RG-MH-83343 · RERA P51800012941 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 71 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 71 months from the original
4 of 11Construction stages donefurthest along: Staircases, 90%
12 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED is a Residential / Group Housing project by VIGHNESHWAR COOP HOUSING SOCIETY LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012941 on 7 Sep 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 71 months from the original filing. 40 of the 52 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED
  • TypeResidential / Group Housing
  • Location
    • S N M Marg
    • New Maneklal Estate
    • Ghatkopar West Mumbai
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012941
  • ReraGenie IDRG-MH-83343

Builder

  • NameVIGHNESHWAR COOP HOUSING SOCIETY LIMITED
  • Entity typeSociety
  • ChairpersonVIJAY SATYAWAN GAWDE
  • SecretoryLAXMIDAS JERAM BHANUSHALI

Key dates

this monthRegisteredSep 2017First promiseJan 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Sep 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 22 Jan 2021)
  • Buildings1 building record
  • Documents filed121 files

Current status

77%40 of 52 units booked
56.8%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIGHNESHWAR CHS LTDNA211851152

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

VIGHNESHWAR CHS LTD: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,469 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI6363.48
Proposed, not sanctioned3,476 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR WEST MUMBAI
Estimated costRs 21.43 cr
Cost incurredRs 12.16 cr
Work done56.75%
BuildingWingEstimatedIncurred
VIGHNESHWAR CHS LTDNARs 20.36 crRs 12.16 cr
-NARs 1.07 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRISM ARCHITECTS AND DESIGNERS
EngineerPragnesh Oza
EngineerS K Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantCA Rutuja Narsingh & Associates
PartnerRole in project
VIGHNESHWAR COOP HOUSING SOCIETY LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800020915Jan 2021 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 72.73% allottees for purpose of extension of RERA registration period of the said project.

EXT51800010425Jan 2021 → Dec 2023

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain has broken down. It appears that it is going to take a lot of time to normalize the real estate industry.

EA06012619320Jan 2021 → Dec 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Vigneshwar CHSL as on June 2026.PDF4 Aug 2026
Withdrawal Update Form 2File: Form 2 - Vigneshwar CHSL as on June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 - Vigneshwar CHSL as on June 2026.pdf4 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A Vighneshwar Chs Ltd For 2023-24.pdf17 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A Vighneshwar Chs Ltd For 2024-25.pdf17 Jun 2026
Withdrawal Update Form 1File: Form 1 - Vigneshwar CHSL as on Dec 2025.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - Vigneshwar CHSL as on March 2026.PDF10 Jun 2026
Withdrawal Update Form 2File: Form 2 - Vigneshwar CHSL as on Dec 2025.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 - Vigneshwar CHSL as on March 2026.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 - Vigneshwar CHSL as on Dec 2025.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 - Vigneshwar CHSL as on March 2026.pdf10 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 - Vighneshwar CHSL for FY 2023-24.pdf27 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 - Vighneshwar CHSL for FY 2024-25.pdf27 Feb 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf6 Jan 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf6 Jan 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf6 Jan 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 Vighneshwar Coop Hsg Soc as on June 2024.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 Vighneshwar Coop Hsg Soc as on June 2024.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 Vighneshwar Coop Hsg Soc as on June 2024.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 Vighneshwar Coop Hsg Soc as on June 2024.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 of Vighneshwar CHS Ltd as on 30th June 2024.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 of Vighneshwar CHS Ltd as on 30th June 2024.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 - Vigneshwar CHSL as on June 2025.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 - Vigneshwar CHSL as on Sep 2025.pdf6 Jan 2026
Building plan approvalFile: Drawing 9.pdf31 Dec 2025
Certificates of CA (Form 3)File: form3.pdf29 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf29 Apr 2025
Certificates of CA (Form 3)File: Form 3 Vigneshwar CHSL as on 31st December 2024.pdf20 Apr 2025
Certificates of CA (Form 3)File: Form 3 Vigneshwar CHSL as on 31st March 2025.pdf20 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vighneshwar Coop Hsg Soc as on Dec 2024.pdf20 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vighneshwar Coop Hsg Soc as on March 2025.pdf20 Apr 2025
Certificates of CA (Form 3)File: Form 3 Vigneshwar CHSL as on 30th Sept 2024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vighneshwar Coop Hsg Soc as on Sept 2024.pdf20 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Vighneshwar CHSL as on June 2024.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vighneshwar Coop Hsg Soc as on June 2024.pdf12 Aug 2024
Certificates of CA (Form 3)File: Form 3 of Vighneshwar CHS Ltd as on 30th June 2024.pdf12 Aug 2024
Declaration in FORM BFile: Form B vighneshwar.pdf31 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 24.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf30 May 2024
Certificates of CA (Form 3)File: Form 3 Mar 24_11zon.pdf30 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vighneshwar Coop Hsg Soc as on March 2024.pdf18 May 2024
Certificates of CA (Form 3)File: Form 3 Vighneshwar Coop Hsg Soc 31st Dec 2023.pdf18 May 2024
Certificates of CA (Form 3)File: Form 3 Vighneshwar Coop Hsg Soc 31st Mar 2024.pdf18 May 2024
Declaration about Commencement CertificateFile: Format D.pdf20 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Annexure -C Form-2A 2019-20.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Annexure -C Form 2A 2021-22.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Annexure -C Form -2A 2022-23.pdf20 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf20 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf20 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Vighneshwar CHSL as on Dec 2023.pdf18 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Vighneshwar CHSL as on Dec 2023.pdf18 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Vighneshwar Coop Hsg Soc 31st Dec 2023.pdf15 Mar 2024
Certificates of CA (Form 3)File: Form 3 Vighneshwar Coop Hsg Soc 31st Dec 2023.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Vighneshwar CHSL for FY 2022-23.pdf15 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Vighneshwar CHSL as on Sept 2023.pdf1 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Vighneshwar CHSL as on Sept 2023.pdf1 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Vighneshwar CHSL as on June 2023.pdf13 Oct 2023
Certificates of CA (Form 3)File: Form 3- Vighneshwar CHS Ltd - 30-06-2023.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Vighneshwar CHSL as on 30-09-2022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Vighneshwar CHSL as on 31-12-2022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Vighneshwar CHSL as on 31-03-2023.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Vighneshwar CHS Ltd as on 30-09-2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Vighneshwar CHS Ltd as on 31-12-2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Vighneshwar CHS Ltd as on 31-03-2023.pdf17 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Vighneshwar CHS FY 2020-21.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Vighneshwar CHS FY 2021-22.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vighneshwar CHSL Mar 22 - Form 2.pdf8 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vighneshwar CHSL Jun 22 - Form 2.pdf8 Apr 2023
Certificates of CA (Form 3)File: Form 3- Vighneshwar CHS Ltd - March 22.pdf8 Apr 2023
Certificates of CA (Form 3)File: Form 3 - Vighneshwar CHS Ltd as on June 2022.pdf8 Apr 2023

How this compares with Mumbai Suburban

77%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 71 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Maneklal Estate, Ghatkopar West Mumbai6,700+ in Mumbai Suburban

2 kmVIGHNESHWAR COOPERATIVE Completed 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: VIGHNESHWAR COOP HOUSING SOCIETY LIMITED

VIGHNESHWAR COOP HOUSING SOCIETY LIMITED has 1 registration on MahaRERA, including VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is VIGHNESHWAR COOP HOUSING SOCIETY LIMITED, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: PRISM ARCHITECTS AND DESIGNERS; Engineer: Pragnesh Oza; Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: CA Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.