Home / Browse projects / Nashik, Maharashtra / VIJAY SNEH
VIJAY SNEH
RG-MH-02591 · RERA P51600008562 · Last updated on MahaRERA portal: 19 Apr 2023
Source: official MahaRERA filing
Red flags
- Completion date moved by 67 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VIJAY SNEH is a Residential / Group Housing project by JAYDEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600008562 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Jul 2024. The completion date has moved by 67 months from the original filing.
At a glance
Project
- NameVIJAY SNEH
- TypeResidential / Group Housing
- Location
- Nashik
- 422008
- Pincode422008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600008562
- ReraGenie IDRG-MH-02591
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Aug 2017
- Promised completion30 Jul 2024
- Revised completionRevised to 30 Jul 2024 (originally 31 Dec 2018)
- Buildings5 building records
- Documents filed39 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VIJAYSNEH A | NA | 2 | 0 | 0 | 0 | 0 |
| VIJAY SNEH B | NA | 2 | 0 | 0 | 0 | 0 |
| VIJA SNEH C | NA | 2 | 0 | 0 | 0 | 0 |
| VIJAY SNEH D | NA | 5 | 0 | 0 | 0 | 0 |
| VIJAY SNEH E | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 19 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
VIJAYSNEH A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
VIJAY SNEH B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
VIJA SNEH C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
VIJAY SNEH D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
VIJAY SNEH E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| VIJAYSNEH A | 0 | 5 | 5 |
| VIJAY SNEH B | 0 | 6 | 6 |
| VIJA SNEH C | 0 | 6 | 6 |
| VIJAY SNEH D | 1 | 0 | 1 |
| VIJAY SNEH E | 7 | 0 | 7 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJIT GHODKE |
| Partner | Role in project |
|---|---|
| JAYDEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe reason for extending completion date is that we couldn't complete our project work during lockdown period.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Oct 2019
Documents filed39
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a.pdf | 19 Apr 2023 |
| CERSAI detailsFile: form 2a.pdf | 19 Apr 2023 |
| Layout approvalFile: Vijay Sneh new 3 new (1)_compressed.pdf | 12 Apr 2023 |
| Building plan approvalFile: Vijay Sneh new 3 new (1)_compressed.pdf | 12 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: Vijay Sneh new 3 new (1)_compressed.pdf | 12 Apr 2023 |
| Building Plan Approval (IOD)File: Vijay Sneh new 3 new (1)_compressed.pdf | 12 Apr 2023 |
| Certificates of CA (Form 3)File: VIJAY SNEH (4)_compressed_compressed (1).pdf | 12 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: VIJAY SNEH E .pdf | 12 Apr 2023 |
| Declaration in FORM BFile: FORM B 274.pdf | 21 Jan 2022 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 20 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Jay_Devp_ 274_N_Form_2 (3).pdf | 20 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: 274 vijay sneh (1).pdf | 20 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Cartificate.pdf | 19 Jan 2022 |
| Declaration about Commencement CertificateFile: S NO 274 COMMM.pdf | 20 Jul 2021 |
| OtherFile: sr no 274 2 2 ब 1 compressed.pdf | 20 Jul 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: sr no 274 2 2 ब 1 compressed.pdf | 23 Jun 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: vijay sneh12.pdf | 27 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: VIJAY SNEH JAY DEVELOPERS.pdf | 7 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: VIJAY SNEH.pdf | 11 Dec 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VIJAY SNEH.pdf | 11 Oct 2019 |
| Certificates of CA (Form 3)File: VIJAY SNEH CA.pdf | 10 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects_274_Sneh.pdf | 31 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Vijay_Sneh.pdf | 31 Oct 2017 |
| Certificates of CA (Form 3)File: VIJAY SNEH 274.pdf | 31 Oct 2017 |
| Building plan approvalFile: plan1.pdf | 31 Jul 2017 |
| Layout approvalFile: plan2.pdf | 31 Jul 2017 |
| PAN CardFile: jay developer pancard.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Encumbrances_Sneh.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: plan2.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: plan1.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: img03769.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Form_B_Sneh.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects_274_Sneh.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGGINEER SNEH.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA SNEH.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: agreement.pdf | 31 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ADITYA TOWER APARTMENT | MAKAMALBAD | 16 | Completed | Jun 2010 | Late, Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 39 filed documents as one ZIP, foldered, with a manifest
Keep VIJAY SNEH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Malpani Central
Ashish Hemant Malpani
SHRIRAM PARK
RAMBHOOMI DEVELOPERS LLP
Vakratund Annex
Vijayamrut Builders
The Reserve
BAGAD PROPERTIES
The Shivneri
Mahadevi Construction Co
QASRUL KHULAFA 3
Makani Buildcon
See every Nashik project, with the district possession charts
Builder: JAYDEVELOPERS
JAYDEVELOPERS has 2 registrations on MahaRERA, including VIJAY GALAXY and VIJAY SNEH. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if VIJAY SNEH is delayed beyond 30 Jul 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VIJAY SNEH?
The registered promoter entity is JAYDEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VIJAY SNEH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VIJAY SNEH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VIJAY SNEH?
The professionals named in the filing: Architect: AJIT GHODKE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIJAY SNEH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback