Home / Browse projects / Nashik, Maharashtra / Chintamani Elite

Registered No litigation declared Residential / Group Housing project

Chintamani Elite

By Anup Ramanlal Pahade

RG-MH-58758 · RERA P51600055501 · Last updated on MahaRERA portal: 3 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 0.50 crore secured on the land, in favour of Bank of Maharashtra
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 80%
20 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Chintamani Elite is a Residential / Group Housing project by Anup Ramanlal Pahade in Nashik, Maharashtra, registered with MahaRERA as P51600055501 on 2 Apr 2024. Possession is promised by 31 Jan 2027. 0 of the 20 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameChintamani Elite
  • TypeResidential / Group Housing
  • Location
    • Near 60 Feet Road
    • Soygaon
    • Malegaon (M Corp.)
    • Malegaon
    • Nashik
    • 423203
  • Pincode423203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600055501
  • ReraGenie IDRG-MH-58758

Builder

  • NameAnup Ramanlal Pahade
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed40 files

Current status

0%0 of 20 units booked
22.5%Work done, per cost certificate

Figures as on 3 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Chintamani EliteNA7520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Chintamani Elite: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 3 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes15%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,089 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBank of Maharashtra
Secured amountRs 0.50 crore
CERSAI search filedYes
Declared on25 Jun 2025

Approvals and building plan

Sanctioning authorityMalegaon Municipal Corporation
Permissible FSI3102.43
Proposed, not sanctioned3,102 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBank of Maharashtra, Opp Old Bus Stand, Near Post Office, Malegaon 423203
Estimated costRs 13.30 cr
Cost incurredRs 2.99 cr
Work done22.51%
BuildingWingEstimatedIncurred
Chintamani EliteNARs 13.30 crRs 2.99 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRitesh Kankaria
EngineerAbhijeet Bhosale
Chartered AccountantPranesh Lodha
Chartered AccountantVarun Sanjay Patni
PartnerRole in project
Anup Ramanlal Pahade-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1_Sign.pdf3 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2_Sign.pdf3 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Sign.pdf3 May 2026
Form 2A (FY 2025-2026)File: Form 2A_2026.pdf3 May 2026
Form 5 (FY 2025-2026)File: Form 5 - FY 2025-26.pdf3 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1_Signed.pdf16 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2_Sign.pdf16 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Signed.pdf16 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form 1_Sign.pdf29 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2_Signed.pdf29 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form3_Sign.pdf29 Nov 2025
Form 2A (FY 2024-2025)File: 2A_2025.pdf25 Jun 2025
Form 5 (FY 2024-2025)File: Form 5_Anup Pahade.pdf11 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Declaration of Seperate Bank Account.pdf21 Mar 2024
Other - TechnicalFile: CC Email.pdf21 Mar 2024
Other - TechnicalFile: Email ID Authenticity Letter.pdf21 Mar 2024
Other - TechnicalFile: Annexure A.pdf21 Mar 2024
Layout approvalFile: Layout.pdf22 Feb 2024
Building plan approvalFile: Approved Building Plan.pdf22 Feb 2024
PAN CardFile: PAN Card.pdf22 Feb 2024
Copy of the legal title reportFile: Format A Chintamani.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Concerned to Finance.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Concerned to Legal.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Concerned to Finance.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Concerned to Legal.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Building Plan.pdf22 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert_B_310793_371WDchISign.pdf22 Feb 2024
Declaration about Commencement CertificateFile: Form D.pdf22 Feb 2024
Declaration in FORM BFile: Form B.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Chintamani Elite.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2024
CERSAI detailsFile: Cersai Undertaking.pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chintamani Elite.pdf22 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int.pdf22 Feb 2024
Proforma of Agreement for saleFile: चिंतामणी इ लाईट ड्राफ्ट.pdf22 Feb 2024
Proforma of Allotment letterFile: Allotent Letter.pdf22 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation from Model AL.pdf22 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation from Model AFS.pdf22 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Chintamani BuildconS NO 47 PLOT NO 22 Soygaon Sangmeshwar Road Malegaon 42320324CompletedDec 2020Late, Jun 2021

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Chintamani Elite on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Soygaon4,100+ in Nashik

2 kmChintamani EliteCompleted 2Lapsed / revoked 4Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Anup Ramanlal Pahade

Anup Ramanlal Pahade has 1 registration on MahaRERA, including Chintamani Elite. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Chintamani Elite is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chintamani Elite?

The registered promoter entity is Anup Ramanlal Pahade, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chintamani Elite?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chintamani Elite?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chintamani Elite?

The professionals named in the filing: Architect: Ritesh Kankaria; Engineer: Abhijeet Bhosale; Chartered Accountant: Pranesh Lodha; Chartered Accountant: Varun Sanjay Patni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chintamani Elite?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chintamani Elite. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chintamani Elite to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.