificate 31-03-2025 Dated 30-05-2025.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 31-03-2025.pdf19 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate 26-10-2024.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA's Certificate Dated 28-01-2025.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate Dated 17-01-2025.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA's Certificate F Y 2023-24.pdf1 Feb 2025
Other - TechnicalFile: Gmail - CC Issued By Collector Palghar At Village Khaira Boisar On SR No 52,54 and 105 Ord30 Nov 2023
Copy of the legal title reportFile: 2 Copy of Legal Title Report 04 10 23.pdf10 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_0001.pdf13 Sep 2023
Proforma of Agreement for saleFile: RERA AFS clean copy - bldg no 16 02082023 (New).pdf5 Sep 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL 02082023 (New).pdf5 Sep 2023
Deviation Report with respect to Allotment letterFile: deviation report on allotment letter 01092023 (New).pdf5 Sep 2023
CERSAI detailsFile: CERSAI_Search_Report_200278374556_For_Asset_Based_Search_25_08_2023_13_37_23_702.pdf25 Aug 2023
CERSAI detailsFile: 13 Cersai Declaration.pdf25 Aug 2023
Declaration in FORM BFile: 8 Declaration in Form B.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form-1 Architect's Certificate dated 28-07-2023 2.pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form 3 CA's Certificate dated 18-08-2023.pdf19 Aug 2023
Deviation Report with respect to model copy of AgreementFile: deviation report on Agreement for Sale - 02082023.pdf19 Aug 2023
Details of encumbrances concerned to FinanceFile: 3 Details of encumbrances 2.pdf18 Aug 2023
Details of encumbrances concerned to FinanceFile: 3 Details of encumbrances.pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: 3 Details of encumbrances 2.pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: 3 Details of encumbrances.pdf18 Aug 2023
Declaration about Commencement CertificateFile: 7 Declaration about Commencement Certificate.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 Engineer's Certificate dated 11-08-2023.pdf18 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 11 Disclosure of Interest in Other Real Estate Organizations.pdf18 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 11 Disclosure of Interest in Other Real Estate Organizations 2.pdf18 Aug 2023
Layout approvalFile: 4 Copy of Layout Approval compressed.pdf2 Aug 2023
Building plan approvalFile: 5a Building Plan Approval compressed.pdf2 Aug 2023
Building plan approvalFile: 5b Building Approval Plan compressed.pdf2 Aug 2023
Building plan approvalFile: 5c Building Plan Approval compressed.pdf2 Aug 2023
Building plan approvalFile: 5d Building Plan Approval compressed.pdf2 Aug 2023
PAN CardFile: 1 PAN Card.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval compressed.pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 5a Building Plan Approval compressed.pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 5b Building Approval Plan compressed.pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 5c Building Plan Approval compressed.pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 5d Building Plan Approval compressed.pdf2 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate.pdf2 Aug 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHIV SHAKTI CHSLP51800045346VILLAGE KANHERI, TALUKA BORIVALI, BORIVALI EAST, Mumbai Suburban-May 2022CompletedMar 2026Sep 2024
NEW TASHKENT TERRACE CHSLP51800005598Borivali, Mumbai Suburban-Aug 2017CompletedOct 2018Late, Feb 2020
SAHJEEVAN CHSLROKADIA CROSS LANE OPP S E INTERNATIONAL SCHOOL BEHIND GOKUL HOTEL BORIVALI WEST MUMBAI 9216-CompletedMar 2017Feb 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vinay Avenue Building No. 16 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yashvant Srushti3,200+ in Palghar

Builder: AMAR ASSOCIATES

AMAR ASSOCIATES has 10 registrations on MahaRERA, including NEW TASHKENT TERRACE CHSL and VINAY HERITAGE. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Vinay Avenue Building No. 16 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vinay Avenue Building No. 16?

The registered promoter entity is AMAR ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAFFA4088F1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vinay Avenue Building No. 16?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vinay Avenue Building No. 16?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vinay Avenue Building No. 16?

The professionals named in the filing: Architect: Shape Consultants; Engineer: Darsh Consult; Chartered Accountant: R D Lukad & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vinay Avenue Building No. 16?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vinay Avenue Building No. 16. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vinay Avenue Building No. 16 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.