Home / Browse projects / Mumbai Suburban, Maharashtra / Vikram Delite CHSL
Vikram Delite CHSL
By Shree Ramkrishn Enterprises
RG-MH-48223 · RERA P51800017268 · Last updated on MahaRERA portal: 24 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- Completion date moved by 84 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vikram Delite CHSL is a Residential / Group Housing project by Shree Ramkrishn Enterprises in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017268 on 27 Jul 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 84 months from the original filing. 0 of the 105 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameVikram Delite CHSL
- TypeResidential / Group Housing
- Location
- Behind Ramleela Ground
- Maneklal
- Ghatkoper (West)
- Kurla
- Mumbai Suburban
- 400086
- Pincode400086
- RERA no.P51800017268
- ReraGenie IDRG-MH-48223
Builder
- NameShree Ramkrishn Enterprises
- Entity typePartnership
- PartnerPraveenkumar Uttamchand Miglani
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jul 2018
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed117 files
Current status
Figures as on 24 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vikram Residency | NA | 12 | 10 | 105 | 0 | 105 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Vikram Residency: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed186
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Vikram Residency | NA | Rs 28.69 cr | Rs 28.69 cr |
| - | NA | Rs 17.86 cr | Rs 17.56 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vistar Architects |
| Engineer | Vedika Enterprises |
| Engineer | Mandeep Desai |
| Chartered Accountant | Shahnaz & co. |
| Chartered Accountant | Lalit R Mehta |
| Partner | Role in project |
|---|---|
| Shree Ramkrishn Enterprises | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Navel Permission not being given Project is stuck
Litigation declared3
| Case | Court | Status |
|---|---|---|
| SL/413/2016/2016 | High Court | Closed |
| WP/3543/2018/2018 | High Court | Closed |
| SL/413/2016/2016 | Mumbai High Court | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Aug 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement certificateFile: Further CC -8th Floor.pdf | 24 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Q4 25-26 Vikram Delite.pdf | 24 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Q1 26-27 Vikram Delite.pdf | 24 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4 25-26 Vikram Delite.pdf | 24 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 Q1 26-27 Vikram Delite.pdf | 24 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 25-26 Vikram Delite New.pdf | 24 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Q1 26-27 Vikram Delite.pdf | 24 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 25-26 Vikram Delite.pdf | 24 Aug 2026 |
| Form 1File: FORM-1 Q2 25-26.pdf | 4 Mar 2026 |
| Form 2File: FORM-2 Q2 25-26.pdf | 4 Mar 2026 |
| Form 3File: FORM-3 Q2 25-26.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND BOOKED INVENTORY Q2 25-26.pdf | 4 Mar 2026 |
| Form 1File: Form 1 Q3 25-26.pdf | 4 Mar 2026 |
| Form 2File: Form 2 Q3 25-26.pdf | 4 Mar 2026 |
| Form 3File: Form 3 Q3 25-26.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND BOOKED INVENTORY Q3 25-26.pdf | 4 Mar 2026 |
| Form 1File: Form 1 Q1 25-26.pdf | 29 Jan 2026 |
| Form 2File: Form 2 Q1 25-26.pdf | 29 Jan 2026 |
| Form 3File: Form 3 Q1 25-26 FINAL.pdf | 29 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked Q1 25-26 FINAL.pdf | 29 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM-5 24-25.pdf | 7 Jan 2026 |
| Form 1File: Form-1 Q4 24-25.pdf | 18 Jul 2025 |
| Form 2File: Form-2 Q4 24-25.pdf | 18 Jul 2025 |
| Form 3File: Form-3 Q4 24-25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold inventory Q4 24-25.pdf | 18 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 8 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q3 24-25.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q3 24-25.pdf | 3 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Q3 24-25.pdf | 3 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q3 24-25.pdf | 3 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and booked inventory Q3 24-25.pdf | 3 Mar 2025 |
| CERSAI detailsFile: Cersai declaration Q3 24-25.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Q22425.pdf | 14 Nov 2024 |
| Certificates of CA (Form 3)File: Form3Q22425.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Q22425.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: InventoryQ22425.pdf | 14 Nov 2024 |
| CERSAI detailsFile: CersaiQ22425.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Q12425.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Q12425.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: soldandbooked inventoryQ12425.pdf | 13 Aug 2024 |
| CERSAI detailsFile: CersaiQ12425.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: Form3Q12425.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect certificate Q-4 -23-24.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineeers certificate Q-4-23-24.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Engineers certificate of quality compliance Q4-23-24.pdf | 21 May 2024 |
| CERSAI detailsFile: Declaration for cersai Q4- 23-24.pdf | 21 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and booked inventory Q-4 -23-24.pdf | 21 May 2024 |
| Certificates of CA (Form 3)File: Form-3 CA certificate Q-4-23-24.pdf | 21 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q 3 F Y 23-24.pdf | 23 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q 3 F Y 23-24.pdf | 23 Feb 2024 |
| CERSAI detailsFile: Declaration for CERSAI q3 FY 23-24.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and booked flat inventory Q 3 FY 23-24.pdf | 23 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 Q3 f y 23-24_compressed.pdf | 23 Feb 2024 |
| Certificates of CA (Form 3)File: SRE - FORM 3.pdf | 19 Dec 2023 |
| Certificates of CA (Form 3)File: Form-3 IInd qtr -FY2023-24.pdf | 19 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Q-2 (23-24).pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineeers Certificate Q-2 (23-24).pdf | 23 Nov 2023 |
| CERSAI detailsFile: cersai declaraton Q-2 (23-24).pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: sold and booked inventory Q-2 (23-24).pdf | 23 Nov 2023 |
| Certificates of CA (Form 3)File: FORM 3-4qtr FY 2022-23.pdf | 8 Sep 2023 |
| Certificates of CA (Form 3)File: Foam3 oct-22 to dec-22.pdf | 8 Sep 2023 |
| Declaration in FORM BFile: FORM B.pdf | 23 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B Q-1 2023-24.pdf | 23 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-06-30 Form 1Architect certificate vikram.pdf | 22 Aug 2023 |
| CERSAI detailsFile: Declaration for CERSAI Q 1 (2023-24).pdf | 22 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Q4 23-24 DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 22 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Q1 23-24 DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 22 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 22_23 Form 31032023.pdf | 19 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 22-23 Form -2 QTR 4 -310323.pdf | 19 Aug 2023 |
| CERSAI detailsFile: Declaration for CERSAI 310323.pdf | 19 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf | 17 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SRE - RERA FORM 5 - CA CERTIFICATE.pdf | 17 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY- SIGNED.pdf | 11 Aug 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 20 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: status of formation of legal entity.pdf | 20 Apr 2023 |
| Status of ConveyanceFile: status of conveyance.pdf | 20 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SRE RERA FORM 5 FY 21-22.pdf | 4 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate (vedika) for rera purpose-310322.pdf | 16 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate (vedika) for rera purpose-300622.pdf | 16 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 117 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Vikram Delite CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Maneklal, Ghatkoper (West)6,700+ in Mumbai Suburban
Atul Life Phase I
ATUL PROJECTS INDIA PVT LTD
SERENE CITY
SANGHVI BUILDTECH LLP
Neelyog Regent
Ratan Builders
Imperial Indrapuram B & C
Imperial Global Infra
HERITAGE AHURA RESIDENCY
KERSI JAMSHED RANDERIA
O AND S BUSINESS SUITES
SUCHITA ORANGE HDM PROJECT
See every Mumbai Suburban project, with the district possession charts
Builder: Shree Ramkrishn Enterprises
Shree Ramkrishn Enterprises has 1 registration on MahaRERA, including Vikram Delite CHSL. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Vikram Delite CHSL is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vikram Delite CHSL?
The registered promoter entity is Shree Ramkrishn Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vikram Delite CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Vikram Delite CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vikram Delite CHSL?
The professionals named in the filing: Architect: Vistar Architects; Engineer: Vedika Enterprises; Engineer: Mandeep Desai; Chartered Accountant: Shahnaz & co.; Chartered Accountant: Lalit R Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vikram Delite CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback