Home / Browse projects / Nashik, Maharashtra / QASRUL KHULAFA 3

Registered No litigation declared Others project

QASRUL KHULAFA 3

By Makani Buildcon

RG-MH-83008 · RERA P51600055345 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 90%
47 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

QASRUL KHULAFA 3 is a Others project by Makani Buildcon in Nashik, Maharashtra, registered with MahaRERA as P51600055345 on 18 Mar 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 2 of the 49 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameQASRUL KHULAFA 3
  • TypeOthers
  • Location
    • Nashik
    • 422008
  • Pincode422008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600055345
  • ReraGenie IDRG-MH-83008

Builder

  • NameMakani Buildcon
  • Entity typePartnership
  • GSTIN27ABJFM0897R1Z9
  • PartnersJay Nileshkumar Patel, NILESH ISHWAR BHAI PATEL
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2024First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed74 files

Current status

4%2 of 49 units booked
39.0%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Qasrul Khulafa 3NA107391049

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

Qasrul Khulafa 3: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor90%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed142

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots142
Closed/Covered114
Open Space28

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,070 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Sep 2024
LandownerVillageDistrict
Laxmi DevelopersNashikNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI4325.19
Proposed, not sanctioned4,325 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShree Ganesh Plaza,Nashik-422002
Estimated costRs 6.79 cr
Cost incurredRs 2.65 cr
Work done39.0%
BuildingWingEstimatedIncurred
Qasrul Khulafa 3NARs 6.79 crRs 2.65 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURESH NARSIH MAWANI
EngineerYOGESH ASHOK THATTE
Chartered AccountantADARSH ARVIND PATEL
Chartered AccountantYASH SUNIL SHAH
PartnerRole in project
Makani Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03122518507Dec 2026 → Dec 2027

Reason as filed by the promoterDue to slower-than-anticipated market absorption in the region and the absence of bookings till date, it is difficult to maintain the originally projected pace of construction. To ensure that the project is completed in a timely, compliant, and financially stable manner without compromising on quality standards, we request an extension of the project completion date up to 31/12/2027.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Arc Certificate Tulsi Pride 31032026_.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate Tulsi Pride 31032026.pdf27 May 2026
Withdrawal Update Form 3File: Form3 Tulsi Pride 31032026.pdf27 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Tulsi Pride 31122025.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Tulsi Pride 31122025.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Tulsi Pride 311122025.pdf5 Feb 2026
Withdrawal Update Form 1File: Form 1 Arch Certificate Tulsi Pride 30092025.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2 Eng Certificate Tulsi Pride 30092025.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate 30092025.pdf24 Nov 2025
Form 5 (FY 2024-2025)File: CA Certificate Annual Report Tulsi Pride_20251008140340.pdf9 Oct 2025
Form 1File: Form 1 TP 31032024.pdf14 Aug 2025
Form 2File: Form 2 TP 31032024.pdf14 Aug 2025
Form 3File: Form 3 TP 31032024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Declaration 31032024.pdf14 Aug 2025
Form 1File: Form 1 TP 30062024.pdf14 Aug 2025
Form 2File: Form 2 TP 30062024.pdf14 Aug 2025
Form 3File: Form 3 TP 30062024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Declaration 30062024.pdf14 Aug 2025
Form 1File: Form 1 Architect Certificate TP 30092024.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate TP 30-09-2024.pdf14 Aug 2025
Form 3File: Form 3 CA Certificate TP 30092024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Declaration 30092024.pdf14 Aug 2025
Form 1File: 31122024 Form 1 Tulsi Pride.pdf14 Aug 2025
Form 2File: 31122024 Form 2 Tulsi Pride.pdf14 Aug 2025
Form 3File: 31122024 Form 3 Tulsi Pride.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: 31122024 Sold Unsold Tulsi Pride.pdf14 Aug 2025
Withdrawal Update Form 1File: Form 1 TP Architect Certificate 30062025.pdf14 Aug 2025
Withdrawal Update Form 2File: Form 2 TP Engineer Certificate 30062025.pdf14 Aug 2025
Withdrawal Update Form 3File: Form 3 TP CA Certificate 30062025.pdf14 Aug 2025
Form 1File: Form 1 Architect Certificate Tulsi Pride 31032025.pdf15 May 2025
Form 2File: Form 2 Enigneer Certificate Tulsi Pride 31032025.pdf15 May 2025
Form 3File: Form 3 CA Certificate Tulsi Pride 31032025.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Declaration Tulsi Pride 31032025.pdf15 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 Form 1 Tulsi Pride.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31122024 Form 3 Tulsi Pride.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122024 Form 2 Tulsi Pride.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: 31122024 Sold Unsold Tulsi Pride.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate TP 30-09-2024.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate TP 30092024.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate TP 30092024.pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Tulsi Pride 30092024.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 TP 31032024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 TP 30062024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TP 31032024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TP 30062024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TP 31032024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TP 30062024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration 31032024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration 30062024.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Tulsi Pride FY23-24.pdf15 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 Tulsi Pride FY23-24.pdf4 Oct 2024
Copy of the legal title reportFile: Tilte Report Tulsi Pride_20240201204949 (1)_compressed.pdf6 Mar 2024
Copy of the legal title reportFile: Title Report Tulsi Pride_20240213193127 (1).pdf6 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: interestinotherentities.pdf20 Feb 2024
Proforma of Agreement for saleFile: Rera AOS Eng Draft.pdf20 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200290708088_For_Asset_Based_Search_20_12_2023_13_24_41_251.pdf20 Dec 2023
CERSAI detailsFile: 2 CERSAI details (1).pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Tulsi PRIDE.pdf20 Dec 2023
Details of encumbrances concerned to FinanceFile: FINANCE DECLARATION.pdf19 Dec 2023
Details of encumbrances concerned to LegalFile: FINANCE DECLARATION.pdf19 Dec 2023
Building plan approvalFile: BUILDING PLAN.pdf23 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf23 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK Acc declaration.pdf23 Sep 2023
Declaration about Commencement CertificateFile: Commencement certificate.pdf20 Sep 2023
Layout approvalFile: Tulsi Pride Layout.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: Tulsi Pride Layout.pdf16 Sep 2023
Proforma of Allotment letterFile: Allotment_Letter As per Rera.pdf16 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: building permission nilesh patel.pdf13 Sep 2023
Declaration in FORM BFile: Form B-Promoter.pdf13 Sep 2023
PAN CardFile: 1 PAN Card (3).pdf11 Aug 2023
Details of encumbrances concerned to FinanceFile: enc legal.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: enc legal.pdf11 Aug 2023
Deviation Report with respect to Allotment letterFile: enc allotment letter.pdf11 Aug 2023
Deviation Report with respect to model copy of AgreementFile: enc agreement.pdf11 Aug 2023

How this compares with Nashik

4%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep QASRUL KHULAFA 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmQASRUL KHULAFA 3Completed 90Lapsed / revoked 26Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: Makani Buildcon

Makani Buildcon has 2 registrations on MahaRERA, including Tulsi Tirth Apartment and QASRUL KHULAFA 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if QASRUL KHULAFA 3 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of QASRUL KHULAFA 3?

The registered promoter entity is Makani Buildcon, a partnership as per the filing. Its GSTIN 27ABJFM0897R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in QASRUL KHULAFA 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for QASRUL KHULAFA 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at QASRUL KHULAFA 3?

The professionals named in the filing: Architect: SURESH NARSIH MAWANI; Engineer: YOGESH ASHOK THATTE; Chartered Accountant: ADARSH ARVIND PATEL; Chartered Accountant: YASH SUNIL SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in QASRUL KHULAFA 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About QASRUL KHULAFA 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save QASRUL KHULAFA 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.