Home / Browse projects / Mumbai Suburban, Maharashtra / VILLA 79

Registration lapsed No litigation declared Residential / Group Housing project

VILLA 79

By Mehta Jaising Builders LLP

RG-MH-05831 · RERA P51800052707 · Last updated on MahaRERA portal: 13 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 50%
16 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

VILLA 79 is a Residential / Group Housing project by Mehta Jaising Builders LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052707 on 22 Sep 2023. Possession was promised by 30 Apr 2026 and is now 6 months past that date. 8 of the 24 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameVILLA 79
  • TypeResidential / Group Housing
  • Location
    • TAGORE ROAD
    • SANTACRUZ WEST
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052707
  • ReraGenie IDRG-MH-05831

Builder

  • NameMehta Jaising Builders LLP
  • Entity typePartnership
  • PartnersPranjal Mahendra Mehta, Karna Mahendra Mehta
  • Declared earlier projects2 →

Key dates

6 months past promisethis monthRegisteredSep 2023PromisedApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Sep 2023
  • Promised completion30 Apr 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Current status

33%8 of 24 units booked
85.9%Work done, per cost certificate

Figures as on 13 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VILLA 79NA9024024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

VILLA 79: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered39

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area726 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
MEHTA JAISING BUILDERS LLPAndheriMumbai Suburban
LANU VILL COOPERATIVE HSG SOC LTDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1958.88
Proposed, not sanctioned1,161 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 124 SWAMI VIVEKANANDA ROAD KHAR VIRAJ KHAR WEST MUMBAI 52
Estimated costRs 9.96 cr
Cost incurredRs 8.56 cr
Work done85.86%
BuildingWingEstimatedIncurred
VILLA 79NARs 5.98 crRs 5.98 cr
-NARs 3.99 crRs 2.58 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH PRANJAL M MEHTA Mahendra Mehta
ArchitectKEYUR K CHANCHAD
EngineerMAHENDRA D MEHTA D MEHTA
EngineerS D PATIL D PATIL
Chartered AccountantN D GANGAR d GANGAR
PartnerRole in project
Mehta Jaising Builders LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 2464427_FurtherCC_signed13TH.pdf13 Nov 2025
Withdrawal Update Form 1File: MAHARERA_0062_FORM 1_Architect Certificate_QE_March2025.pdf13 Nov 2025
Withdrawal Update Form 2File: MAHARERA_0063_FORM 2_Engineers Certificate_QE_March2025.pdf13 Nov 2025
Withdrawal Update Form 3File: MAHARERA_0067_FORM 3_CA Certificate_QE_Mar2025 (1).pdf13 Nov 2025
Withdrawal Update Form 1File: MAHARERA_0062_FORM 1_Architect Certificate_QE_March2025.pdf12 Nov 2025
Withdrawal Update Form 2File: MAHARERA_0063_FORM 2_Engineers Certificate_QE_March2025.pdf12 Nov 2025
Withdrawal Update Form 3File: MAHARERA_0067_FORM 3_CA Certificate_QE_Mar2025 (1).pdf12 Nov 2025
Form 1File: MAHARERA_0062_FORM 1_Architect Certificate_QE_March2025 (1)2.pdf21 Jun 2025
Form 2File: MAHARERA_0063_FORM 2_Engineers Certificate_QE_March20252.pdf21 Jun 2025
Form 3File: FORM 3 ANNXD DT 210625.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: MAHARERA_0066_Inventory Disclosure_20250621.pdf21 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MJBLLP MAHARERA FORM3 ANNX-D.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHARERA_0056_FORM 1_Architect Certificate_QE_Sep2024.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHARERA_0055_FORM 2_Engineers Certificate_QE_Sep2024.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1Architect CertificateQEJune2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3CA Certificatecompressed.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5Annual Report.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2Engineers CertificateQEJune2024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHARERA0049Form 1Architects CertificateFull IOD.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHARERA0048Form 2Engineers CertificateFull IOD.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MahaRERA Certificate- Villa 79.pdf30 May 2024
Building plan approvalFile: Amended Letter VILLA 79.pdf6 Apr 2024
Building plan approvalFile: Amended Drawing VILLA 79-1-2.pdf6 Apr 2024
Building plan approvalFile: Amended Drawing VILLA 7934C.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Letter VILLA 79.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing VILLA 79-1-2.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing VILLA 7934C.pdf6 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC VILLA 79.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHARERA_0042_QU_Dec23_FORM 2_compressed (1).pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost 08923.pdf8 Sep 2023
Copy of the legal title reportFile: 12 (1).pdf4 Sep 2023
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf22 Aug 2023
Declaration about Commencement CertificateFile: MAHARERA_0010_Declaration about CC (2) (1).pdf22 Aug 2023
CERSAI detailsFile: Pranjal CERSAI undertaking.pdf22 Aug 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: LV Society Reg Doc.pdf22 Aug 2023
Details of encumbrances concerned to FinanceFile: MAHARERA_0028_No Finantial Encumberances.pdf21 Aug 2023
Details of encumbrances concerned to LegalFile: MAHARERA_0028_No Finantial Encumberances.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHARERA_013_FORM 2_Engineers Certificate_IOD.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Adobe Scan 17 Aug 2023 (1) (1).pdf21 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: MAHARERA_0020_Seperate Bank Account.pdf21 Aug 2023
Other - FinanceFile: MAHARERA_0034_Additional Purchase Declaration.pdf21 Aug 2023
Declaration in FORM BFile: MAHARERA_011_Form B_compressed.pdf20 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MAHARERA_0032_Annexure A Din Pin both Partners.pdf20 Jul 2023
Proforma of Agreement for saleFile: MAHARERA_025_Sale Agreement Draft (1)_compressed-1-25.pdf20 Jul 2023
Details of encumbrances concerned to FinanceFile: MAHARERA_0031_No Encumberances Combined (1).pdf19 Jul 2023
Details of encumbrances concerned to LegalFile: MAHARERA_0031_No Encumberances Combined (1).pdf19 Jul 2023
Proforma of Agreement for saleFile: Pranjal Mehta AFS _compressed-21-45.pdf19 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 2373192_FirstCC_signed (1).pdf12 Jun 2023
PAN CardFile: MAHARERA024PAN_compressed.pdf22 May 2023
Proforma of Allotment letterFile: MAHARERA018Allotment Letter_compressed.pdf22 May 2023
Deviation Report with respect to Allotment letterFile: MAHARERANo Deviation Report.pdf22 May 2023
Deviation Report with respect to model copy of AgreementFile: MAHARERANo Deviation Report.pdf22 May 2023
Layout approvalFile: MAHARERA_009_Layout Plans (1).pdf9 May 2023
Building plan approvalFile: MAHARERA_009_Layout Plans (1).pdf9 May 2023
Copy of Layout Approval (in case of layout)File: MAHARERA_009_Layout Plans (1).pdf9 May 2023
Building Plan Approval / NA Order for plotted developmentFile: MAHARERA_009_Layout Plans (1).pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHARERA_012_Architects Certificate.pdf9 May 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sanjeevani63 Sanjeevani Sir P M Road Santacruz West45CompletedDec 2016Mar 2016
Kirti Kunj398 Kirti Kunj 14th ROad Khar West.23CompletedJul 2016Feb 2016

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VILLA 79 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ WEST6,700+ in Mumbai Suburban

2 kmVILLA 79Completed 117Lapsed / revoked 66Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 316 registered projects within 2 km.

Builder: Mehta Jaising Builders LLP

Mehta Jaising Builders LLP has 1 registration on MahaRERA, including VILLA 79. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that VILLA 79 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VILLA 79 is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VILLA 79?

The registered promoter entity is Mehta Jaising Builders LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VILLA 79?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VILLA 79?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VILLA 79?

The professionals named in the filing: Architect: ARCH PRANJAL M MEHTA Mahendra Mehta; Architect: KEYUR K CHANCHAD; Engineer: MAHENDRA D MEHTA D MEHTA; Engineer: S D PATIL D PATIL; Chartered Accountant: N D GANGAR d GANGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VILLA 79?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VILLA 79. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VILLA 79 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.