ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / Vikram Trade Centre

Registration approved No litigation declared Commercial project

Vikram Trade Centre

By Land Trades Builders and Developers

RG-KA-66617 · RERA PRM/KA/RERA/1257/334/PR/090523/005926 · Last updated on RERA Karnataka portal: 2 May 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
May 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 120 documents Report an error

Vikram Trade Centre is a Commercial project by Land Trades Builders and Developers in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/090523/005926 on 9 May 2023. Possession is promised by 30 May 2025.

At a glance

Project

  • NameVikram Trade Centre
  • TypeCommercial
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575003
  • Pincode575003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/090523/005926
  • ReraGenie IDRG-KA-66617

Builder

  • NameLand Trades Builders and Developers
  • Entity typeProprietorship Firm
  • GSTIN29AAJPH6778H1Z4
  • Authorized SignatoryK Shrinath Hebbar
  • Other registrations11 more →
  • Declared earlier projects17 →

Key dates

this monthRegisteredMay 2023PromisedMay 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 May 2023
  • Promised completion30 May 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIKRAM TRADE CENTRE---03939

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 2 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningYes-
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area987 sq m
Named landowners4
LandownerVillageDistrict
HP Shanatharam--
HP Subramanya--
HP Subramanya--
HP Shivanand--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 20.62 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 20.62 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGokulraj
EngineerK. ANIL HEGDE
Chartered AccountantLaxmisha Rao K

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed120

As listed on the registration, under the names the promoter filed them with; the newest 80 of 120 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/090523/005926 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer and Architect license certificateFile: 01- Engineer and Architect License .pdf2 May 2023
Brief estimated cost of constructionFile: 02- Brief Estimated cost of construction.pdf2 May 2023
proforma of Allotment letterFile: 03- Proforma of Allotment letter.pdf2 May 2023
Proforma of agreement for saleFile: 04-Proforma of Agreement for Sale.pdf2 May 2023
1-1 sources of funds to complete the projectFile: 1-1 & 2 Land cost details.pdf25 Apr 2023
2-1 Settlement deed infavour Bhavani Shankar RaoFile: 2-1 Settlement deed of Bhavani Shankar.pdf25 Apr 2023
2-1 Mutation Endorsement of 147/1File: 2-1 Mutation Endorsement.pdf25 Apr 2023
2-2 Notarized Joint Affidavit cum declarationFile: 2-2 Joint Affidavid cum Declaration.pdf25 Apr 2023
2-3 Settlement deed document no. 369/81-82File: 2-3 Settlement deed of doc no 369-81 82.pdf25 Apr 2023
2-3 Mutation Endorsement copy of Sy no 147/1File: 2-3 Mutation Endorsement .pdf25 Apr 2023
2-4 title deed for Sy No 47/1 P1 in the name of K Narashima RaoFile: 2-4 Title deed for sy no 147-1 in the name of K Narasimha Rao.pdf25 Apr 2023
3-1 certified Carpet area calculationFile: 3-1 Certified carpet area.pdf25 Apr 2023
3-2 CDP map showing the proposed siteFile: 3-2 CDP Map of Site.pdf25 Apr 2023
3-3 village map showing the proposed siteFile: 3-3 Site location on Village maps.pdf25 Apr 2023
3-4 Architects detailsFile: 3-4 Architetct Details.pdf25 Apr 2023
3-5 relinquishment deedFile: 3-5 Relinquishment Deed.pdf25 Apr 2023
3-6 commencement certificateFile: 3-6 Commencement certificate.pdf25 Apr 2023
3-7 FAR CopyFile: 3-7 Premium FAR copy.pdf25 Apr 2023
3-8 all sanctioned drawings Floor plans 1 of 6 to 3 of 6File: 3-8 License Plans from 1 of 6 to 3 of 6.pdf25 Apr 2023
3-8 all sanctioned drawings Floor plans 4 of 6 to 5 of 6File: 3-8 License Plans from 4 of 6 to 5 of 6.pdf25 Apr 2023
3-8 all sanctioned drawings Floor plans 6 of 6File: 3-8 License Plans 6 of 6.pdf25 Apr 2023
4-1 common area detailsFile: 4-1 Commen Area Details.pdf25 Apr 2023
4-2 Engineer license certificateFile: 4-2 Engineer License Certificate .pdf25 Apr 2023
4-3 CA and Engineer certificateFile: 4-3 Cost Details.pdf25 Apr 2023
4-4 estimated cost of constructionFile: 4-4 Estimated cost of Construction.pdf25 Apr 2023
4-5 receipt paid towards Water supply NOC and Power supply NOCFile: 4-5 Water and power supply charges.pdf25 Apr 2023
4-6 STP design drawing and STP demarcation drawingFile: 4-6 STP Design and demarcation drawing.pdf25 Apr 2023
4-7 proforma of Allotment letterFile: 4-7 Proforma of Allotment letter.pdf25 Apr 2023
4-8 proforma of Agreement for saleFile: 4-8 Proforma of Agreement for Sale.pdf25 Apr 2023
4-9 notarized affidavitFile: 4-9 Notarized Affidavid.pdf25 Apr 2023
4-10 signed copy of the project specificationFile: 4-10 Sighned project specification.pdf25 Apr 2023
RTC, survey 147/2(P)-
Mutation, survey 147/2(P)-
Encumbrance Certificate, survey 147/2(P)-
Conversion/Alienation Order, survey 147/2(P)-
Sale/Title/Gift Deed, survey 147/2(P)-
JDA, survey 147/2(P)-
Khatha, survey 147/2(P)-
RTC, survey 147/1(P)-
Mutation, survey 147/1(P)-
Encumbrance Certificate, survey 147/1(P)-
Conversion/Alienation Order, survey 147/1(P)-
Sale/Title/Gift Deed, survey 147/1(P)-
JDA, survey 147/1(P)-
Khatha, survey 147/1(P)-
RTC, survey 147/1(P)-
Mutation, survey 147/1(P)-
Encumbrance Certificate, survey 147/1(P)-
Conversion/Alienation Order, survey 147/1(P)-
Sale/Title/Gift Deed, survey 147/1(P)-
JDA, survey 147/1(P)-
Khatha, survey 147/1(P)-
Registration CertificateFile: 1- Trade License.pdf-
Certificate issued by CA Form 1File: 57 Approval cost certificate.pdf-
Certificate issued by Architect Form 2File: 59 Architect certificate.pdf-
Certificate issued by Engineer Form 3File: 58 Engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: 45 Non Litigation Affidavid.pdf-
Certificate from Chartered AccountFile: 56 Form 1 CA certificate.pdf-
Balance Sheet 2021 - 2022File: 60-Balance Sheet 21-22.pdf-
Balance Sheet 2020 - 2021File: 60-Balance Sheet 20-21.pdf-
Balance Sheet 2019 - 2020File: 60-Balance sheet 19-20.pdf-
Audited Profit and Loss Statement 2021 - 2022File: 61-Profit and Loss 21-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 61-Profit and loss 20-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: 61-Profit and loss 19-20.pdf-
Cash Flow Statement 2021 - 2022File: 63-Cash Flow 21-22.pdf-
Cash Flow Statement 2020 - 2021File: 63-Cash Flow 20-21.pdf-
Auditor's Report 2021 - 2022File: 64-Audit report 21-22.pdf-
Auditor's Report 2020 - 2021File: 64-Audit Report 20-21.pdf-
Auditor's Report 2019 - 2020File: 64-Audit Report 19-20.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: 65-ITR 21-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 65-ITR 20-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: 65-ITR 19-20.pdf-
67-Commencement certificate-
68 MESCOM NOC-
69 Vikram Water NOC-
70 Layout Plan-
71 Approved Building plan-

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date1 under way, not due yet8 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
ShivabaghKadri Shivabagh, MangaloreOngoingDec 2027Not due yet
AlturaBendorewell, MangaloreOngoingOct 2024Not delivered
NakshatraGandhinagar MangaloreOngoingOct 2023Not delivered
SolitaireHathill, Chilimbi MangaloreCompleted-No date filed
Milestone 25Balmatta MangaloreCompleted-No date filed
Lenhil FernsNear City hospital Kadri MangaloreCompleted-No date filed
Kamath GardenUllala MangaloreCompleted-No date filed
IndusNear Arya Samaj Road, Mallikatte Kadri, MangaloreCompleted-No date filed
INSIGNIAValencia Church road, near valencia church valenciaCompleted-No date filed
Emarald BaySurathkal MangaloreCompleted-No date filed
AnantesshCarstreet MangaloreCompleted-No date filed

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Vikram Trade Centre on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmVikram Trade CentreOther 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 105 registered projects within 2 km.

Builder: Land Trades Builders and Developers

Land Trades Builders and Developers has 12 registrations on RERA Karnataka, including MAHALAXMI and Laxmi Govind. Its filings declare 17 earlier projects, 13 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Vikram Trade Centre is delayed beyond 30 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Vikram Trade Centre?

The registered promoter entity is Land Trades Builders and Developers, a proprietorship firm as per the filing. Its GSTIN 29AAJPH6778H1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Vikram Trade Centre?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Vikram Trade Centre?

The professionals named in the filing: Architect: Gokulraj; Engineer: K. ANIL HEGDE; Chartered Accountant: Laxmisha Rao K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vikram Trade Centre?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vikram Trade Centre. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vikram Trade Centre to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.