Home / Browse projects / Nashik, Maharashtra / SANKET HEIGHTS
SANKET HEIGHTS
RG-MH-63251 · RERA P51600022617 · Last updated on MahaRERA portal: 11 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SANKET HEIGHTS is a Others project by SHREE SANKET DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600022617 on 9 Oct 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 15 months from the original filing. 18 of the 97 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSANKET HEIGHTS
- TypeOthers
- Location
- SANGAMESHWAR
- MALEGAON
- Sangameshwar (CT)
- Nashik
- 423203
- Pincode423203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600022617
- ReraGenie IDRG-MH-63251
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Oct 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 15 Sep 2025)
- Buildings1 building record
- Documents filed86 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SANKET HEIGHTS | NA | 11 | 11 | 68 | 29 | 97 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
SANKET HEIGHTS: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 30% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 20% |
Parking filed172
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SANKET HEIGHTS | NA | Rs 13.70 cr | Rs 12.51 cr |
| - | NA | Rs 30.00 lakh | Rs 10.15 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY GAJANAN MHALAS |
| Engineer | MR. MILIND S. RATHI |
| Engineer | Pushkar Deepak Modi |
| Chartered Accountant | CA PRANESH ABHAYKUMAR LODHA |
| Chartered Accountant | P A R S K & Co |
| Chartered Accountant | Nilambari S Parik |
| Partner | Role in project |
|---|---|
| SHREE SANKET DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDuring the course of execution, a revision in the sanctioned building plans was proposed to improve project design efficiency, optimize utilisation of the layout and provide better amenities to the allottees. The process of preparing revised designs, submitting them for approval and obtaining necessary clearances from the Planning Authority consumed considerable time. Consequently, there was disruption in the construction schedule, resulting in delay of project milestones. Additionally, the real estate market experienced lower-than-anticipated customer bookings during the relevant period. Due
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Sep 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Revised Plan.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: Form 1_15042026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Q4 SSH_compressed.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Sanket Height FORM-3_15042026.PDF | 21 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1_090226-signed.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: 02 Feb 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Sanket Height FORM-3_02022026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1-signed.pdf | 5 Dec 2025 |
| Withdrawal Update Form 2File: 18 Nov 2025.pdf | 5 Dec 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3-signed.pdf | 5 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 - Sanket Heights 310324.pdf | 18 Nov 2025 |
| Withdrawal Update Form 2File: 18 Nov 2025.pdf | 18 Nov 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3-signed.pdf | 18 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Signed.PDF | 18 Aug 2025 |
| Form 5 (FY 2019-2020)File: Form 5_FY 19-20.pdf | 12 Aug 2025 |
| Form 5 (FY 2020-2021)File: Form 5_FY 20-21.pdf | 12 Aug 2025 |
| Form 5 (FY 2021-2022)File: Form 5_FY 21-22.PDF | 12 Aug 2025 |
| Form 5 (FY 2022-2023)File: Form 5_FY 22-23 Heights.PDF | 12 Aug 2025 |
| Form 5 (FY 2023-2024)File: Form 5_23-24_Heights.PDF | 12 Aug 2025 |
| Form 2A (FY 2019-2020)File: FORM 2 A F.Y.2019-20 SH.PDF | 4 Jul 2025 |
| Form 2A (FY 2020-2021)File: FORM 2 A F.Y.2020-21 SH.PDF | 4 Jul 2025 |
| Form 2A (FY 2021-2022)File: FORM 2 A F.Y.2021-22 SH.PDF | 4 Jul 2025 |
| Form 2A (FY 2022-2023)File: FORM 2 A F.Y.2022-23 SH.PDF | 4 Jul 2025 |
| Form 2A (FY 2023-2024)File: FORM 2 A F.Y.2023-24 SH.PDF | 4 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM 2 A F.Y.2024-25 SH.PDF | 4 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_311224.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A_Heights_31032024.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanket Heights_Q1_24-25.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanket Heights_Q2_24-25.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sanket Heights_Q1_24-25.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sanket Heights_Q2_24-25.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_300924.pdf | 19 Oct 2024 |
| Declaration about Commencement CertificateFile: 3_Form D_V2.pdf | 14 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_300624.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23-24_Heights.PDF | 20 Jul 2024 |
| Declaration about Commencement CertificateFile: Form D_V1.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanket Heights 311223.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanket Heights 310324.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R1 Form 2 - Sanket Heights 311223.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R2 Form 2 - Sanket Heights 310324.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 20 Apr 2024 |
| Other - TechnicalFile: Email for CC.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A_Heights_31032024.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_310324.pdf | 15 Apr 2024 |
| Building plan approvalFile: Revised Sanction Plan.pdf | 12 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Sanction Plan.pdf | 12 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Permission_compressed.pdf | 12 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_311223.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sanket Heights_300923.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sanket Heights 23-24.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Sanket Heights_Inventory_300923.pdf | 30 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_FY 22-23.PDF | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_300923.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sanket Heights_310323.pdf | 16 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_310321.pdf | 15 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_310322.pdf | 15 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sanket Heights_310320.pdf | 13 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SSH_Disclosure of Interest_DNM.PDF | 1 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate SSH_compressed.pdf | 31 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Non Enc Legal.pdf | 19 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Non Enc Legal.pdf | 19 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A SSH_2022.pdf | 19 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank.pdf | 19 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation AL.pdf | 19 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Chartered Accountants Certificate (SSH).PDF | 21 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sanket Heights_Form 5.pdf | 16 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A_Heights_31032020.pdf | 1 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2A_Heights_31032021.pdf | 1 Aug 2022 |
| CERSAI detailsFile: SSH.pdf | 12 Apr 2022 |
| Declaration about Commencement CertificateFile: Sanket Heights_Form D.pdf | 25 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booket SSH_compressed.pdf | 19 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sanaket Heights.pdf | 31 Mar 2021 |
| OtherFile: Clarification Letter for RERA Sanket Heights.PDF | 2 Oct 2019 |
| Building plan approvalFile: Building Pla n_compressed.pdf | 30 Sep 2019 |
| Details of encumbrancesFile: self_decleration (1).pdf | 30 Sep 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Pla n_compressed.pdf | 30 Sep 2019 |
| Declaration in FORM BFile: Affidavit.pdf | 30 Sep 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 27 Sep 2019 |
| Proforma of Allotment letterFile: DRAFT - Shree Sanket Height Agreement to Sale.pdf | 26 Sep 2019 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SHREE SANKET GARDENP51600003519 | Near Hotel Yash Garden, Nilgavhan Shivar, Nashik | - | Aug 2017 | Completed | Aug 2023Registered original: Jan 2022 | May 2023 |
| SANKET EMPIRE | SHREE SANKET EMPIRE BEHIND DISTRICT COURT STATE BANK ROAD MALEGAON | 92 | - | Completed | Dec 2018 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SANKET HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MALEGAON4,100+ in Nashik
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
Bachhav Empire
Abhijit Ashok Soygaonkar
Swaroop Residency
SHREE CONSTRUCTION COMPANY
UNITY HEIGHTS
NIRMAAN ENGINEERS AND CONTRACTORS
Chintamani Elite
Anup Ramanlal Pahade
ARCHIT RESIDENCY
KIRAN PURUSHOTTAM BACHHAV
ARISTOL TOWN
FAREHA BUILDERS & DESIGNERS PRIVATE LIMITE
See every Nashik project, with the district possession charts
Builder: SHREE SANKET DEVELOPERS
SHREE SANKET DEVELOPERS has 7 registrations on MahaRERA, including SHREE SANKET GARDEN and SHREE SANKET EMPIRE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SANKET HEIGHTS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SANKET HEIGHTS?
The registered promoter entity is SHREE SANKET DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SANKET HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SANKET HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SANKET HEIGHTS?
The professionals named in the filing: Architect: SANJAY GAJANAN MHALAS; Engineer: MR. MILIND S. RATHI; Engineer: Pushkar Deepak Modi; Chartered Accountant: CA PRANESH ABHAYKUMAR LODHA; Chartered Accountant: P A R S K & Co; Chartered Accountant: Nilambari S Parik. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANKET HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback