Home / Browse projects / Nashik, Maharashtra / Malpani Central
Malpani Central
RG-MH-70007 · RERA P51600052986 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Malpani Central is a Others project by Ashish Hemant Malpani in Nashik, Maharashtra, registered with MahaRERA as P51600052986 on 10 Oct 2023. Possession is promised by 31 Dec 2028. 18 of the 106 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameMalpani Central
- TypeOthers
- Location
- Near Divya Adlabs
- Untwadi - Ambad Link Road
- Trimurti Chowk
- Nashik
- Nashik (M Corp.)
- Nashik
- 422008
- Pincode422008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600052986
- ReraGenie IDRG-MH-70007
Builder
- NameAshish Hemant Malpani
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Oct 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Malpani Central | NA | 8 | 6 | 0 | 106 | 106 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
Malpani Central: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 35% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 25% |
Parking filed201
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Hemlata Hemant Malpani | Nashik (M Corp.) | Nashik |
| Jayesh Somnath Malpani | Nashik (M Corp.) | Nashik |
| Ujjwala Somnath Malpani | Nashik (M Corp.) | Nashik |
| Malpani Jain Builders | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Malpani Central | NA | Rs 2.62 cr | Rs 2.29 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ravi Amrutkar |
| Engineer | Sanjeev Patel |
| Engineer | Akash Rajendra Avhad |
| Chartered Accountant | Paresh Sabadra |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | P N Sabadra and Associates |
| Partner | Role in project |
|---|---|
| Ashish Hemant Malpani | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM -2A MALPANI CENTRAL MARCH-2026.pdf | 1 Jul 2026 |
| Form 2A (FY 2023-2024)File: FORM -2A March 2024.pdf | 1 Jul 2026 |
| Form 2A (FY 2024-2025)File: FORM -2A MARCH-2025.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: Malpani Central - Architect Certificate March 2026.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: ER Certificate.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: CA Certificate-Final.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: AR - Malpani central .pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: ER CERT MALPANI CENTRAL _0001.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: CA Cert_Malpani Central-Dec 25 (NEW1).pdf | 27 Feb 2026 |
| Form 5 (FY 2024-2025)File: Signed RERA audit report - Malpani central final.pdf | 7 Jan 2026 |
| Form 1File: AR - sept 25.pdf | 25 Dec 2025 |
| Form 2File: ER - sept 25 .pdf | 25 Dec 2025 |
| Form 3File: CA - sept 25 -Final.pdf | 25 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure- Sept 25 - Malpani central .pdf | 25 Dec 2025 |
| Form 1File: Malpani Central-AR-Dec 24 .pdf | 8 Oct 2025 |
| Form 2File: Malpani Central-ER-Dec 24.pdf | 8 Oct 2025 |
| Form 3File: CA Cert_Malpani Central Dec-24 Final.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Malpani Central.pdf | 8 Oct 2025 |
| Form 1File: June 24 - Architect Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 2File: June 24 - Engineer Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 3File: June 24 - CA Certificate - Malpani Central - RERA (1).pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SALE JUN-2024.pdf | 8 Oct 2025 |
| Form 1File: Architect certificate Mar 25.pdf | 8 Oct 2025 |
| Form 2File: Malpani Central-ER-March-25.pdf | 8 Oct 2025 |
| Form 3File: CA-Cert-Malpani Central-March-25 final.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: March 25 - Disclosure of Inventory.pdf | 8 Oct 2025 |
| Form 1File: March 24 - Architect Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 2File: March 24 - Engineer Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 3File: March 24 - CA Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD MAR-2024.pdf | 8 Oct 2025 |
| Form 1File: Sept 24 - Architect Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 2File: Sept 24 - Engineers Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 3File: Sept 24 - Final CA Certificate - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 24 - Disclosure of Inventory - Malpani Central - RERA.pdf | 8 Oct 2025 |
| Form 1File: Architect Certificate Dec 23.pdf | 8 Oct 2025 |
| Form 2File: Engineer Certificate Dec 23.pdf | 8 Oct 2025 |
| Form 3File: CA Certiifcate Final Dec 23.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Dec 23.pdf | 8 Oct 2025 |
| Form 5 (FY 2023-2024)File: Malpani Central- RA Report_FY 23-24.pdf | 8 Oct 2025 |
| Form 1File: AR june 25.pdf | 2 Sep 2025 |
| Form 2File: ER june 25.pdf | 2 Sep 2025 |
| Form 3File: CA june 25 DSC.pdf | 2 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure june 25 - Malpani central.pdf | 2 Sep 2025 |
| Disclosure of sold/ booked inventoryFile: March 25 - Disclosure of Inventory - Malpani Central - RERA_compressed.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Cert-Malpani Central-March-25 final.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Malpani Central-ER-March-25.pdf | 22 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Malpani Central.pdf | 10 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Malpani Central-AR-Dec 24 .pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_Malpani Central Dec-24 Final.pdf | 25 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Malpani Central-ER-Dec 24.pdf | 25 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - Malpani Central.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 24 - Architect Certificate - Malpani Central - RERA.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate Sept 24.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept 24 - Engineers Certificate - Malpani Central - RERA.pdf | 4 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sept 24 - Disclosure of Inventory - Malpani Central - RERA.pdf | 4 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5 sign copy.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 24 - Architect Certificate - Malpani Central - RERA.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 24 - Engineer Certificate - Malpani Central - RERA.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 24 - CA Certificate - Malpani Central - RERA (1).pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 24 - Architect Certificate - Malpani Central - RERA.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 24 - Engineer Certificate - Malpani Central - RERA.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 24 - CA Certificate - Malpani Central - RERA.pdf | 27 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SALE JUN-2024 - converted.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD MAR-2024 - converted.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Malpani Central - RERA - Architect Certificate-Q3-23-24.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Malpani Central - RERA - Engineer Certificate-Q3-23-24.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certiifcate Final Dec 23.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Malpani Central - Disclosure of Inventory_compressed.pdf | 26 Mar 2024 |
| Other - TechnicalFile: CC.pdf | 4 Oct 2023 |
| Layout approvalFile: Plan 01.pdf | 22 Sep 2023 |
| Layout approvalFile: Plan 02.pdf | 22 Sep 2023 |
| Building plan approvalFile: Plan 01.pdf | 22 Sep 2023 |
| Building plan approvalFile: Plan 02.pdf | 22 Sep 2023 |
| PAN CardFile: ASHISH MALPANI - PAN CARD.pdf | 22 Sep 2023 |
| Copy of the legal title reportFile: Title Report - Final.pdf | 22 Sep 2023 |
| Copy of the legal title reportFile: Title Search Report.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Finance - AHM.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Legal - AHM.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Finance - AHM.pdf | 22 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Malpani Central on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Trimurti Chowk, Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 110 registered projects within 2 km.
SHRIRAM PARK
RAMBHOOMI DEVELOPERS LLP
Vakratund Annex
Vijayamrut Builders
The Reserve
BAGAD PROPERTIES
The Shivneri
Mahadevi Construction Co
QASRUL KHULAFA 3
Makani Buildcon
Sudha Heights
Sudha Buildcon
See every Nashik project, with the district possession charts
Builder: Ashish Hemant Malpani
Ashish Hemant Malpani has 1 registration on MahaRERA, including Malpani Central. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Malpani Central is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Malpani Central?
The registered promoter entity is Ashish Hemant Malpani, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Malpani Central?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Malpani Central?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Malpani Central?
The professionals named in the filing: Architect: Ravi Amrutkar; Engineer: Sanjeev Patel; Engineer: Akash Rajendra Avhad; Chartered Accountant: Paresh Sabadra; Chartered Accountant: RSPH & Associates; Chartered Accountant: P N Sabadra and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Malpani Central?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback