Home / Browse projects / Nashik, Maharashtra / Verizon
Verizon
RG-MH-08775 · RERA P51600014206 · Last updated on MahaRERA portal: 28 May 2024
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Verizon is a Commercial project by Bafna Realtors Pvt Ltd in Nashik, Maharashtra, registered with MahaRERA as P51600014206 on 14 Nov 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameVerizon
- TypeCommercial
- Location
- Nashik
- 422002
- Pincode422002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600014206
- ReraGenie IDRG-MH-08775
Builder
- NameBafna Realtors Pvt Ltd
- Entity typeCompany
- Managing DirectorAbhay Kantilal Tated
- Other registrations7 more →
- Completed7 of 8
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on14 Nov 2017
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed86 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Verizon | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Verizon: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed90
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Splice Boi Tech Private Limited | Jaysingpur (M Cl) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shri Architects |
| Partner | Role in project |
|---|---|
| Bafna Realtors Pvt Ltd | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| RCS nos 1194/2012/2012 | Nashik District Court | Pending |
| EP no 1/2014/2014 | Nashik District Court | Pending |
| appeal Stamp No 23374/2017 with civil application no 747/2017/2017 | Bombay High Court | Pending |
| 63/2017/2017 | Civil Judge Senior Division Nashik | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Nov 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - LegalFile: CANCELLATION DEED-778-2-B,2520-2024_compressed.pdf | 28 May 2024 |
| Other - LegalFile: CANCELLATION DEED-778-2-B,2520-2024_compressed.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE-206.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate april to june'23.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE-206-APRIL-2023.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE-206.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE-5 JULY-2023.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE-JULY2023.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER'S CERTIFICATE-206-APRIL-2023.pdf | 22 May 2024 |
| Certificates of CA (Form 3)File: Form 3 jan-march'23.pdf | 22 May 2024 |
| Certificates of CA (Form 3)File: CHARTERED ACCOUNTANTS CERTIFICATE-206.pdf | 15 Apr 2024 |
| Certificates of CA (Form 3)File: CA CERTIFICATE-206.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE-206.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE-206.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD-206.pdf | 17 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHIECT CERTIFICATE-206.pdf | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE -206.pdf | 7 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD And UNSOLD-206.pdf | 7 Oct 2023 |
| Certificates of CA (Form 3)File: Verizon Form 3.pdf | 7 Oct 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE-206.pdf | 24 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-206.pdf | 7 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE-206.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE-206.pdf | 7 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: INFORMATION OF SOLD-UNSOLD-206.pdf | 7 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA CERTIFICATE-ANNUAL REPORT.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1)Architect's Certificate.pdf | 7 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02) Engineer's Certificate.pdf | 7 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 05 INFORMATION OF SOLD.pdf | 7 Apr 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 7 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 04 CA CERTIFICATE -ANNUAL ASSURANCE.pdf | 28 Mar 2023 |
| Declaration about Commencement CertificateFile: BRPL-DECLARATION COMMENCEMENT CERTIFICATES.pdf | 25 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI206.pdf | 7 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG ANN B 2.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENG ANN C2A.pdf | 7 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 206.pdf | 7 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3-06.pdf | 7 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE-206.pdf | 7 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFIATE-206.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf | 7 Oct 2022 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 7 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 7 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEERS CERTIFICATE.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOK.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: C A CERTIFICATE.pdf | 7 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 ARCHITECTS CERTIFICATE.pdf | 7 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 ENGINEER CERIFICATE.pdf | 7 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 03 ENGINEER CERIFICATE-FOR QUALITY ASSURANCE.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 05 INFORMATION OF SOLD.pdf | 7 Apr 2022 |
| Certificates of CA (Form 3)File: 04 CA CERTIFICATE.pdf | 7 Apr 2022 |
| Certificates of CA (Form 5)File: 04 CA CERTIFICATE -ANNUAL ASSURANCE.pdf | 7 Apr 2022 |
| Certificates of CA (Form 3)File: Annexture -D Form 3.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure -A form-1.pdf | 6 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure -B form-2.pdf | 6 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Annexure -C form-2A.pdf | 6 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOK.pdf | 6 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Verizon sold unsold.pdf | 6 Oct 2021 |
| Certificates of CA (Form 3)File: verizon form 3_compressed.pdf | 6 Oct 2021 |
| Certificates of CA (Form 5)File: Form 3_compressed.pdf | 11 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 11 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Verizon Forn 2A.pdf | 4 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Verizon Sold Unsold.pdf | 3 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 3 Aug 2021 |
| Certificates of CA (Form 3)File: Form3- 2020-21_compressed.pdf | 3 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5- 2019-2020.pdf | 3 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- 2020-21.pdf | 3 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: New Doc 2018-03-02 (1).pdf | 23 Apr 2018 |
| Building plan approvalFile: certificate verizon.pdf | 10 Nov 2017 |
| Layout approvalFile: certificate verizon.pdf | 10 Nov 2017 |
| PAN CardFile: BRPL pan Card.pdf | 10 Nov 2017 |
| Copy of Layout Approval (in case of layout)File: certificate verizon.pdf | 10 Nov 2017 |
| Building Plan Approval (IOD)File: certificate verizon.pdf | 10 Nov 2017 |
| Building plan approvalFile: Approved verizonbldg plan.pdf | 4 Nov 2017 |
| Layout approvalFile: P1.pdf | 4 Nov 2017 |
| Building plan approvalFile: Proposed FF plan_verizon.pdf | 4 Nov 2017 |
| Building plan approvalFile: Proposed GF plan_verizon.pdf | 4 Nov 2017 |
| Copy of the legal title reportFile: verizon title.pdf | 4 Nov 2017 |
| Details of encumbrancesFile: non encumbrances certificate verizon (1).pdf | 4 Nov 2017 |
| Copy of Layout Approval (in case of layout)File: P1.pdf | 4 Nov 2017 |
| Building Plan Approval (IOD)File: Approved verizonbldg plan.pdf | 4 Nov 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
Keep Verizon on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
THE CHOUPAAL
KALANTRI AND BANG PROPERTIES
Sai Pride
Jay Infrastructures
Nayantara Presidency Phase 3
Pancharatna Builcon Pvt. Ltd
Nayantara Presidency Phase 4
Pancharatna Builcon Pvt. Ltd
TRUKONS BUSINESS PARK
TEZVED BUILDCON LLP
Avenue Flora
The Avenue NX
See every Nashik project, with the district possession charts
Builder: Bafna Realtors Pvt Ltd
Bafna Realtors Pvt Ltd has 8 registrations on MahaRERA, including Anmol Nayantara City Two phase 2 and Anmol Nayantara City One Phase 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that Verizon shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Verizon is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Verizon?
The registered promoter entity is Bafna Realtors Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Verizon?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Verizon?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Verizon?
The professionals named in the filing: Architect: Shri Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Verizon?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback