Home / Browse projects / Nashik, Maharashtra / VIKAS NAGAR PHASE II

Registration lapsed No litigation declared Others project

VIKAS NAGAR PHASE II

By SHREE SANKET DEVELOPERS

RG-MH-84703 · RERA P51600021872 · Last updated on MahaRERA portal: 5 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
30 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

VIKAS NAGAR PHASE II is a Others project by SHREE SANKET DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600021872 on 8 Aug 2019. Possession was promised by 21 Jun 2024 and is now 28 months past that date.

At a glance

Project

  • NameVIKAS NAGAR PHASE II
  • TypeOthers
  • Location
    • SOYGAON
    • Malegaon (M Corp.)
    • Malegaon
    • Nashik
    • 423203
  • Pincode423203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600021872
  • ReraGenie IDRG-MH-84703

Builder

  • NameSHREE SANKET DEVELOPERS
  • Entity typePartnership
  • PartnersYOGESH NEMICHAND MODI, DEEPAK NEMICHAND MODI, RAJENDRA MADHUKAR BHAMARE
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

28 months past promisethis monthRegisteredAug 2019PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Aug 2019
  • Promised completion21 Jun 2024
  • Revised completionNone
  • Buildings6 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK ANA30000
BLOCK BNA20000
BLOCK CNA20000
BLOCK DNA20000
BLOCK ENA20000
BLOCK FNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 5 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

BLOCK A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLOCK B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLOCK C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BLOCK D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLOCK F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,146 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
VIKAS SAMPATLAL SHARMAThane (M Corp.)Thane
SANGEETA ASHOK SHARMAThane (M Corp.)Thane
MEENA VIKAS SHARMAThane (M Corp.)Thane

Approvals and building plan

Permissible FSI2858.32
Proposed, not sanctioned2,858 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI PUTLA MALEGAON

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADHUSUDAN B KABRA
EngineerSANTOSH Y KOKANE
Chartered AccountantPRANESH LODHA
PartnerRole in project
SHREE SANKET DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jun 2024

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Sr No 60 Sanction Cancelletion.pdf5 Feb 2025
Other - TechnicalFile: Sr No 60 Sanction Cancelletion.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VN_Phase 2_311223.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VN_Phase 2_300924.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VN_Phase 2_300624.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VN_Phase 2_310324.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VN_Phase 2_310324.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VN_Phase 2_300923.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Phase II 2024-25_300624.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Phase II 2024-25_300924.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 310324.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A VN Ph2 _31032024.pdf12 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Architect Completion Certificate Phase-II Vikas Nagar.pdf4 Dec 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_31032024.pdf4 Dec 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_30062024.pdf4 Dec 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_30092024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.PDF21 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.PDF21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23-24_VN P2.PDF20 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Phase 2 Part Completion.PDF20 Jun 2024
Disclosure of sold/ booked inventoryFile: Vikas Nagar Inventory Sheet Phase II_310324.PDF25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 300622.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 300922.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 311222.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 310323.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 300623.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VN Form 1 - Phase II 311223.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062022 form 2 - Phase II Vikas Nagar.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092022 form 2 - Phase II Vikas Nagar.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122022 form 2 - Phase II Vikas Nagar.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032023 form 2 - Phase II Vikas Nagar.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062023 form 2 - Phase II Vikas Nagar.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_30062022.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_30092022.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_31122022.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_31032023.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_30062023.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_31122023.pdf4 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vikas Nagar Phase-2 Rera Cetificate.PDF1 Dec 2023
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_30092023.pdf28 Nov 2023
Disclosure of sold/ booked inventoryFile: VN Phase 2_30092023.PDF25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A VN Phase 2_310323.pdf16 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_VN Phase 2_AC.PDF2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DNM_Disclosure of Interest_VN_P_2.PDF1 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2020 Vikas Nagar Phase 2_Compressed.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2021 Vikas Nagar Phase 2_Compressed.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2022 Vikas Nagar Phase 2_Compressed.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Vikas Nagar 2019-20.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Vikas Nagar 2020-21.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Vikas Nagar 2021-22.pdf22 Feb 2023
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_31032020.pdf22 Feb 2023
Certificates of CA (Form 3)File: Form 3 - V N Phase 2_31032021.pdf22 Feb 2023
Certificates of CA (Form 3)File: Form 3 - New Format V N Phase 2_31032022.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_VN Phase 2_31032020.pdf14 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A VN Phase 2_2022.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: VN P2_Non En Legal.PDF21 Dec 2022
Details of encumbrances concerned to LegalFile: VN P2_Non En Legal.PDF21 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: VN P2_Sep Ac.PDF21 Dec 2022
Deviation Report with respect to Allotment letterFile: VN P2_Deviation AL.PDF21 Dec 2022
Deviation Report with respect to model copy of AgreementFile: VN P2_Deviation AFS.PDF21 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_VN Phase 2.PDF9 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Vikas Nagar P2_Form 5.pdf16 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A_VN Ph2_31032020.pdf1 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2A_VN Ph2_31032021.pdf1 Aug 2022
CERSAI detailsFile: VN Ph 2.pdf12 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory (VN Phase 2)_compressed.pdf20 Sep 2021
Declaration about Commencement CertificateFile: Vikas Nagar Phase II_Form D.pdf25 Aug 2021
Proforma of Allotment letterFile: Allotment Letter Phase II.pdf1 Aug 2019
Building plan approvalFile: Building Plan.pdf23 Jul 2019
Layout approvalFile: Site Plan.pdf23 Jul 2019
Copy of the legal title reportFile: Title Roport Final.pdf23 Jul 2019
Copy of Layout Approval (in case of layout)File: Site Plan.pdf23 Jul 2019
Building Plan Approval (IOD)File: Building Plan.pdf23 Jul 2019
Certificates of CA (Form 3)File: CA Certificate Phase II.pdf23 Jul 2019
OtherFile: MEMORANDUM OF UNDERSTANDING.pdf23 Jul 2019
PAN CardFile: Pan card.pdf18 Jul 2019
Details of encumbrancesFile: No Encumbrance Phase II.pdf18 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Building Permission.pdf18 Jul 2019
Declaration in FORM BFile: Affidavit Phase II.pdf18 Jul 2019
Proforma of Allotment letterFile: Agreement for Sale.pdf18 Jul 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHREE SANKET GARDENP51600003519Near Hotel Yash Garden, Nilgavhan Shivar, Nashik-Aug 2017CompletedAug 2023Registered original: Jan 2022May 2023
SANKET EMPIRESHREE SANKET EMPIRE BEHIND DISTRICT COURT STATE BANK ROAD MALEGAON92-CompletedDec 2018Dec 2018

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIKAS NAGAR PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOYGAON4,100+ in Nashik

Builder: SHREE SANKET DEVELOPERS

SHREE SANKET DEVELOPERS has 7 registrations on MahaRERA, including SHREE SANKET GARDEN and SHREE SANKET EMPIRE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that VIKAS NAGAR PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VIKAS NAGAR PHASE II is delayed beyond 21 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIKAS NAGAR PHASE II?

The registered promoter entity is SHREE SANKET DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIKAS NAGAR PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIKAS NAGAR PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIKAS NAGAR PHASE II?

The professionals named in the filing: Architect: MADHUSUDAN B KABRA; Engineer: SANTOSH Y KOKANE; Chartered Accountant: PRANESH LODHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIKAS NAGAR PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIKAS NAGAR PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIKAS NAGAR PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.